From mahnaz at stanford.edu Fri Dec 18 10:56:30 2009 From: mahnaz at stanford.edu (Mahnaz Mansourpour) Date: Fri, 18 Dec 2009 10:56:30 -0800 Subject: PM Message-ID: <4B2BD05E.6050700@stanford.edu> Hi all, The annual pm has been performed by FSE. I just ran wafers on the system and looks very good. I used 1 um of 3612, exposure ( 1.3 seconds, lamp intensity 10.8 mw/cm2 lamp is 5 weeks old) I resolved 1 um and 1.5 um on all 5 points. tested the system for top side and bottom side both, it all looks good. There was an issue with right side focus and do not see it after pm. We will change the lamp for new year. mahnaz