HotJobs submission for 23501, Equipment Engineering Maintenance Supervisor

thomas72wong at yahoo.com thomas72wong at yahoo.com
Wed Feb 7 16:30:08 PST 2007


Thomas Wong applied to the following job:  Job ID: 23501, Equipment Engineering Maintenance Supervisor on HotJobs.com.

****Cover Letter****
Thomas Wong
776 Santa Maria Lane
Foster City, CA 94404
(650) 867-9298



Dear Mr./ Ms.
I am writing to express interest in the position of Equipment Engineer with Stanford University. I believe there is great opportunity with your company for an equipment engineer with my skills and ambition.

I offer Over 9 years of experience in semiconductor manufacturing as Equipment Engineer and Facility Engineer. Solid experience and knowledge in fabrication equipment, such as epitaxy, ion implantation and other manufacturing and test equipments.  Proven ability to establish and improve equipment processes that drive uptime and stability.   Strong problem solving and analytical skills. Well versed in engineering with outstanding planning skills. An excellent team player and work well with diverse personalities. Well organized, hardworking, and persistent. Demonstrated ability to handle heavy workload and get jobs done well.

Thank you for you r consideration of me for the position of Equipment Engineer with Stanford University.  I believe my skills and experience match your requirements.  

Best regards,

Name:		Thomas Wong
Address:	776 santa maria ln.
	 	
	 	Foster City, CA 94404
Job Title: 	Equipment Engineer
Will Relocate?	N 
Experience Level:5
Work Auth:	United States
Primary Phone:	(650) 867-9298
Secondary Phone:
Email: 		thomas72wong at yahoo.com 
Minimum Annual Salary Requirement: Unspecified 

