Etch report 20/02/04
Cesar Baxter
cbaxter at snf.stanford.edu
Tue Apr 20 23:25:16 PDT 2004
Etch equipment status
Astrisk (*)= equipment is up and ready for use
AMTetch Turbo pumping speed is weak. Will schedule system shutdowm
and have turbo pump send out for rebuild.
Drytek#1 *
Drytek#2 *
Drytek#4 *
Lampoly *
Lamsi Not installed
Gasonic Waiting for process recipe to be developed (Jim McVittie)
Matrix *
MRC *
PQuest *
P5000 *
STSetch *
STShrm Not installed work in progress
More information about the etch
mailing list