Dr Yihwan Kim and Jerry Bevers from AMAT's Front End Product Group came in and inspected our tool, answered process questions and looked over some of our recipes.  Some hightlights:
-We need to change the bottom dome.  
-We need to change to a susceptor suport that supports in the center.  They will supply part #.
-We need to do a temp cal once everything is buttoned up.
_
-Minimun slit flow during processes: 3 sccm
-During process run, contine to control LPID but watch power reading.  Higher power values may indicate dome coating.
-Our current etch recipes are good.  We may need to adjust times.
-Arsine depositions are a problem.  Ideally, they should be done in a seperate chamber.
_
We expect the system will be down all next week for the down replacement and waiting for parts that Jerry suggested we change.