Shutdown lampoly SNF 2007-10-17 20:14:36: 40 entrance load lock pump down fail
chingmei at snf.stanford.edu
chingmei at snf.stanford.edu
Wed Oct 17 20:14:37 PDT 2007
The process can't be run. Two substrates are stuck inside of
the chamber