Diffusion Morning Report 03/30/11
Ted Berg
tberg at stanford.edu
Wed Mar 30 06:29:52 PDT 2011
Good Morning All,
Looking good this morning . TEOS pump is back and being
installed.Thermco BPSG need a test after repair. Thermco 2 no TLC flow.
Ebeam compressor is dead. No other major issues at this time.
>
> Date: 3/30/11 THICKNESS-Change at Priority
> Tube Name/Number Status
> Tylan 1 *up* ** ** ** **
> Tylan 2 *up* ** ** ** **
> Tylan 3 *up* ** ** ** **
> Tylan 4 *up* ** ** ** **
> Tylan 5-BBr3 *up* ** ** ** **
> Tylan 6-POCl3 *up* ** ** ** **
> Tylan 7-TEOS2 *down* *installing pump and checkout* *.25/30* ** *1*
> Tylan 8-SiGe *up* ** *.88/30* ** **
> Tylan 9-Poly *up* ** *20.96/30* ** **
> Tylan 10-Nitride *up* ** *9.6/30* ** **
> Tylan 11-LTO *yellow* ** *4.58/30* ** **
> Tylan 12-FGA *up* ** ** ** **
> Thermco 1 *up* ** ** ** **
> Thermco 2 *yellow* *no tlc flow* ** ** **
> Thermco 3 *future* ** ** ** **
> Thermco4 *future* ** ** ** **
> Thermco Poly1 *up* ** ** ** **
> Thermco Poly2 *up* ** ** ** **
> Thermco Nitride1 *up* ** ** ** **
> Thermco bpsg *yellow* *needs test after repair* ** ** **
> AMAT Epi *yellow* *running* ** ** **
> TEL Spa *up* ** ** ** **
> Burn Box *up* ** ** ** **
> Ebeam *down* *cryo compresssor dead* ** ** **
> ZYGO *up* *
> * ** ** **
> FGA2 *up* ** ** ** **
> SiH4 for furnaces ** *A on line 600 PSI* *changeover working
> well* ** **
>
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://snf.stanford.edu/pipermail/diffusion/attachments/20110330/4720deb4/attachment.html>
More information about the diffusion
mailing list