Diffusion Morning Report 10/21/11

Ted Berg tberg at stanford.edu
Fri Oct 21 06:41:26 PDT 2011


Good Morning All,
     Looking good this morning. No new issues today. Burn box clean this 
morning.
     Leftovers: Thermco Poly2 is back together and in standby. will need 
coat and test. J is working with vendor on NH3 for Fiji.

					
	Date: 	10/21/11 	THICKNESS-Change at 		Priority
Tube Name/Number 	Status 				
Tylan 1 	*up* 	** 	** 	** 	**
Tylan 2 	*up* 	** 	** 	** 	**
Tylan 3 	*up* 	** 	** 	** 	**
Tylan 4 	*up* 	** 	** 	** 	**
Tylan 5-BBr3 	*up* 	** 	** 	** 	**
Tylan 6-POCl3 	*up* 	** 	** 	** 	**
Tylan 7-TEOS2 	*up* 	** 	*10.49/30* 	** 	**
Tylan 8-SiGe 	*up* 	** 	*3.76/30* 	** 	**
Tylan 9-Poly 	*up* 	** 	*3.41/30* 	** 	**
Tylan 10-Nitride 	*yellow* 	** 	*.29/30* 	** 	**
Tylan 11-LTO 	*up* 	** 	*8.26/30* 	** 	**
Tylan 12-FGA 	*up* 	** 	** 	** 	**
Thermco 1 	*up* 	** 	** 	** 	**
Thermco 2 	*up* 	** 	** 	** 	**
Thermco 3 	*future* 	** 	** 	** 	**
Thermco4 	*future* 	** 	** 	** 	**
Thermco Poly1 	*up* 	** 	** 	*
* 	**
Thermco Poly2 	*down* 	*re assembled needs coat and test* 	** 	** 	* 1*
Thermco Nitride1 	*up* 	** 	** 	** 	**
Thermco bpsg 	*up* 	** 	** 	** 	**
AMAT Epi 	*down* 	*lla issues* 	** 	** 	**
TEL Spa 	*up* 	** 	** 	** 	**
Burn Box 	*up* 	** 	** 	** 	**
SEM 4160 	*up* 	** 	** 	** 	**
ZYGO 	*up* 	** 	** 	** 	**
FGA2 	*up* 	** 	** 	** 	**
SiH4 for furnaces 	** 	*B on line pressure 745 psi* 	*changeover working 
well* 	** 	**


-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://snf.stanford.edu/pipermail/diffusion/attachments/20111021/086cea6f/attachment.html>


More information about the diffusion mailing list