Etch Morning Report May 7, 2003

Len Booth booth at
Wed May 7 08:55:27 PDT 2003

Etch Group -  Morning Equipment Status Report 9:00 am
  Astrisk (*) = equipment up & ready for use
AG4108     *     each user needs to verify Config values
                 values can change if power-cycled
AMTetcher  *

Drytek1    *
Drytek2    *

Drytek4    *

Gasonics   Shutdown   waiting for process recipe(s) to be
                          approved, Jim McVittie

Lampoly    *

Lamsi      NOT installed
Matrix     *
MRC        Problem   SF6 flow sometimes unstable & chamber pressure 
                     varies with some STSetch process operation

P5000etch  Problem   Ch A backside Helium flow faults
Pquest     *

Prometrix  *    
RTAag      *
RTAgaas    NOT installed        
STSetch    *

Wafersaw   *

More information about the etch mailing list