From booth at snf.stanford.edu Wed Apr 12 10:38:29 2000 From: booth at snf.stanford.edu (Len Booth) Date: Wed, 12 Apr 2000 10:38:29 -0700 Subject: Drytek2 - read the logbook etch rate info! Message-ID: <38F4B495.5F019686@snf.stanford.edu> Drytek2 is available again - BUT - the etch rates for the 6 electrodes are not well matched. A poly etch rate test was done last night by Eric P. to document the current etch rates, and the info is posted in the logbook at the machine. Check the data and choose which electrodes you want to use. When time permits (one or two months???) we will try to do a full balancing of the poly etch rates. We normally expect less than 10% non-uniformity between all electrodes for poly etch. Len From yiching at stanford.edu Tue Apr 25 20:50:44 2000 From: yiching at stanford.edu (Yiching Liang) Date: Tue, 25 Apr 2000 20:50:44 -0700 (PDT) Subject: resist harden for heavy implants Message-ID: Hi- Can someone tell me how long I need to run the resist harden program in drytek2 to prep my wafers for high dose implants (5e15)? Thanks. Yiching