******RESUME******

 
div.hj_sdc{ color: #000000; }
div.hj_sdc p { margin-top: 0pt; margin-bottom: 0pt;}
div.hj_sdc h1 { margin-top: 0pt; margin-bottom: 0pt;}
div.hj_sdc h2 { margin-top: 0pt; margin-bottom: 0pt;}
div.hj_sdc h3 { margin-top: 0pt; margin-bottom: 0pt;}
div.hj_sdc h4 { margin-top: 0pt; margin-bottom: 0pt;}
div.hj_sdc h5 { margin-top: 0pt; margin-bottom: 0pt;}
div.hj_sdc h6 { margin-top: 0pt; margin-bottom: 0pt;}
/* In certain situations, Netscape collapses vertical margins which results in unreadable tables. */
/* Forcing padding into the   tag prevents the collapse. */
div.hj_sdc td p { padding-top: 1pt; padding-bottom: 1pt;}
div.hj_sdc th p { padding-top: 1pt; padding-bottom: 1pt;}
div.hj_sdc .Normal{
 text-align: justify;
 text-indent: 0pt;
 font-family: 'Garamond', 'Arial';
 font-size: 11pt;
 text-decoration: none;
}
div.hj_sdc .Name{
 margin-bottom: 22pt;
 text-align: center;
 text-indent: 0pt;
 line-height: 22pt;
 font-family: 'Garamond', 'Arial';
 font-size: 22pt;
 text-decoration: none;
 text-transform: uppercase;
 letter-spacing: 4pt;
}
div.hj_sdc .Name--Char{
 font-family: 'Garamond', 'Arial';
 font-size: 22pt;
 text-decoration: none;
 text-transform: uppercase;
 letter-spacing: 4pt;
}
div.hj_sdc .Footer{
div.hj_sdc  margin-top: 11pt;
 margin-bottom: 11pt;
 margin-left: 0pt;
 margin-right: 0pt;
 text-align: left;
 text-indent: 0pt;
 line-height: 12pt;
 font-family: 'Garamond', 'Arial';
 font-size: 11pt;
 text-decoration: none;
 text-transform: uppercase;
}
div.hj_sdc .Footer--Char{
 font-family: 'Garamond', 'Arial';
 font-size: 11pt;
 text-decoration: none;
 text-transform: uppercase;
}
div.hj_sdc .Hyperlink{
 text-decoration: underline;
 color: #0000FF;
}
div.hj_sdc .Hyperlink--Char{
 text-decoration: underline;
 color: #0000FF;
}
div.hj_sdc .Section-0020Title{
div.hj_sdc  margin-top: 11pt;
 text-align: left;
 text-indent: 0pt;
 line-height: 11pt;
 font-family: 'Garamond', 'Arial';
 font-size: 11pt;
 font-weight: bold;
 text-decoration: none;
 text-transform: uppercase;
 letter-spacing: 0pt;
}
div.hj_sdc .Objective{
div.hj_sdc  margin-top: 3pt;
 margin-bottom: 11pt;
 text-align: justify;
 text-indent: 0pt;
 line-height: 11pt;
 font-family: 'Garamond', 'Arial';
 font-size: 11pt;
 text-decoration: none;
}
div.hj_sdc .Objective--Char{
 font-family: 'Garamond', 'Arial';
 font-size: 11pt;
 text-decoration: none;
}
div.hj_sdc .Company-0020Name{
div.hj_sdc  margin-top: 11pt;
 margin-left: 17pt;
 text-align: left;
 text-indent: -17pt;
 line-height: 11pt;
 font-family: 'Garamond', 'Arial';
 font-size: 11pt;
 font-weight: bold;
 text-decoration: none;
}
div.hj_sdc .Job-0020Title{
div.hj_sdc  margin-top: 2pt;
 margin-bottom: 2pt;
 text-indent: 0pt;
 line-height: 11pt;
 font-family: 'Garamond', 'Arial';
 font-size: 11pt;
 font-style: italic;
 text-decoration: none;
 letter-spacing: 0pt;
}
div.hj_sdc .Job-0020Title--Char{
 font-family: 'Garamond', 'Arial';
 font-size: 11pt;
 font-style: italic;
 text-decoration: none;
 letter-spacing: 0pt;
}
div.hj_sdc .Body-0020Text{
 margin-bottom: 11pt;
 text-align: justify;
 text-indent: 0pt;
 line-height: 12pt;
 font-family: 'Garamond', 'Arial';
 font-size: 11pt;
 text-decoration: none;
}
div.hj_sdc .Body-0020Text--Char{
 font-family: 'Garamond', 'Arial';
 font-size: 11pt;
 text-decoration: none;
}
div.hj_sdc .Achievement{
 margin-bottom: 3pt;
 margin-left: 18pt;
 text-align: justify;
 text-indent: -18pt;
 line-height: 12pt;
 font-family: 'Garamond', 'Arial';
 font-size: 11pt;
 text-decoration: none;
}
div.hj_sdc .Achievement--Char{
 font-family: 'Garamond', 'Arial';
 font-size: 11pt;
 text-decoration: none;
}
div.hj_sdc .Institution{
div.hj_sdc  margin-top: 3pt;
 text-align: left;
 text-indent: 0pt;
 line-height: 11pt;
 font-family: 'Garamond', 'Arial';
 font-size: 11pt;
 font-weight: bold;
 text-decoration: none;
}
 
 





   Thomas Wong  
 
 776 Santa Maria Lane, 
Foster City, CA 94404 
 Phone (650) 867-9298 
• E-mail:   thomas72wong at yahoo.com   
  
 
 
   Objective   
    
    To obtain a position in Mechanical Engineering.   
   Summary of Qualification   
    
    Over 9 years of experience in semiconductor manufacturing as Equipment 
  Engineer and Facility Engineer. Solid experience and knowledge in fabrication 
  equipment, such as epitaxy, ion implantation and other manufacturing 
  and test equipments.  Proven ability to establish and improve equipment 
  processes that drive uptime and stability.   Strong problem 
  solving and analytical skills. Well versed in engineering with outstanding 
  planning skills. An excellent team player and work well with diverse 
  personalities. Well organized, hardworking, and persistent. Demonstrated 
  ability to handle heavy workload and get jobs done well.   
   Work experience   
    
    Analog Devices, 
  Inc., Sunnyvale, CA 1997-2006 
    Senior Equipment Engineer                                                          
   
      In charge of production equipment in Epi and Ion Implant area.  
      Responsible for equipment performance, improvement, 
    upgrades, parts inventory, reliability and uptime, which are all critical 
    for the success of the company’s manufacturing.  
      Designed and developed improvement tools that resulted in reduced 
    equipment down time.   
      Developed troubleshooting guide with Process Engineer 
    and Maintenance to improve equipment up time.   
      Worked closely with MIS to develop automated process that increased 
    productivity and decreased user errors.  
      TQM (Total Quality Management) team member – Projects: 
    Fab shutdown, Start up Plan, Epi Centura Team, and Year 2000 Team.  
      Emergency 
    Response Team member (ERT) since 1997 – Response to emergency incidences 
    that cause injuries or damage to property and environment.   
   
