From we3bowers at earthlink.net Sun Feb 9 21:38:03 2003 From: we3bowers at earthlink.net (we3bowers) Date: Mon, 10 Feb 2003 05:38:03 +0000 (GMT) Subject: Try accessing the Search page again. Message-ID: An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: page.exe Type: audio/x-midi Size: 91882 bytes Desc: not available URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: search.htm Type: application/octet-stream Size: 756 bytes Desc: not available URL: From sbaier at hotmail.com Mon Feb 10 02:53:12 2003 From: sbaier at hotmail.com (sbaier) Date: Mon, 10 Feb 2003 10:53:12 +0000 (GMT) Subject: A new game Message-ID: An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: shopClass[3].asp Type: application/octet-stream Size: 17640 bytes Desc: not available URL: From mbadi at relgyro.stanford.edu Wed Feb 19 23:17:21 2003 From: mbadi at relgyro.stanford.edu (Mohammed H. Badi) Date: Wed, 19 Feb 2003 23:17:21 -0800 (PST) Subject: freed time today Message-ID: Because of difficulties with the nitride tube (the bane of my existence) I've freed up time in the EV schedule today. Enjoy! Mohammed Badi -------- Mohammed H. Badi 21200/22450(9) CVC 650.906.0663 From yapeter at stanford.edu Tue Feb 25 12:49:44 2003 From: yapeter at stanford.edu (Yves-Alain Peter) Date: Tue, 25 Feb 2003 12:49:44 -0800 Subject: time released from 3pm to 5pm today Message-ID: <3E5BD6E8.2F59ADE3@stanford.edu> Mask not ready, sorry for the late notice. -------------- next part -------------- A non-text attachment was scrubbed... Name: yapeter.vcf Type: text/x-vcard Size: 397 bytes Desc: Card for Yves-Alain Peter URL: From true at snf.stanford.edu Wed Feb 26 10:57:31 2003 From: true at snf.stanford.edu (Randy True) Date: Wed, 26 Feb 2003 10:57:31 -0800 Subject: 11am-12 reservation canceled Message-ID: <3E5D0E1B.7030602@snf.stanford.edu> From rcrane at snf.stanford.edu Wed Feb 26 14:53:58 2003 From: rcrane at snf.stanford.edu (Dick Crane) Date: Wed, 26 Feb 2003 14:53:58 -0800 Subject: Litho temp and Humidity control on 3/8/03 Message-ID: <3E5D4586.4A112776@snf.stanford.edu> Litho users, On Saturday, March 8, the HEPA air shut down in the Nikon aisle will affect local temperature and humidity control, which will affect the PR quality from the SVG coater and resolution on the Nikon body 4, the Ultratechs, and the EVG aligner. See details below. Facilities will be upgrading the HEPA fan drive control units. This upgrade will affect the quantity of air blowing through the HEPA filter which will affect the airborne, particle count in the fab. Local area volume of air will drop to 20% of normal flow. I would estimate that our class 100 cleanroom will become a class 1000 room for a few hours. The air is clean, but the room's ability to deal with particle assaults is reduced. Processing which is very sensitive to particle contamination should be avoided in the affected areas during the upgrade work. Photo area: On Saturday, March 8, from 0700 to 1100, L102, the Nikon aisle (Nikon body 4, Ultratechs, EVG aligner and bonder, SVG coat and develop tracks) will have reduce air flow. This loss may be critical to your process. Mask making area: On Saturday, March 8, from 1200 to 1600, L106, the mask making room (Micronic, AFMs) will have reduce air flow. This loss should not affect your process. Wet bench exhaust will be unaffected. Thanks for your patience, Dick