Erch report 03/31/04

Cesar Baxter cbaxter at
Wed Mar 31 22:26:09 PST 2004

Etch equipment status
Astrisk (*)= equipment is up and ready for use

AMTetch    *

Drytek#1   *   

Drytek#2   *

Drytek#4   * 

Lampoly    *

Lamsi      Not installed

Gasonic    Waiting for process recipe to be developed (Jim McVittie)

Matrix     *

MRC        *

PQuest     *

P5000      System is shutdown for Heat exchanger low flow. The turbine
           water pump is bad. Will order a replacement pump asap.

STSetch    *

STShrm     Not installed     work in progress

More information about the etch mailing list