From gsosa at stanford.edu Wed Dec 1 07:22:26 2010 From: gsosa at stanford.edu (Gary Sosa) Date: Wed, 01 Dec 2010 07:22:26 -0800 Subject: Litho morning status report 12/1 Message-ID: <4CF66832.7080605@stanford.edu> Good morning All.... Here is the Litho morning status report. SVG Coat1- User reports that 220-7 resist is not dispensing. Will check out on morning rounds SVG Coat2- User reports that wafers coming out with streaks. Will test out on morning rounds Please check back in Coral for latest tool updates and current equipment status. Thanks... The Litho Team */Photolithography Area Status/* */Wednesday, December 01, 2010/* */General Information / Lab Activities/* */Exposure Tools/**//* Status Comments Priority ASML Stepper *UP* EVAlign *UP* EVAlign2 *UP* EVG-Imprint *UP* Karl Suss 1 *UP* Karl Suss 2 *UP* */Manual Coaters/* Status EVGSpraycoat *UP* Headway *UP* Laurel *UP* */Coaters/* Process Status SVGCoat 3612 Process *Up* 3617 Process *Up* 220-7 Process *Down* Pump not dispensing 1 SVGCoat2 3612 Process *Problem* Leaving streaks 2 955-0.7 Process *Up* 220-3 Process *Up* */Developers/* Status SVGDEV *UP* SVGDEV2 *UP* */Ovens / Hotplates/* Status BLUEM *UP* Blue M 90 C. *UP* Blue M 110 C *PROBLEM* Temperature Drift. Controller on order 4 Blue M 150 C *PROBLEM* Temperature Drift. Controller on order 5 Fusion *DOWN* Hotplate experiments UV-Cure *UP* White-Oven *UP* YES Vapor Prime *UP* */Hotplates- /* Laurel-left *UP* Laurel- right *UP* Headway *UP* Torrey Pines- left *UP* 90 Deg C *UP* 115 Deg C *UP* Torrey Pines- Right *UP* */Metrology/Inspection/* Status Alpha-Step 500 *UP* Nanospec 2-Litho *UP* Nanospec 1-Etch *UP* P2 Profiler *UP* */Microscpoes-/* #1 Leica/Analytical *UP* #2 Ergolux/Drytek2 *UP* #3 Olympus/Litho *UP* Monitor replaced- OK now #4 Nikon Optiphot/Litho *UP* #5 Nikon/Litho *UP* #6 Leitz/Bosch *UP* #7 Leitz/Diffusion *UP* #8 Olympus/Litho *UP* #9 Olympus/Litho *UP* */Miscellaneous/* Status EVBond *PROBLEM* Bond chuck out for rebuild 3 KSBonder *UP* KSCoat *UP* Litho SRD *UP* -------------- next part -------------- An HTML attachment was scrubbed... URL: From vilanova at stanford.edu Thu Dec 2 07:31:51 2010 From: vilanova at stanford.edu (Mario Vilanova) Date: Thu, 02 Dec 2010 07:31:51 -0800 Subject: Litho Daily Morning Report 12-02-2010 Message-ID: <4CF7BBE7.40700@stanford.edu> -------------- next part -------------- A non-text attachment was scrubbed... Name: Photolithography Area Status.doc Type: application/msword Size: 97792 bytes Desc: not available URL: From vilanova at stanford.edu Fri Dec 3 08:52:33 2010 From: vilanova at stanford.edu (Mario Vilanova) Date: Fri, 03 Dec 2010 08:52:33 -0800 Subject: Litho Daily Morning Report 12/03/2010 Message-ID: <4CF92051.60303@stanford.edu> -------------- next part -------------- A non-text attachment was scrubbed... Name: Photolithography Area Status.doc Type: application/msword Size: 97792 bytes Desc: not available URL: From gsosa at stanford.edu Mon Dec 6 07:36:14 2010 From: gsosa at stanford.edu (Gary Sosa) Date: Mon, 06 Dec 2010 07:36:14 -0800 Subject: Litho Morning status report 12/6 Message-ID: <4CFD02EE.6090006@stanford.edu> Good morning All.... Here is the morning Litho status report. Karl Suss Aligner 