From booth at snf.stanford.edu Tue Apr 1 08:23:06 2003 From: booth at snf.stanford.edu (Len Booth) Date: Tue, 01 Apr 2003 08:23:06 -0800 Subject: Etch Morning Report Apr 1, 2003 Message-ID: <3E89BCEA.FD31DCEE@snf.stanford.edu> Etch Group - Morning Equipment Status Report 9:00 am Astrisk (*) = equipment up & ready for use AG4108 * each user needs to verify Config values values can change if power-cycled AMTetcher * Drytek1 * Drytek2 * Drytek4 * Gasonics Shutdown waiting for process recipe(s) to be developed, Jim McVittie Lampoly * Lamsi NOT installed Matrix * MRC * P5000etch Problem Chamber C is SHUTDOWN Pquest * Prometrix * RTAag * RTAgaas NOT installed STSetch * Wafersaw * From booth at snf.stanford.edu Wed Apr 2 08:37:53 2003 From: booth at snf.stanford.edu (Len Booth) Date: Wed, 02 Apr 2003 08:37:53 -0800 Subject: Etch Morning Report Apr 2, 2003 Message-ID: <3E8B11E1.1D943100@snf.stanford.edu> Etch Group - Morning Equipment Status Report 9:00 am Astrisk (*) = equipment up & ready for use AG4108 * each user needs to verify Config values values can change if power-cycled AMTetcher * Drytek1 * Drytek2 * Drytek4 * Gasonics Shutdown waiting for process recipe(s) to be developed, Jim McVittie Lampoly * Lamsi NOT installed Matrix * MRC * P5000etch * Pquest * Prometrix * RTAag * RTAgaas NOT installed STSetch * Wafersaw * From booth at snf.stanford.edu Mon Apr 7 20:50:27 2003 From: booth at snf.stanford.edu (Len Booth) Date: Mon, 07 Apr 2003 20:50:27 -0700 Subject: Etch Morning Report April 7,2003 Message-ID: <3E924703.667EA046@snf.stanford.edu> Etch Group - Morning Equipment Status Report 9:00 am Astrisk (*) = equipment up & ready for use AG4108 * each user needs to verify Config values values can change if power-cycled AMTetcher * Drytek1 * Drytek2 * Drytek4 * Gasonics Shutdown waiting for process recipe(s) to be developed, Jim McVittie Lampoly * Lamsi NOT installed Matrix * MRC * P5000etch * Pquest * Prometrix * RTAag * RTAgaas NOT installed STSetch * Wafersaw * From booth at snf.stanford.edu Tue Apr 8 08:40:32 2003 From: booth at snf.stanford.edu (Len Booth) Date: Tue, 08 Apr 2003 08:40:32 -0700 Subject: Etch Morning Report April 8, 2003 Message-ID: <3E92ED70.6386A959@snf.stanford.edu> Etch Group - Morning Equipment Status Report 9:00 am Astrisk (*) = equipment up & ready for use AG4108 * each user needs to verify Config values values can change if power-cycled AMTetcher * Drytek1 * Drytek2 * Drytek4 * Gasonics Shutdown waiting for process recipe(s) to be developed, Jim McVittie Lampoly * Lamsi NOT installed Matrix * MRC * P5000etch * Pquest * Prometrix * RTAag * RTAgaas NOT installed STSetch * Wafersaw * From booth at snf.stanford.edu Thu Apr 10 09:00:22 2003 From: booth at snf.stanford.edu (Len Booth) Date: Thu, 10 Apr 2003 09:00:22 -0700 Subject: Etch Morning Report April 10,2003 Message-ID: <3E959516.C6B8A07A@snf.stanford.edu> Etch Group - Morning Equipment Status Report 9:00 am Astrisk (*) = equipment up & ready for use AG4108 * each user needs to verify Config values values can change if power-cycled AMTetcher Shutdown tray arcing, and pump maintenance should be available late today Drytek1 * Drytek2 * Drytek4 * Gasonics Shutdown waiting for process recipe(s) to be developed, Jim McVittie Lampoly * Lamsi NOT installed Matrix * MRC * P5000etch * Pquest * Prometrix * RTAag * RTAgaas NOT installed STSetch * Wafersaw * From booth at snf.stanford.edu Fri Apr 11 09:22:11 2003 From: booth at snf.stanford.edu (Len Booth) Date: Fri, 11 Apr 2003 09:22:11 -0700 Subject: Etch Morning Report April 11, 2003 Message-ID: <3E96EBB3.B0CFE82F@snf.stanford.edu> Etch Group - Morning Equipment Status Report 9:00 am Astrisk (*) = equipment up & ready for use AG4108 * each user needs to verify Config values values can change if power-cycled AMTetcher * Drytek1 * Drytek2 * Drytek4 * Gasonics Shutdown waiting for process recipe(s) to be approved, Jim McVittie Lampoly * Lamsi NOT installed Matrix * MRC * P5000etch * Pquest * Prometrix * RTAag * RTAgaas NOT installed STSetch Shutdown broken wafer Wafersaw Shutdown From booth at snf.stanford.edu Mon Apr 14 09:01:04 2003 From: booth at snf.stanford.edu (Len Booth) Date: Mon, 14 Apr 2003 09:01:04 -0700 Subject: Etch Morning Report April 14, 2003 Message-ID: <3E9ADB40.CB9E10B6@snf.stanford.edu> Etch Group - Morning Equipment Status Report 9:00 am Astrisk (*) = equipment up & ready for use AG4108 * each user needs to verify Config values values can change if power-cycled AMTetcher * Drytek1 * Drytek2 * Drytek4 * Gasonics Shutdown waiting for process recipe(s) to be approved, Jim McVittie Lampoly Shutdown wafer transort not working Lamsi NOT installed Matrix * MRC * P5000etch Shutdown for Chambr C pump failure Pquest * Prometrix * RTAag * RTAgaas NOT installed STSetch * Wafersaw * From booth at snf.stanford.edu Tue Apr 15 09:00:29 2003 From: booth at snf.stanford.edu (Len Booth) Date: Tue, 15 Apr 2003 09:00:29 -0700 Subject: Etch Morning Report Aptil 15, 2003 Message-ID: <3E9C2C9D.41EED5A3@snf.stanford.edu> Etch Group - Morning Equipment Status Report 9:00 am Astrisk (*) = equipment up & ready for use AG4108 * each user needs to verify Config values values can change if power-cycled AMTetcher * Drytek1 * Drytek2 * Drytek4 * Gasonics Shutdown waiting for process recipe(s) to be approved, Jim McVittie Lampoly * Lamsi NOT installed Matrix * MRC * P5000etch Shutdown for Chambr C pump failure Pquest * Prometrix * RTAag * RTAgaas NOT installed STSetch * Wafersaw * From booth at snf.stanford.edu Wed Apr 16 08:53:31 2003 From: booth at snf.stanford.edu (Len Booth) Date: Wed, 16 Apr 2003 08:53:31 -0700 Subject: Etch Morning Report April 16, 2003 Message-ID: <3E9D7C7B.F2C9D5C9@snf.stanford.edu> Etch Group - Morning Equipment Status Report 9:00 am Astrisk (*) = equipment up & ready for use AG4108 * each user needs to verify Config values values can change if power-cycled AMTetcher * Drytek1 * Drytek2 * Drytek4 * Gasonics Shutdown waiting for process recipe(s) to be approved, Jim McVittie Lampoly * Lamsi NOT installed Matrix * MRC Problem SF6 flow & chamber pressure varies with STSetch process operation P5000etch Shutdown for Chambr C pump failure Pquest * Prometrix * RTAag * RTAgaas NOT installed STSetch * Wafersaw * From booth at snf.stanford.edu Mon Apr 21 08:55:09 2003 From: booth at snf.stanford.edu (Len Booth) Date: Mon, 21 Apr 2003 08:55:09 -0700 Subject: Etch Morning Report April 21, 2003 Message-ID: <3EA4145D.B1330B80@snf.stanford.edu> Etch Group - Morning Equipment Status Report 9:00 am Astrisk (*) = equipment up & ready for use AG4108 * each user needs to verify Config values values can change if power-cycled AMTetcher Shutdown arcing needs to be repaired Drytek1 * Drytek2 * Drytek4 * Gasonics Shutdown waiting for process recipe(s) to be approved, Jim McVittie Lampoly * Lamsi NOT installed Matrix * MRC Problem SF6 flow unstable & chamber pressure varies with STSetch process operation P5000etch Shutdown for Chambr B wafer lost in Chamber B Pquest Shutdown broken wafer in etch chamber Prometrix * RTAag Problem recipe operating differently than before RTAgaas NOT installed STSetch * Wafersaw * From booth at snf.stanford.edu Tue Apr 22 09:04:30 2003 From: booth at snf.stanford.edu (Len Booth) Date: Tue, 22 Apr 2003 09:04:30 -0700 Subject: Etch Morning Report April 22, 2003 Message-ID: <3EA5680E.B9AF3029@snf.stanford.edu> Etch Group - Morning Equipment Status Report 9:00 am Astrisk (*) = equipment up & ready for use AG4108 * each user needs to verify Config values values can change if power-cycled AMTetcher * Drytek1 * Drytek2 * Drytek4 * Gasonics Shutdown waiting for process recipe(s) to be approved, Jim McVittie Lampoly * Lamsi NOT installed Matrix * MRC Problem SF6 flow sometimes unstable & chamber pressure varies with some STSetch process operation P5000etch * Pquest * Prometrix * RTAag Problem recipe operating differently than before RTAgaas NOT installed STSetch * Wafersaw * From booth at snf.stanford.edu Wed Apr 23 09:08:24 2003 From: booth at snf.stanford.edu (Len Booth) Date: Wed, 23 Apr 2003 09:08:24 -0700 Subject: Etch Morning Report April 23, 2003 Message-ID: <3EA6BA78.109479DB@snf.stanford.edu> Etch Group - Morning Equipment Status Report 9:00 am Astrisk (*) = equipment up & ready for use AG4108 * each user needs to verify Config values values can change if power-cycled AMTetcher * Drytek1 * Drytek2 * Drytek4 * Gasonics Shutdown waiting for process recipe(s) to be approved, Jim McVittie Lampoly * Lamsi NOT installed Matrix Shutdown