Diffusion Morning Report 07/31/12

Ted Berg tberg at stanford.edu
Tue Jul 31 06:17:25 PDT 2012


Good Morning All,
*1.  New Issues:* Sem 4160 valve didn't open
*2.  Leftovers: *No TLC on Thermco 3 and 4,  Thermco 1 low wet ox rate, 
Tylan Poly rewriting recipes,**Alarms for silane, germane, Tylan Lps  
down after alarms,  Pull and clean on Tylan LTO
*3.  Resolved*:*Epi lamps* changed, POCl3 and BBr3 released, Exhaust for 
burn box replaced

					
	Date: 	7/31/12 	THICKNESS-Change at 		Priority
Tube Name/Number 	Status 				
Tylan 1 	*up* 	** 	** 	** 	**
Tylan 2 	*up* 	** 	** 	** 	**
Tylan 3 	*up* 	** 	** 	** 	**
Tylan 4 	*up* 	** 	** 	** 	**
Tylan 5-BBr3 	*up* 	** 	** 	** 	**
Tylan 6-POCl3 	*up* 	** 	** 	** 	**
Tylan 7-TEOS2 	*up* 	** 	*14.39/30* 	** 	**
Tylan 8-SiGe 	*down* 	*waiting for users* 	*3.4/30* 	** 	**
Tylan 9-Poly 	*down* 	*rewriting recipes* 	*23.7/30* 	** 	**
Tylan 10-Nitride 	*down* 	*sih4 alarm* 	*28.5/30* 	** 	*2*
Tylan 11-LTO 	*down* 	*replacing tube and quartz* 	*0/30* 	** 	*1*
Tylan 12-FGA 	*up* 	** 	** 	** 	**
Thermco 1 	*yellow* 	*low oxidation rate* 	** 	** 	**
Thermco 2 	*up* 	** 	** 	** 	**
Thermco 3 	*yellow* 	*testing TLC* 	** 	** 	**
Thermco4 	*yellow* 	*no TLC* 	** 	** 	**
Thermco Poly1 	*up* 	** 	** 	*
* 	**
Thermco Poly2 	*up* 	** 	** 	** 	**
Thermco Nitride1 	*up* 	** 	** 	** 	**
Thermco bpsg 	*up* 	** 	** 	** 	**
AMAT Epi Cham. A 	*yellow* 	** 	** 	** 	**
AMAT Epi Cham. B 	*down* 	** 	** 	** 	**
TEL Spa 	*up* 	** 	** 	** 	**
Burn Box 	*up* 	*exhaust duct replaced* 	** 	** 	**
SEM 4160 	*up* 	** 	** 	** 	**
FGA2 	*up* 	** 	** 	** 	**
SiH4 for furnaces 	*on* 	*crossover ok* 	*changeover working well* 	** 	**


-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://snf.stanford.edu/pipermail/diffusion/attachments/20120731/d9a912b1/attachment.html>


More information about the diffusion mailing list