Diffusion Morning Report 06/03/11
Ted Berg
tberg at stanford.edu
Fri Jun 3 06:31:28 PDT 2011
Good Morning All.
Looking good this morning. Epi Germane is low- please monitor
before running. Tylan needs a test after melted o-ring change. Tylan 2
has torch issues. No other problems at this time.
Date: 6/3/11 THICKNESS-Change at Priority
Tube Name/Number Status
Tylan 1 *up* ** ** ** **
Tylan 2 *yellow* *Failed wet qual-checking torch* ** ** *1*
Tylan 3 *up* ** ** ** **
Tylan 4 *up* ** ** ** **
Tylan 5-BBr3 *up* ** ** ** **
Tylan 6-POCl3 *up* ** ** ** **
Tylan 7-TEOS2 *up* ** *4.32/30* ** **
Tylan 8-SiGe *up* ** *1.94/30* ** **
Tylan 9-Poly *up* ** *12.7/30* ** **
Tylan 10-Nitride *down* *needs test* *15.62/30* ** **
Tylan 11-LTO *up* ** *24.73/30* ** **
Tylan 12-FGA *up* ** ** ** **
Thermco 1 *up* ** ** ** **
Thermco 2 *yellow* *no tlc flow* ** ** **
Thermco 3 *future* ** ** ** **
Thermco4 *future* ** ** ** **
Thermco Poly1 *up* *
* ** ** **
Thermco Poly2 *up* ** ** ** **
Thermco Nitride1 *up* ** ** ** **
Thermco bpsg *up* ** ** ** **
AMAT Epi *up* ** ** ** **
TEL Spa *up* ** ** ** **
Burn Box *up* ** ** ** **
Ebeam *down* *cryo compresssor dead* ** ** **
ZYGO *up* *
* ** ** **
FGA2 *up* ** ** ** **
SiH4 for furnaces ** *A on line 141 PSI* *changeover working
well* ** **
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://snf.stanford.edu/pipermail/diffusion/attachments/20110603/d32a8541/attachment.html>
More information about the diffusion
mailing list