Problem lampoly SNF 2005-02-18 16:25:09: HBr not available
rcrane at snf.stanford.edu
rcrane at snf.stanford.edu
Fri Feb 18 16:25:15 PST 2005
HBr is not available for this tool. The gas purge panel has developed a gas leak and will need to be rebuilt. Earliest uptime may be 2/23/05 afternoon.
Sorry for the unscheduled down time,
Dick
More information about the lampoly-pcs
mailing list