Comment gasonics SNF 2005-01-03 15:57:29: Work done during shutdown
eenriquez at snf.stanford.edu
eenriquez at snf.stanford.edu
Mon Jan 3 15:57:30 PST 2005
Temporary repair of the output cassette elevator was to cool down a voltage regulator with CDA. The part should be here in about a week. Releveled the cassette elevators and the robot arms.