Analytical Room(Outside of Litho area) Scheduled Shutdown 3/7
Gary J Sosa
gsosa at stanford.edu
Tue Mar 6 14:24:55 PST 2012
Hello Lab-members...
This Email is to notify you that the Analytical Room(Jerabic Room), just outside of the Litho Area will be shut down tomorrow(3/7). The area will be shutdown so that the contractors from AGC can re-hang the HEPA filters located in the ceiling. The work is scheduled to begin at 6:30 am and is expected to take 4 to 6 hours to compete the repairs. During this time, the room will be off limits to all lab-members for safety reasons. Please schedule your time accordingly and make alternate plans during this shutdown. The following tools will be unavailable during this time: Tencor Alphastep, Nanospec2, Tencor P2, Tencor Stresstest, Rudolph Ellipsometer and Tencor Particle Counter. A follow-up Email will be sent out when the construction work is completed. We apologize for the inconvenience.
Thanks.... Your SNF Staff
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://snf.stanford.edu/pipermail/labmembers/attachments/20120306/948e6084/attachment.html>
More information about the labmembers
mailing list