Diffusion Morning Report 10/20/11

Ted Berg tberg at stanford.edu
Thu Oct 20 06:51:30 PDT 2011


Good Morning All,
     Looking good this morning. All gas lines for ICP and CCP are tied 
in and signed off by SCFD. Germane for Epi is changed and will be back 
on line this morning.
     Thermco poly 2 tube change in progress. J is working with vendor 
for NH3 on Fiji. No other issues at this time.

					
	Date: 	10/20/11 	THICKNESS-Change at 		Priority
Tube Name/Number 	Status 				
Tylan 1 	*up* 	** 	** 	** 	**
Tylan 2 	*up* 	** 	** 	** 	**
Tylan 3 	*up* 	** 	** 	** 	**
Tylan 4 	*up* 	** 	** 	** 	**
Tylan 5-BBr3 	*up* 	** 	** 	** 	**
Tylan 6-POCl3 	*up* 	** 	** 	** 	**
Tylan 7-TEOS2 	*up* 	** 	*10.49/30* 	** 	**
Tylan 8-SiGe 	*up* 	** 	*3.76/30* 	** 	**
Tylan 9-Poly 	*up* 	** 	*3.41/30* 	** 	**
Tylan 10-Nitride 	*yellow* 	*no bubbles* 	*.22/30* 	** 	**
Tylan 11-LTO 	*up* 	** 	*7.26/30* 	** 	**
Tylan 12-FGA 	*up* 	** 	** 	** 	**
Thermco 1 	*up* 	** 	** 	** 	**
Thermco 2 	*up* 	** 	** 	** 	**
Thermco 3 	*future* 	** 	** 	** 	**
Thermco4 	*future* 	** 	** 	** 	**
Thermco Poly1 	*up* 	** 	** 	*
* 	**
Thermco Poly2 	*down* 	*tube destroyed* 	** 	** 	**
Thermco Nitride1 	*up* 	** 	** 	** 	**
Thermco bpsg 	*up* 	** 	** 	** 	**
AMAT Epi 	*down* 	*lla issues* 	** 	** 	**
TEL Spa 	*up* 	** 	** 	** 	**
Burn Box 	*up* 	** 	** 	** 	**
SEM 4160 	*up* 	** 	** 	** 	**
ZYGO 	*up* 	** 	** 	** 	**
FGA2 	*up* 	** 	** 	** 	**
SiH4 for furnaces 	** 	*B on line pressure 745 psi* 	*changeover working 
well* 	** 	**


-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://snf.stanford.edu/pipermail/diffusion/attachments/20111020/d3d720b5/attachment.html>


More information about the diffusion mailing list