We have made some progress. We hope to report more progress tomorrow.
Coral update below:
-------- Original Message --------
Subject: Comment epi2 SNF 2010-05-24 15:55:03: update
Date: Mon, 24 May 2010 15:55:04 -0700
From: maurice at snf.stanford.edu
To: epi2-pcs at snf.stanford.edu
Elmer and Sean flushed cooling water loop over the weekend. Flow through the system is much better. We have been able to run 5 etches so far without any water flow problems.
-
But we did have one chamber overpressure on the 3rd etch. This was one of the problems we were addressing before the water issue.
-
Also, we currently can't load wafers from either loadlock. Sean was calibrating the loading when the water shut system down.
-
--
maurice at stanford.edu
Maurice Stevens
Stanford Nanofabrication Facility
CIS Room 142, Mail Code 4070
Stanford, CA 94305
P. (650)725-3660
F. (650)725.6278
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://snf.stanford.edu/pipermail/epi2/attachments/20100524/d35d5529/attachment.html>
More information about the epi2
mailing list