    Equipment  Engineer I and II  
   
      Standardized preventive maintenance (PM) procedure, which resulted 
    in equipment performance improvement.  
      Responsible for AUTO CAD, Fabrication layout projects 
    and successfully completed the concept design expansion, which resulted 
    in increased Fabrication area.   
      Project manager for the facilities installation and 
    equipment release of process tools: Applied Materials Ion Implanter, 
    Epi Centura and Advanced Semiconductor Materials (ASM) E2.  
      Participated 
    in Year 2000 Team – Responsible to ensure uninterrupted equipment availably 
    for Epi and Implant area.   
   
    Facilities Engineer I  
   
      Managed contractor teams on the installation of process 
    equipment.  
      Coordinated and supervised the installation of semiconductor 
    equipment in fab, such as: Novellus PECVD, Lam 590, Lam 4520, Fusion 
    DUV, DNS 60A Coater & Developer, Gasonics Resist Asher, Laser Scribe, 
    BOE sink, Aqua Regia Storage Cabinet modification and other Facilities 
    work.  
      Provided assistance for ISO 14000 certification and 
    participated in water consumption team.  
   
   University of Pacific, Stockton, CA  1996–1997 
    Mechanical Engineering Department Research 
  Assistant  
   
      Designed a six-legged walking robot to walk on non-planarized 
    surface  
      Participated in the study of Fuzzy Logic Control 
    system to solve this new design challenge  
      Constructed and built the six-legged robot.  
      Performed position and force analysis using MATLAB 
    software.  
   
   E & A Automotive Repair Shop, San Mateo, 
  CA 1994-1995 
    Technician  
   
      Alarm installation and general automotive repair.  
   
   Testing Office, College of San Mateo, San 
  Mateo, CA 1993-1994 
    Proctor  
   
      Design sample tests and performed general clerical work.  
   
    
   Education   
    
    University of Pacific 
  Stockton, CA  May 1997  
   
      BS, Mechanical Engineering.  
   
    
   Training   
    
    
      Trained on: Applied Materials (AMAT) Epi 5200, ASM 
    E2, AMAT Implant 9500, RECIF, AG Heatpulse 8108 semiconductor equipment, 
    2000 – 2006.  
      Certified as an internal Emergency Response Team 
    (ERT), 1998.   
      Certified as an ISO 9000 Internal Quality Auditor, 
    1999.  
      Certified for Total Quality Management (TQM), 2000.  
   
    
   Computer skills   
    
    
      Adobe Photo Shop  
      C++  
      Macintosh   
   
   
      Adobe 
    Premiere  
      MS-Excel  
      MATLAB  
   
   
      Adobe 
    Frame Maker  
      MS-Project  
       PROMIS   
   
   
       Auto CAD   
      MS-Power Point  
       Task Management 
    System   
   
   
       Building Management System   
      MS-Word  
      Visio  
   
    
   Awards received   
    
    “ Fab 
  Shutdown/Startup Plan ”, TQM, Participation Award, November 2005 
    “  Epi Centura Team”,  TQM, Special Achievement Award, Analog Devices, 
  Inc., Feb 2004. 
   “ Epi Centura 
  Team ”, AQP, Team Excellence Award Finalist, May 2004. 
    “  Year 2000 Team”,  TQM, Gold Award, Analog Devices, Inc., Sep 
  1999 
   “ ADSV Cylinder Storage Upgrade Team ”, TQM,, Gold Award,  
  Analog Devices, Inc., Sep 1999 
       “A Robot that Learns 
  to Walk”,  Old Grad Oral Competition, second place, American Society 
  of Mechanical Engineers, 1997. 
    “  Harmonic Excitation due to Unbalance Mass”,  Old Guard Presentation 
  Competition, third place, ASME, 1996.   
   languages   
   English, Chinese (Cantonese, some Mandarin)   
 
 





    



  Page  of 
2  


 


*** If your email client does not support HTML, this resume may not be displayed correctly.
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://snf.stanford.edu/pipermail/jobs/attachments/20070208/9018042f/attachment.html>


More information about the jobs mailing list