Diffusion Morning Report 03/24/11
Ted Berg
tberg at stanford.edu
Thu Mar 24 06:17:57 PDT 2011
Good Morning All,
Looking OK this morning. Epi is down for Dome replacement-still no
ETA for Dome, the second in 2 weeks. TEOS pump is still out for repair,
Tylan 1 mfs is out for repair. Tylan LTO is down for pull and clean.
Thermco LTO needs a test after repairs. Ebeam compressor is not
repairable. Thermco 2 No TLC flow. No other major issues at this time.
Date: 3/24/11 THICKNESS-Change at Priority
Tube Name/Number Status
Tylan 1 *down* *mfs out for repair* ** ** **
Tylan 2 *up* ** ** ** **
Tylan 3 *up* ** ** ** **
Tylan 4 *up* ** ** ** **
Tylan 5-BBr3 *up* ** ** ** **
Tylan 6-POCl3 *up* ** ** ** **
Tylan 7-TEOS2 *down* *pump bad-out for repair* *.25/30* ** **
Tylan 8-SiGe *up* ** *.88/30* ** **
Tylan 9-Poly *up* ** *20.67/30* ** **
Tylan 10-Nitride *up* ** *9.3/30* ** **
Tylan 11-LTO *down* *pull and clean* *0/30* ** *1*
Tylan 12-FGA *up* ** ** ** **
Thermco 1 *up* ** ** ** **
Thermco 2 *yellow* *no tlc flow* ** ** **
Thermco 3 *future* ** ** ** **
Thermco4 *future* ** ** ** **
Thermco Poly1 *up* ** ** ** **
Thermco Poly2 *up* ** ** ** **
Thermco Nitride1 *up* ** ** ** **
Thermco bpsg *yellow* *needs test after repair* ** ** **
AMAT Epi *down* *dome bad again* ** ** **
TEL Spa *up* ** ** ** **
Burn Box *up* ** ** ** **
Ebeam *down* *cryo compresssor evaluating* ** ** **
ZYGO *up* *
* ** ** **
FGA2 *yellow* *forming gas leak check* ** ** *2*
SiH4 for furnaces ** *A on line 617 PSI* *changeover working
well* ** **
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://snf.stanford.edu/pipermail/diffusion/attachments/20110324/0a257774/attachment.html>
More information about the diffusion
mailing list