Etch Morning Report Dec 4, 2002
Len Booth
booth at snf.stanford.edu
Wed Dec 4 08:38:41 PST 2002
Etch Group - Morning Equipment Status Report 9:00 am
Astrisk (*) = equipment up & ready for use
AG4108 Problem each user needs to verify Config values
values will change if power-cycled
AMTetcher *
Drytek1 *
Drytek2 *
Drytek4 *
Gasonics Shutdown waiting for process recipe(s) to be
developed, Jim McVittie
Lampoly *
Lamsi NOT installed
Matrix *
MRC *
Pquest Shutdown burnbox sump pump failure
Prometrix *
P5000etch *
RTAag *
RTAgaas NOT installed
STSetch *