wafer transport error MRC Problem SF6 flow sometimes unstable & chamber pressure varies with some STSetch process operation P5000etch * Pquest * Prometrix * RTAag Problem recipe operating differently than before RTAgaas NOT installed STSetch * Wafersaw * From booth at snf.stanford.edu Thu Apr 24 08:58:55 2003 From: booth at snf.stanford.edu (Len Booth) Date: Thu, 24 Apr 2003 08:58:55 -0700 Subject: Etch Morning Report April 24, 2003 Message-ID: <3EA809BF.D28A3261@snf.stanford.edu> Etch Group - Morning Equipment Status Report 9:00 am Astrisk (*) = equipment up & ready for use AG4108 * each user needs to verify Config values values can change if power-cycled AMTetcher * Drytek1 * Drytek2 * Drytek4 * Gasonics Shutdown waiting for process recipe(s) to be approved, Jim McVittie Lampoly * Lamsi NOT installed Matrix * MRC Problem SF6 flow sometimes unstable & chamber pressure varies with some STSetch process operation P5000etch * Pquest * Prometrix * RTAag Problem recipe operating differently than before RTAgaas NOT installed STSetch * Wafersaw * From booth at snf.stanford.edu Fri Apr 25 08:59:24 2003 From: booth at snf.stanford.edu (Len Booth) Date: Fri, 25 Apr 2003 08:59:24 -0700 Subject: Etch Morning Report April 25, 2003 Message-ID: <3EA95B5C.5DBCA6C0@snf.stanford.edu> Etch Group - Morning Equipment Status Report 9:00 am Astrisk (*) = equipment up & ready for use AG4108 * each user needs to verify Config values values can change if power-cycled AMTetcher * Drytek1 * Drytek2 * Drytek4 * Gasonics Shutdown waiting for process recipe(s) to be approved, Jim McVittie Lampoly * Lamsi NOT installed Matrix * MRC Problem SF6 flow sometimes unstable & chamber pressure varies with some STSetch process operation P5000etch * Pquest * Prometrix * RTAag Problem recipe operating differently than before RTAgaas NOT installed STSetch * Wafersaw * From booth at snf.stanford.edu Mon Apr 28 08:24:03 2003 From: booth at snf.stanford.edu (Len Booth) Date: Mon, 28 Apr 2003 08:24:03 -0700 Subject: Etch Morning Report April 28,2003 Message-ID: <3EAD4793.7B752130@snf.stanford.edu> Etch Group - Morning Equipment Status Report 9:00 am Astrisk (*) = equipment up & ready for use AG4108 * each user needs to verify Config values values can change if power-cycled AMTetcher * Drytek1 * Drytek2 * Drytek4 * Gasonics Shutdown waiting for process recipe(s) to be approved, Jim McVittie Lampoly * Lamsi NOT installed Matrix * MRC Problem SF6 flow sometimes unstable & chamber pressure varies with some STSetch process operation P5000etch * Pquest * Prometrix * RTAag Problem recipe operating differently than before RTAgaas NOT installed STSetch * Wafersaw * From booth at snf.stanford.edu Tue Apr 29 08:30:47 2003 From: booth at snf.stanford.edu (Len Booth) Date: Tue, 29 Apr 2003 08:30:47 -0700 Subject: Etch Morning Report April 29, 2003 Message-ID: <3EAE9AA7.A8A9E192@snf.stanford.edu> Etch Group - Morning Equipment Status Report 9:00 am Astrisk (*) = equipment up & ready for use AG4108 * each user needs to verify Config values values can change if power-cycled AMTetcher * Drytek1 * Drytek2 * Drytek4 * Gasonics Shutdown waiting for process recipe(s) to be approved, Jim McVittie Lampoly * Lamsi NOT installed Matrix * MRC Problem SF6 flow sometimes unstable & chamber pressure varies with some STSetch process operation P5000etch * Pquest * Prometrix * RTAag Problem recipe operating differently than before RTAgaas NOT installed STSetch * Wafersaw * From booth at snf.stanford.edu Wed Apr 30 09:42:10 2003 From: booth at snf.stanford.edu (Len Booth) Date: Wed, 30 Apr 2003 09:42:10 -0700 Subject: Etch Morning Report April 30, 2003 Message-ID: <3EAFFCE2.40310A2@snf.stanford.edu> Etch Group - Morning Equipment Status Report 9:00 am Astrisk (*) = equipment up & ready for use AG4108 * each user needs to verify Config values values can change if power-cycled AMTetcher * Drytek1 * Drytek2 * Drytek4 * Gasonics Shutdown waiting for process recipe(s) to be approved, Jim McVittie Lampoly * Lamsi NOT installed Matrix * MRC Problem SF6 flow sometimes unstable & chamber pressure varies with some STSetch process operation P5000etch * Pquest * Prometrix * RTAag Problem recipe operating differently than before RTAgaas NOT installed STSetch * Wafersaw *