Diffusion Morning Report 06/06/11
Ted Berg
tberg at stanford.edu
Mon Jun 6 06:10:42 PDT 2011
Good Morning All,
Looking good this morning. TEOS had high pressure. Therrmco Nitride
high pressure.Tylan 2 needs atest after torch change. Thermco 2 no tlc
flow. no other issues at this time.
Date: 6/6/11 THICKNESS-Change at Priority
Tube Name/Number Status
Tylan 1 *up* ** ** ** **
Tylan 2 *yellow* *needs test after torch change* ** ** **
Tylan 3 *up* ** ** ** **
Tylan 4 *up* ** ** ** **
Tylan 5-BBr3 *up* ** ** ** **
Tylan 6-POCl3 *up* ** ** ** **
Tylan 7-TEOS2 *down* *pressure issues* *5.63/30* ** **
Tylan 8-SiGe *up* ** *1.94/30* ** **
Tylan 9-Poly *up* ** *12.7/30* ** **
Tylan 10-Nitride *up* ** *15.88/30* ** **
Tylan 11-LTO *up* ** *24.96/30* ** **
Tylan 12-FGA *up* ** ** ** **
Thermco 1 *up* ** ** ** **
Thermco 2 *yellow* *no tlc flow* ** ** **
Thermco 3 *future* ** ** ** **
Thermco4 *future* ** ** ** **
Thermco Poly1 *up* *
* ** ** **
Thermco Poly2 *up* ** ** ** **
Thermco Nitride1 *yellow* *pressure issues* ** ** **
Thermco bpsg *up* ** ** ** **
AMAT Epi *up* ** ** ** **
TEL Spa *up* ** ** ** **
Burn Box *up* ** ** ** **
Ebeam *down* *cryo compresssor dead* ** ** **
ZYGO *up* *
* ** ** **
FGA2 *up* ** ** ** **
SiH4 for furnaces ** *A on line 113 PSI* *changeover working
well* ** **
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://snf.stanford.edu/pipermail/diffusion/attachments/20110606/e4582ef6/attachment.html>
More information about the diffusion
mailing list