Epi Status
Ted Berg
tberg at stanford.edu
Mon Dec 17 06:40:19 PST 2012
Hello All,
Just a brief update on Epi Status.
Applied was able to complete the rebuild of the Rotation assembly but was unable to perform leak testing. One item (a Fastener & its Nut Rotation Assembly) from the Dome Clamp was lost in the MF during disassembly/removal of the Rotation and they were unable to locate it Friday. The parts were ordered and they will be on-site Monday Dec. 17. Once the Rotation passes leak testing, assembly of the chamber can be completed.