Shutdown lampoly SNF 2007-10-17 16:03:25: Loadlock pumpdown error
mtang at snf.stanford.edu
mtang at snf.stanford.edu
Wed Oct 17 17:20:52 PDT 2007
Elmer reset the loadlock pump. Ran 10 wafers. No additional errors. Did not run an etch rate -- would recommend doing so before committing wafers.
The lower electrode RF does not always control well at 40 W, but does quite consistently at 45 W for the breakthrough step. This should not have a significant effect on etch characteristics if you wish to change.