From rcrane at snf.stanford.edu Fri Dec 13 16:41:48 2002 From: rcrane at snf.stanford.edu (Dick Crane) Date: Fri, 13 Dec 2002 16:41:48 -0800 Subject: Shutdown, repair and upgrade Message-ID: <3DFA7E4C.FCF9D016@snf.stanford.edu> Drytek2 users: In an effort to eliminate electrode water leaks, we are replacing the current electrode stack with an enhanced, upgraded version which also has six inch capability. This upgrade will require recharacterizing the drytek as to etch rate, across wafer uniformity and wafer to wafer uniformity. Drytek2 will be shutdown as of Wednesday, December 18. Characterization testing will start Monday, January 6, and the tool should be up for general use by Friday, January 10. Sorry for any scheduling inconvenience, but the upgrade will help increase long term up-time. Thanks, Dick From yyao at snf.stanford.edu Tue Dec 17 09:59:27 2002 From: yyao at snf.stanford.edu (Yahong Yao) Date: Tue, 17 Dec 2002 09:59:27 -0800 Subject: drytek2 1100-1200 & 1530-1630 released Message-ID: <3DFF65FF.CF78A6A3@snf.stanford.edu> done early.