Good Morning All,
Looking Ok this morning . A few issues: Epi is down for chamber
clean after Dome was coated, Tylan FGA is down for Temp issues, Tylan 1
is down for Power fail on MFS. TEOS pump and Thermco LTO pumps out for
repair.mco 2 no TLC flow. No other major issues at this time.
Date: 3/7/11 THICKNESS-Change at Priority
Tube Name/Number Status
Tylan 1 *down* *power faIL* ** ** *3*
Tylan 2 *up* ** ** ** **
Tylan 3 *up* ** ** ** **
Tylan 4 *up* ** ** ** **
Tylan 5-BBr3 *up* ** ** ** **
Tylan 6-POCl3 *up* ** ** ** **
Tylan 7-TEOS2 *down* *pump bad-out for repair* *.25/30* ** **
Tylan 8-SiGe *up* ** *.88/30* ** **
Tylan 9-Poly *up* ** *15.53/30* ** **
Tylan 10-Nitride *yellow* *door close issue* *7.89/30* ** **
Tylan 11-LTO *up* *a bit thin* *20.26/30* ** **
Tylan 12-FGA *down* *temp problems* ** ** *1*
Thermco 1 *up* ** ** ** **
Thermco 2 *yellow* *no tlc flow* ** ** **
Thermco 3 *future* ** ** ** **
Thermco4 *future* ** ** ** **
Thermco Poly1 *up* ** ** ** **
Thermco Poly2 *up* ** ** ** **
Thermco Nitride1 *up* ** ** ** **
Thermco bpsg *down* *bad pump-out for repair* ** ** **
AMAT Epi *down* *chamber coated* ** ** *2*
TEL Spa *up* ** ** ** **
Burn Box *up* ** ** ** **
Ebeam *down* *cryo compresssor going out for repair* ** ** **
ZYGO *up* *
* ** ** **
FGA2 *up* ** ** ** **
SiH4 for furnaces ** *B on line 224 PSI* *changeover working
well* ** **
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://snf.stanford.edu/pipermail/diffusion/attachments/20110307/105e7640/attachment.html>
More information about the diffusion
mailing list