1- User reports that mask holder not locking in place. Will check out on morning rounds. Please check back in Coral for latest tool updates and current equipment status. Thanks.... The Litho Team */Photolithography Area Status/* */Monday, December 06, 2010/* */General Information / Lab Activities/* Mahnaz- Out today */Exposure Tools/* Status Comments Priority ASML Stepper *UP* EVAlign *UP* EVAlign2 *UP* EVG-Imprint *UP* Karl Suss 1 *PROBLEM* Mask holder problem 1 Karl Suss 2 *UP* */Manual Coaters/* Status EVGSpraycoat *UP* Headway *UP* Laurel *UP* */Coaters/* Process Status SVGCoat 3612 Process *Up* 3617 Process *Up* 220-7 Process *Problem* Optimizing process 2 SVGCoat2 3612 Process *Up* 955-0.7 Process *Up* 220-3 Process *Up* */Developers/* Status SVGDEV *UP* SVGDEV2 *UP* */Ovens / Hotplates/* Status BLUEM *UP* Blue M 90 C. *UP* Blue M 110 C *PROBLEM* Temperature Drift. Controller on order 4 Blue M 150 C *PROBLEM* Temperature Drift. Controller on order 5 Fusion *DOWN* Hotplate experiments UV-Cure *UP* White-Oven *UP* YES Vapor Prime *UP* */Hotplates- /* Laurel-left *UP* Laurel- right *UP* Headway *UP* Torrey Pines- left *UP* 90 Deg C *UP* 115 Deg C *UP* Torrey Pines- Right *UP* */Metrology/Inspection/* Status Alpha-Step 500 *UP* Nanospec 2-Litho *UP* Nanospec 1-Etch *UP* P2 Profiler *UP* */Microscpoes-/* #1 Leica/Analytical *UP* #2 Ergolux/Drytek2 *UP* #3 Olympus/Litho *UP* #4 Nikon Optiphot/Litho *UP* #5 Nikon/Litho *UP* #6 Leitz/Bosch *UP* #7 Leitz/Diffusion *UP* #8 Olympus/Litho *UP* #9 Olympus/Litho *UP* */Miscellaneous/* Status EVBond *PROBLEM* Bond chuck out for rebuild 3 KSBonder *UP* KSCoat *UP* Litho SRD *UP* -------------- next part -------------- An HTML attachment was scrubbed... URL: From gsosa at stanford.edu Tue Dec 7 07:17:07 2010 From: gsosa at stanford.edu (Gary Sosa) Date: Tue, 07 Dec 2010 07:17:07 -0800 Subject: Litho morning status report 12/7 Message-ID: <4CFE4FF3.6030704@stanford.edu> Good morning All..... Here is the morning Litho status report. KS Bonder- User reported a broken N2 line. Will check and repair. Please check back in Coral for latest tool updates and current equipment status. Thanks.... The Litho Team */Photolithography Area Status/* */Tuesday, December 07, 2010/* */General Information / Lab Activities/* */Exposure Tools/**//* Status Comments Priority ASML Stepper *UP* EVAlign *UP* EVAlign2 *UP* EVG-Imprint *UP* Karl Suss 1 *UP* Karl Suss 2 *UP* */Manual Coaters/* Status EVGSpraycoat *UP* Headway *UP* Laurel *UP* */Coaters/* Process Status SVGCoat 3612 Process *Up* 3617 Process *Up* 220-7 Process *Problem* Optimizing process 2 SVGCoat2 3612 Process *Up* 955-0.7 Process *Up* 220-3 Process *Up* */Developers/* Status SVGDEV *UP* SVGDEV2 *UP* */Ovens / Hotplates/* Status BLUEM *UP* Blue M 90 C. *UP* Blue M 110 C *PROBLEM* Temperature Drift. Controller on order 5 Blue M 150 C *PROBLEM* Temperature Drift. Controller on order 6 Fusion *DOWN* Hotplate experiments UV-Cure *UP* White-Oven *UP* YES Vapor Prime *UP* */Hotplates- /* Laurel-left *UP* Laurel- right *UP* Headway *UP* Torrey Pines- left *UP* 90 Deg C *UP* 115 Deg C *UP* Torrey Pines- Right *UP* */Metrology/Inspection/* Status Alpha-Step 500 *UP* Nanospec 2-Litho *UP* Nanospec 1-Etch *UP* P2 Profiler *PROBLEM* - 11 stage movement error 4 */Microscpoes-/* #1 Leica/Analytical *UP* #2 Ergolux/Drytek2 *UP* #3 Olympus/Litho *UP* #4 Nikon Optiphot/Litho *UP* #5 Nikon/Litho *UP* #6 Leitz/Bosch *UP* #7 Leitz/Diffusion *UP* #8 Olympus/Litho *UP* #9 Olympus/Litho *UP* */Miscellaneous/* Status EVBond *PROBLEM* Bond chuck out for rebuild 3 KSBonder *PROBLEM* Leaking nitrogen hose 1 KSCoat *UP* Litho SRD *UP* -------------- next part -------------- An HTML attachment was scrubbed... URL: From vilanova at stanford.edu Wed Dec 8 08:51:52 2010 From: vilanova at stanford.edu (Mario Vilanova) Date: Wed, 08 Dec 2010 08:51:52 -0800 Subject: Litho Daily Status Report 12/08/2010 Message-ID: <4CFFB7A8.8030800@stanford.edu> Good morning : Here is the morning Litho status report. Please check back in Coral for latest tool updates and current equipment status. Thanks.... The Litho Team */Photolithography Area Status/* */Wednesday , December 08, 2010/* */General Information / Lab Activities/* Gary - Out today */Exposure Tools/* Status Comments Priority ASML Stepper *UP* EVAlign *UP* EVAlign2 *UP* EVG-Imprint *UP* Karl Suss 1 * UP* Karl Suss 2 *UP* */Manual Coaters/* Status EVGSpraycoat *UP* Headway *UP* Laurel *UP* */Coaters/* Process Status SVGCoat 3612 Process *Up* 3617 Process *Up* 220-7 Process *Problem* Optimizing process 1 SVGCoat2 3612 Process *Up* 955-0.7 Process *Up* 220-3 Process *Up* */Developers/* Status SVGDEV *UP* SVGDEV2 *UP* */Ovens / Hotplates/* Status BLUEM *UP* Blue M 90 C. *UP* Blue M 110 C *PROBLEM* Temperature Drift. Controller on order 4 Blue M 150 C *PROBLEM* Temperature Drift. Controller on order 5 Fusion *DOWN* Hotplate experiments UV-Cure *UP* White-Oven *UP* YES Vapor Prime *UP* */Hotplates- /* Laurel-left *UP* Laurel- right *UP* Headway *UP* Torrey Pines- left *UP* 90 Deg C *UP* 115 Deg C *UP* Torrey Pines- Right *UP* */Metrology/Inspection/* Status Alpha-Step 500 *UP* Nanospec 2-Litho *UP* Nanospec 1-Etch *UP* P2 Profiler *UP* */Microscpoes-/* #1 Leica/Analytical *UP* #2 Ergolux/Drytek2 *UP* #3 Olympus/Litho *UP* #4 Nikon Optiphot/Litho *UP* #5 Nikon/Litho *UP* #6 Leitz/Bosch *UP* #7 Leitz/Diffusion *UP* #8 Olympus/Litho *UP* #9 Olympus/Litho *UP* */Miscellaneous/* Status EVBond *PROBLEM* Bond chuck out for rebuild 3 KSBonder *UP* KSCoat *UP* Litho SRD *UP* -------------- next part -------------- An HTML attachment was scrubbed... URL: From vilanova at stanford.edu Thu Dec 9 08:51:59 2010 From: vilanova at stanford.edu (Mario Vilanova) Date: Thu, 09 Dec 2010 08:51:59 -0800 Subject: Litho Daily Report 12/09/2010 Message-ID: <4D01092F.2000706@stanford.edu> Good morning : Here is the morning Litho status report. Please check back in Coral for latest tool updates and current equipment status. Thanks.... The Litho Team */Photolithography Area Status/* */Thursday , December 09, 2010/* */General Information / Lab Activities/* Gary - Out Sick today */Exposure Tools/* Status Comments Priority ASML Stepper *UP* EVAlign *UP* EVAlign2 *UP* EVG-Imprint *UP* Karl Suss 1 * UP* Karl Suss 2 *UP* */Manual Coaters/* Status EVGSpraycoat *UP* Headway *UP* Laurel *UP* CLeaned */Coaters/* Process Status SVGCoat 3612 Process *Up* 3617 Process *Up* 220-7 Process *Problem* Optimizing