From elmere at stanford.edu Mon Jul 3 14:41:22 2006 From: elmere at stanford.edu (Elmer Enriquez) Date: Mon, 03 Jul 2006 14:41:22 -0700 Subject: Lampoly update 7/3 Message-ID: <44A98F02.8030203@stanford.edu> - Powered up the system . The software booted up with no problem. Powered down the system again to work on the water leak. - Found a crack on one of the poly lines (water) going to the chuck. Need to remove the chuck in order to replace the line. From eenriquez at snf.stanford.edu Thu Jul 13 10:36:03 2006 From: eenriquez at snf.stanford.edu (Elmer Enriquez) Date: Thu, 13 Jul 2006 10:36:03 -0700 Subject: Lampoly Update 7/13 Message-ID: <44B68483.9040602@snf.stanford.edu> The system should be ready by Monday 7/17. We are just waiting for a set of turbo pump controller cables which are scheduled to arrive tomorrow. The water leak has been repaired and tested. The system has been powered up and the software successfully rebooted.