ASM-L 3-D Align Install Rescheduled

Gary J Sosa gsosa at
Thu Apr 3 15:47:46 PDT 2008

Hi All

   The 3-D align installation originally scheduled for the week of 4/7  
through 4/11 and 4/14 through 4/18 has been rescheduled. The new  
schedule is 4/14 through 4/18 and 4/21 through 4/25. Schedules have  
been posted outside the lab and at the stepper. The stepper is up and  
available for 4" wafer processing through next week.

     Thanks.. Gary

More information about the labmembers mailing list