Shutdown fusion SNF 2010-08-18 15:34:14: Maint. Testing

gsosa at snf.stanford.edu gsosa at snf.stanford.edu
Mon May 9 14:12:24 PDT 2011


Re-assembled the system. Turned on water and checked for leaks. Powered up system and initialized- All OK. Cycled wafers through system with standard process "A". All OK, Lamps OK, handling OK.