Diffusion Morning Report 10/19/11

Ted Berg tberg at stanford.edu
Wed Oct 19 09:37:05 PDT 2011


Good Morning All,
     Looking good this morning. Thermco Poly 2 tube is broken. Epi is 
down for gas line tie ins to ICP and CCP.
      Left overs: Ammonia for Fiji- J is working on it. No othe4r issues 
at this time.

					
	Date: 	10/19/11 	THICKNESS-Change at 		Priority
Tube Name/Number 	Status 				
Tylan 1 	*up* 	** 	** 	** 	**
Tylan 2 	*up* 	** 	** 	** 	**
Tylan 3 	*up* 	** 	** 	** 	**
Tylan 4 	*up* 	** 	** 	** 	**
Tylan 5-BBr3 	*up* 	** 	** 	** 	**
Tylan 6-POCl3 	*up* 	** 	** 	** 	**
Tylan 7-TEOS2 	*up* 	** 	*10.49/30* 	** 	**
Tylan 8-SiGe 	*up* 	** 	*3.76/30* 	** 	**
Tylan 9-Poly 	*up* 	** 	*3.26/30* 	** 	**
Tylan 10-Nitride 	*yellow* 	*bubbles* 	*.11/30* 	** 	**
Tylan 11-LTO 	*up* 	** 	*7.2/30* 	** 	**
Tylan 12-FGA 	*up* 	** 	** 	** 	**
Thermco 1 	*up* 	** 	** 	** 	**
Thermco 2 	*up* 	** 	** 	** 	**
Thermco 3 	*future* 	** 	** 	** 	**
Thermco4 	*future* 	** 	** 	** 	**
Thermco Poly1 	*up* 	** 	** 	*
* 	**
Thermco Poly2 	*down* 	*tube destroyed* 	** 	** 	**
Thermco Nitride1 	*up* 	** 	** 	** 	**
Thermco bpsg 	*up* 	** 	** 	** 	**
AMAT Epi 	*down* 	*lla issues, gas line tie ins* 	** 	** 	**
TEL Spa 	*up* 	** 	** 	** 	**
Burn Box 	*up* 	** 	** 	** 	**
SEM 4160 	*up* 	** 	** 	** 	**
ZYGO 	*up* 	** 	** 	** 	**
FGA2 	*up* 	** 	** 	** 	**
SiH4 for furnaces 	** 	*B on line pressure 745 psi* 	*changeover working 
well* 	** 	**


-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://snf.stanford.edu/pipermail/diffusion/attachments/20111019/f2da3907/attachment.html>


More information about the diffusion mailing list