[diffusion] Diffusion Morning Report 03/05/13
Ted Berg
tberg at stanford.edu
Tue Mar 5 06:49:52 PST 2013
Good Morning All,
*1**. New issues**:* Black stuff on Tylan LTO boat
* 2. Ongoing issues:*Tylan Poly rewriting recipes,***Tylan 3
thin,**Tylan 2 poor uniformity*, Thermco 1 thickness issues?
*3. Resolved: Tylan Nitride pump changed, Tylan boat fork sheath replaced
*
Date: 3/5/13 THICKNESS-Change at Priority
Tube Name/Number Status
Tylan 1 up
Tylan 2 *yellow* *needs test* ** **
Tylan 3 *yellow* *thin?* ** **
Tylan 4 *up* ** ** **
Tylan 5-BBr3 *yellow* *temp issue-front zone low* ** **
Tylan 6-POCl3 *up* ** ** **
Tylan 7-TEOS2 *yellow* *needs test* *14.39/30* **
Tylan 8-SiGe *down* *waiting for users* *3.4/30* **
Tylan 9-Poly *down* *rewriting recipes-testing revised recipes*
*23.7/30* **
Tylan 10-Nitride *yellow* *pump replaced -running needs test*
*28.5/30* **
Tylan 11-LTO *yellow* *sheath replaced-black stuff on boats*
*4.3/30* ** 1
Tylan 12-FGA *up* ** ** **
Thermco 1 *yellow* *thin?* ** **
Thermco 2 *up* ** ** **
Thermco 3 *up* ** ** **
Thermco4 *up* ** ** **
Thermco Poly1 *up* ** ** *
*
Thermco Poly2 *up* ** ** **
Thermco Nitride1 *up* ** ** **
Thermco bpsg *up* ** ** **
AMAT Epi Cham. A *up* *pump replaced -running* ** **
AMAT Epi Cham. B *up* *running* ** **
TEL Spa *up* ** ** **
Burn Box *up* ** ** **
SEM 4160 *up* ** ** **
FGA2 *up* ** ** **
SiH4 for furnaces *on* *crossover ok* ***changeover working well*** **
**
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://snf.stanford.edu/pipermail/diffusion/attachments/20130305/fd7d12a4/attachment-0001.html>
More information about the diffusion
mailing list