Diffusion Morning Report 03/28/11
Ted Berg
tberg at stanford.edu
Mon Mar 28 06:45:15 PDT 2011
Good Morning All,
Looking good this morning. Tylan 1 controller is back and seems to
be working well.TEOS pump should be back today. Tylan LTO failed pump
program. Thermco LTO needs a test after repairs. Thermco Poly 1 no dep.
Amat Epi was back together on Friday not sure of status. Thermco 2 no
TLC flow. No other major issues at this time.
Date: 3/28/11 THICKNESS-Change at Priority
Tube Name/Number Status
Tylan 1 *yellow* *needs test was run over weekend* ** ** *3*
Tylan 2 *up* ** ** ** **
Tylan 3 *up* ** ** ** **
Tylan 4 *up* ** ** ** **
Tylan 5-BBr3 *up* ** ** ** **
Tylan 6-POCl3 *up* ** ** ** **
Tylan 7-TEOS2 *down* *pump bad-out for repair* *.25/30* ** **
Tylan 8-SiGe *up* ** *.88/30* ** **
Tylan 9-Poly *up* ** *20.67/30* ** **
Tylan 10-Nitride *up* ** *9.6/30* ** **
Tylan 11-LTO *yellow* *pump program failed* *3.28/30* ** *1*
Tylan 12-FGA *up* ** ** ** **
Thermco 1 *up* ** ** ** **
Thermco 2 *yellow* *no tlc flow* ** ** **
Thermco 3 *future* ** ** ** **
Thermco4 *future* ** ** ** **
Thermco Poly1 *down* *NO DEP* ** ** **
Thermco Poly2 *up* ** ** ** **
Thermco Nitride1 *up* ** ** ** **
Thermco bpsg *yellow* *needs test after repair* ** ** **
AMAT Epi *yellow* *conditioning* ** ** *2*
TEL Spa *up* ** ** ** **
Burn Box *up* ** ** ** **
Ebeam *down* *cryo compresssor dead* ** ** **
ZYGO *up* *
* ** ** **
FGA2 *up* ** ** ** **
SiH4 for furnaces ** *A on line 600 PSI* *changeover working
well* ** **
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://snf.stanford.edu/pipermail/diffusion/attachments/20110328/b1f34438/attachment.html>
More information about the diffusion
mailing list