Shutdown innotec SNF 2008-04-03 00:19:03: aux2 failure

jperez at snf.stanford.edu jperez at snf.stanford.edu
Thu Apr 3 08:04:22 PDT 2008


The Innotec has to be enabled on Coral  from start (when 
venting to load samples) to finished (when pumping down 
after  samples and metals are removed).
There is no history log in and log out for Innotec. That is why
the AUX2 didn't come  on.




More information about the innotec-pcs mailing list