status
Cesar Baxter
cbaxter at snf.stanford.edu
Tue Jan 6 23:21:29 PST 2004
Etch equipment status
Astrisk (*)= equipment is up and ready for use
AMTetche *
Drytek#1 *
Drytek#2 *
Drytek#4 *
Lampoly Tool down for procon water pump. Pump is send out to be
rebuild.
Lamsi Not installed
Gasonic Waiting for process recipe to be developed (Jim McVittie)
Matrix *
MRC *
PQuest *
P5000 Chamber A vacuum pump was send out to be rebuild.
Chamber B,C and D are ready for use.
STSetch *
More information about the etch
mailing list