process 1 SVGCoat2 3612 Process *Up* 955-0.7 Process *Up* 220-3 Process *Up* */Developers/* Status SVGDEV *UP* SVGDEV2 *UP* */Ovens / Hotplates/* Status BLUEM *UP* Blue M 90 C. *UP* Blue M 110 C *PROBLEM* Temperature Drift. Controller on order 4 Blue M 150 C *PROBLEM* Temperature Drift. Controller on order 5 Fusion *DOWN* Hotplate experiments UV-Cure *UP* White-Oven *UP* YES Vapor Prime *UP* */Hotplates- /* Laurel-left *UP* Cleaned Excess of resist on Plate Laurel- right *UP* Cleaned Excess Of resist On Plate Headway *UP* Torrey Pines- left *UP* 90 Deg C *UP* 115 Deg C *UP* Torrey Pines- Right *UP* */Metrology/Inspection/* Status Alpha-Step 500 *UP* Nanospec 2-Litho *UP* Nanospec 1-Etch *UP* P2 Profiler *UP* */Microscpoes-/* #1 Leica/Analytical *UP* #2 Ergolux/Drytek2 *UP* #3 Olympus/Litho *UP* #4 Nikon Optiphot/Litho *UP* #5 Nikon/Litho *UP* #6 Leitz/Bosch *UP* #7 Leitz/Diffusion *UP* #8 Olympus/Litho *UP* #9 Olympus/Litho *UP* */Miscellaneous/* Status EVBond *PROBLEM* Bond chuck out for rebuild 3 KSBonder *UP* KSCoat *UP* Litho SRD *UP* -------------- next part -------------- An HTML attachment was scrubbed... URL: From gsosa at stanford.edu Fri Dec 10 07:55:00 2010 From: gsosa at stanford.edu (Gary Sosa) Date: Fri, 10 Dec 2010 07:55:00 -0800 Subject: Litho morning status report 12/10 Message-ID: <4D024D54.2090800@stanford.edu> Good morning All... Here is the morning Litho status report. Tencor P2- User reports a measurement error when changing the range value. Will check out. Please check back in Coral for latest tool updates and current equipment status. Thanks.... The Litho Team */Photolithography Area Status/* */Friday, December 10, 2010/* */General Information / Lab Activities/* */Exposure Tools/* Status Comments Priority ASML Stepper *UP* EVAlign *UP* EVAlign2 *UP* EVG-Imprint *UP* Karl Suss 1 *UP* Karl Suss 2 *UP* */Manual Coaters/* Status EVGSpraycoat *UP* Headway *UP* Laurel *UP* */Coaters/* Process Status SVGCoat 3612 Process *Up* 3617 Process *Up* 220-7 Process *Problem* Optimizing process 3 SVGCoat2 3612 Process *Up* 955-0.7 Process *Up* 220-3 Process *Up* */Developers/* Status SVGDEV *UP* SVGDEV2 *UP* */Ovens / Hotplates/* Status BLUEM *UP* Blue M 90 C. *UP* Blue M 110 C *PROBLEM* Temperature Drift. Controller on order 6 Blue M 150 C *PROBLEM* Temperature Drift. Controller on order 7 Fusion *DOWN* Hotplate experiments UV-Cure *UP* White-Oven *UP* YES Vapor Prime *UP* */Hotplates- /* Laurel-left *UP* Laurel- right *UP* Headway *UP* Torrey Pines- left *UP* 90 Deg C *UP* 115 Deg C *UP* Torrey Pines- Right *UP* */Metrology/Inspection/* Status Alpha-Step 500 *UP* Nanospec 2-Litho *UP* Nanospec 1-Etch *UP* P2 Profiler *PROBLEM* Height measurement error 2 */Microscpoes-/* #1 Leica/Analytical *UP* #2 Ergolux/Drytek2 *UP* #3 Olympus/Litho *UP* #4 Nikon Optiphot/Litho *UP* #5 Nikon/Litho *UP* #6 Leitz/Bosch *UP* #7 Leitz/Diffusion *UP* #8 Olympus/Litho *UP* #9 Olympus/Litho *UP* */Miscellaneous/* Status EVBond *PROBLEM* Bond chuck out for rebuild 4 KSBonder *PROBLEM* Leaking nitrogen hose 1 KSCoat *UP* Litho SRD *UP* -------------- next part -------------- An HTML attachment was scrubbed... URL: From gsosa at stanford.edu Mon Dec 13 07:04:17 2010 From: gsosa at