LRS-18 update
Paul Jerabek
jerabek at snf.stanford.edu
Wed Apr 16 12:02:50 PDT 2003
Micronic field service found one of a guide rails on the system stage
unglued.This is not field repairable item since position of the rail is
extremaly precise.They have removed the stage and a granite base the stage
rides on and send it to Micronic-Sweden for factory repair.It will take
approximately 2 weeks to repair and reinstall.
People who have mask jobs in pipeline might consider sending their jobs to
an outside vendor such as:
-Compugraphics USA
141A Albright Way
Los Gatos, CA 95032
(408) 341-1606 tel.
(408) 866-2248 fax
-Image Technology,Inc.
821 San Antonio Rd.
Palo Alto,CA 94303
(650)494-3113 tel.
(650)494-2971 fax
www.image-tec.com
Their pricing per mask is comparable.People who used Image Tech. tell me
that their delivery time is shorter.
-Paul
More information about the labmembers
mailing list