Etch Morning Report May 14, 2003
Len Booth
booth at snf.stanford.edu
Wed May 14 09:05:50 PDT 2003
Etch Group - Morning Equipment Status Report 9:00 am
Astrisk (*) = equipment up & ready for use
AG4108 * each user needs to verify Config values
values can change if power-cycled
AMTetcher *
Drytek1 *
Drytek2 *
Drytek4 *
Gasonics Shutdown waiting for process recipe(s) to be
approved, Jim McVittie
Lampoly Shutdown crud appeared on test wafers
Lamsi NOT installed
Matrix *
MRC Problem SF6 flow sometimes unstable &
chamber
pressure varies with some STSetch
process operation
P5000etch *
Pquest Problem LoadLock wafer sensor getting flaky
Prometrix *
RTAag *
RTAgaas NOT installed
STSetch *
Wafersaw *