Shutdown lampoly SNF 2004-11-02 12:38:50: Gap drive & turbo error
cbaxter at snf.stanford.edu
cbaxter at snf.stanford.edu
Tue Nov 2 21:39:27 PST 2004
adjusted 5vdc from 5.12vdc to 4.99vdc. also, adjusted 24vdc
to 23.99vdc. cycled wafer continuously all night without a
problem.
More information about the lampoly-pcs
mailing list