Comment innotec SNF 2010-08-01 11:26:36: crossover problem
tdo at snf.stanford.edu
tdo at snf.stanford.edu
Sun Aug 1 11:26:37 PDT 2010
Roughing pump gets below 150-200mTorr slowly, but doesn't make the 150 micron set point. temporarily changed the setpoint to 250 micron so crossover occurs (with perrmission of jshott).
More information about the innotec-pcs
mailing list