stanford.edu (Gary Sosa) Date: Mon, 13 Dec 2010 07:04:17 -0800 Subject: Monday morning Litho status report 12/13 Message-ID: <4D0635F1.8000901@stanford.edu> Good morning All.... Here is the morning Litho status report. SVG Coat #2- User reports wafer not transferring. Will check out on morning rounds. EVG Bonder- User reports left flag did not pull. Will investigate. ASML Stepper- 8" Customer demo begins today at 7:00AM. Tool not available for 4" wafer processing Please check back in Coral for latest tool updates and current equipment status. Thanks... The Litho Team */Photolithography Area Status/* */Monday, December 13, 2010/* */General Information / Lab Activities/* */Exposure Tools/**//* Status Comments Priority ASML Stepper *UP* 8" Demo starts today EVAlign *UP* EVAlign2 *UP* EVG-Imprint *UP* Karl Suss 1 *UP* Karl Suss 2 *UP* */Manual Coaters/* Status EVGSpraycoat *UP* Headway *UP* Laurel *UP* */Coaters/* Process Status SVGCoat 3612 Process *Up* 3617 Process *Up* 220-7 Process *Problem* Optimizing process 3 SVGCoat2 3612 Process *Problem* Wafers won't transfer 1 955-0.7 Process *Up* 220-3 Process *Up* */Developers/* Status SVGDEV *UP* SVGDEV2 *UP* */Ovens / Hotplates/* Status BLUEM *UP* Blue M 90 C. *UP* Blue M 110 C *PROBLEM* Temperature Drift. Controller on order 6 Blue M 150 C *PROBLEM* Temperature Drift. Controller on order 7 Fusion *DOWN* Hotplate experiments UV-Cure *UP* White-Oven *UP* YES Vapor Prime *UP* */Hotplates- /* Laurel-left *UP* Laurel- right *UP* Headway *UP* Torrey Pines- left *UP* 90 Deg C *UP* 115 Deg C *UP* Torrey Pines- Right *UP* */Metrology/Inspection/* Status Alpha-Step 500 *UP* Nanospec 2-Litho *UP* Nanospec 1-Etch *UP* P2 Profiler *PROBLEM* Height measurement error 4 */Microscpoes-/* #1 Leica/Analytical *UP* #2 Ergolux/Drytek2 *UP* #3 Olympus/Litho *UP* #4 Nikon Optiphot/Litho *UP* #5 Nikon/Litho *UP* #6 Leitz/Bosch *UP* #7 Leitz/Diffusion *UP* #8 Olympus/Litho *UP* #9 Olympus/Litho *UP* */Miscellaneous/* Status EVBond *PROBLEM* Left flag did not pull 2 KSBonder *PROBLEM* Leaking nitrogen hose 5 KSCoat *UP* Litho SRD *UP* -------------- next part -------------- An HTML attachment was scrubbed... URL: From gsosa at stanford.edu Tue Dec 14 07:20:23 2010 From: gsosa at stanford.edu (Gary Sosa) Date: Tue, 14 Dec 2010 07:20:23 -0800 Subject: Morning Litho status report 12/14 Message-ID: <4D078B37.7080504@stanford.edu> Good morning All.... Here is the morning Litho status report. ASML Stepper- Down. 8" custormer demo in progress. No 4" wafer processing at this time. Please check back in Coral for latest tool updates and equipment status. Thanks..... The Litho Team */Photolithography Area Status/* */Tuesday, December 14, 2010/* */General Information / Lab Activities/* */Exposure Tools/* Status Comments Priority ASML Stepper *DOWN* 8" Demo in progress EVAlign *UP* EVAlign2 *UP* EVG-Imprint *UP* Karl Suss 1 *UP* Karl Suss 2 *UP* */Manual Coaters/* Status EVGSpraycoat *UP* Headway *UP* Laurel *UP* */Coaters/* Process Status SVGCoat 3612 Process *Up* 3617 Process *Up* 220-7 Process *Problem* Optimizing process 1 SVGCoat2 3612 Process *Problem* Intermittant transfer problem 2 955-0.7 Process *Up* 220-3 Process *Up* */Developers/* Status SVGDEV *UP* SVGDEV2 *UP* */Ovens / Hotplates/* Status BLUEM *UP* Blue M 90 C. *UP* Blue M 110 C *PROBLEM* Temperature Drift. Controller on order 6 Blue M 150 C *PROBLEM* Temperature Drift. Controller on order 7 Fusion *DOWN* Hotplate experiments UV-Cure *UP* White-Oven *UP* YES Vapor Prime *UP* */Hotplates- /* Laurel-left *UP* Laurel- right *UP* Headway *UP* Torrey Pines- left *UP* 90 Deg C *UP* 115 Deg C *UP* Torrey Pines- Right *UP* */Metrology/Inspection/* Status Alpha-Step 500 *UP* Nanospec 2-Litho *UP* Nanospec 1-Etch *UP* P2 Profiler *PROBLEM* -11 stage error 5 */Microscpoes-/* #1 Leica/Analytical *UP* #2 Ergolux/Drytek2 *UP* #3 Olympus/Litho *UP* #4 Nikon Optiphot/Litho *UP* #5 Nikon/Litho *UP* #6 Leitz/Bosch *UP* #7 Leitz/Diffusion *UP* #8 Olympus/Litho *UP* #9 Olympus/Litho *UP* */Miscellaneous/* Status EVBond *PROBLEM* Left flag did not pull 3 KSBonder *PROBLEM* Leaking nitrogen hose 4 KSCoat *UP* Litho SRD *UP* -------------- next part -------------- An HTML attachment was scrubbed... URL: From gsosa at stanford.edu Wed Dec 15 07:29:24 2010 From: gsosa at stanford.edu (Gary Sosa) Date: Wed, 15 Dec 2010 07:29:24 -0800 Subject: Morning Litho status report 12/15 Message-ID: <4D08DED4.7090508@stanford.edu> Good morning All... Here is the morning Litho status report. ASML Stepper- 8" customer demo in progress. Not up for 4" wafer processing Laurel Spinner- Will be removed, late AM and send out for PM/evaluation Please check back in Coral for latest tool updates and current equipment status Thanks... The Litho Team */Photolithography Area Status/* */Wednesday, December 15, 2010/* */General Information / Lab Activities/* Lab Shutdown tomorrow, 7/16 at 7:00am Laurel spinner will be removed late morning, today. Sending out for PM */Exposure Tools/**//* Status Comments Priority ASML Stepper *DOWN* 8" Demo in progress EVAlign *UP* EVAlign2 *UP* EVG-Imprint *UP* Karl Suss 1 *UP* Karl Suss 2 *UP* */Manual Coaters/* Status EVGSpraycoat *UP* Headway *UP* Laurel *UP* */Coaters/* Process Status SVGCoat 3612 Process *Up* 3617 Process *Up* 220-7 Process *Problem* Optimizing process 1 SVGCoat2 3612 Process *Problem* Intermittant transfer problem 2 955-0.7 Process *Up* 220-3 Process *Up* */Developers/* Status SVGDEV *UP* SVGDEV2 *UP* */Ovens / Hotplates/* Status BLUEM *UP* Blue M 90 C. *UP* Blue M 110 C *PROBLEM* Temperature Drift. Controller on order 6 Blue M 150 C *PROBLEM* Temperature Drift. Controller on order 7 Fusion *DOWN* Hotplate experiments UV-Cure *UP* White-Oven *UP* YES Vapor Prime *UP* */Hotplates- /* Laurel-left *UP* Laurel- right *UP* Headway *UP* Torrey Pines- left *UP* 90 Deg C *UP* 115 Deg C *UP* Torrey Pines- Right *UP* */Metrology/Inspection/* Status Alpha-Step 500 *UP* Nanospec 2-Litho *UP* Nanospec 1-Etch *UP* P2 Profiler *PROBLEM* -11 stage error 5 */Microscpoes-/* #1 Leica/Analytical *UP* #2 Ergolux/Drytek2 *UP* #3 Olympus/Litho *UP* #4 Nikon Optiphot/Litho *UP* #5 Nikon/Litho *UP* #6 Leitz/Bosch *UP* #7 Leitz/Diffusion *UP* #8 Olympus/Litho *UP* #9 Olympus/Litho *UP* */Miscellaneous/* Status EVBond *PROBLEM* Left flag did not pull 3 KSBonder *PROBLEM* Leaking nitrogen hose 4 KSCoat *UP* Litho SRD *UP* -------------- next part -------------- An HTML attachment was scrubbed... URL: