Diffusion Morning Report 03/23/11
Ted Berg
tberg at stanford.edu
Wed Mar 23 06:12:43 PDT 2011
Good Morning All,
Looking OK this morning. Epi is down again-Dome devitrified again.
Tylan 1 MFS 460 out for repair. TEOS pump out for repair. Thermco LTO is
being checked out. Tylan BPSG is going down tomorrow for pull and clean.
Thermco 2 no tlc flow. Ebeam compressor is dead. No other major problems
at this time.
Date: 3/23/11 THICKNESS-Change at Priority
Tube Name/Number Status
Tylan 1 *down* *mfs out for repair* ** ** **
Tylan 2 *up* ** ** ** **
Tylan 3 *up* ** ** ** **
Tylan 4 *up* ** ** ** **
Tylan 5-BBr3 *up* ** ** ** **
Tylan 6-POCl3 *up* ** ** ** **
Tylan 7-TEOS2 *down* *pump bad-out for repair* *.25/30* ** **
Tylan 8-SiGe *up* ** *.88/30* ** **
Tylan 9-Poly *up* ** *20.67/30* ** **
Tylan 10-Nitride *up* ** *9.3/30* ** **
Tylan 11-LTO *up* *going down tomorrow for pull and clean*
*29.1/30* ** **
Tylan 12-FGA *up* ** ** ** **
Thermco 1 *up* ** ** ** **
Thermco 2 *yellow* *no tlc flow* ** ** **
Thermco 3 *future* ** ** ** **
Thermco4 *future* ** ** ** **
Thermco Poly1 *up* ** ** ** **
Thermco Poly2 *up* ** ** ** **
Thermco Nitride1 *up* ** ** ** **
Thermco bpsg *down* *checking system* ** ** *2*
AMAT Epi *down* *dome bad again* ** ** *1*
TEL Spa *up* ** ** ** **
Burn Box *up* ** ** ** **
Ebeam *down* *cryo compresssor evaluating* ** ** **
ZYGO *up* *
* ** ** **
FGA2 *up* ** ** ** **
SiH4 for furnaces ** *A on line 617 PSI* *changeover working
well* ** **
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://snf.stanford.edu/pipermail/diffusion/attachments/20110323/375b9fa3/attachment.html>
More information about the diffusion
mailing list