Comment karlsuss2 SNF 2010-04-15 08:37:04: Scheduled lamp change 4/15
gsosa at snf.stanford.edu
gsosa at snf.stanford.edu
Thu Apr 15 08:37:05 PDT 2010
Replaced lamp and adjusted lamp poisition for maximum intensity. Calibrated lamp P/S for 15.0 Mw/cm2. Uniformity @ 1.3%