From gsosa at stanford.edu Mon Oct 18 07:09:48 2010 From: gsosa at stanford.edu (Gary Sosa) Date: Mon, 18 Oct 2010 07:09:48 -0700 Subject: testing the email address Message-ID: <4CBC552C.9020501@stanford.edu> Testing Email Address From gsosa at stanford.edu Mon Oct 18 07:22:01 2010 From: gsosa at stanford.edu (Gary Sosa) Date: Mon, 18 Oct 2010 07:22:01 -0700 Subject: Testing report- Please disregard Message-ID: <4CBC5809.9010905@stanford.edu> */Photolithography Area Status/* */Monday, October 18, 2010/* */General Information / Lab Activities/* This is just a test report. Please disregard. */Exposure Tools/* Status Comments Priority ASML Stepper *UP* EVAlign *UP* EVAlign2 *UP* EVG-Imprint *UP* Karl Suss 1 *UP* Karl Suss 2 *UP* */Manual Coaters/* Status EVGSpraycoat *PROBLEM* 2 Headway *UP* Laurel *UP* */Coaters/* Process Status SVGCoat 3612 Process *Up* 3617 Process *Up* 220-7 Process *Problem* Optimizing process 1 SVGCoat2 3612 Process *Up* 955-0.7 Process *Up* 220-3 Process *Up* */Developers/* Status SVGDEV *UP* SVGDEV2 *UP* */Ovens / Hotplates/* Status BLUEM *UP* Blue M 90 C. *UP* Blue M 110 C *UP* Blue M 150 C *UP* Fusion *UP* UV-Cure *UP* White-Oven *UP* YES Vapor Prime *UP* */ Hotplates- /* Laurel-left *UP* Laurel- right *UP* Headway *UP* Torrey Pines- left *UP* 90 Deg C *UP* 115 Deg C *UP* Torrey Pines- Right *UP* */Metrology/Inspection/* Status Alpha-Step 500 *UP* Nanospec 2-Litho *UP* Nanospec 1-Etch *UP* P2 Profiler *UP* */ Microscpoes-/* #1 Leica/ *UP* #2 Ergolux/Drytek2 *UP* #3 Olympus/Litho *PROBLEM* Repairing computer for camera 3 #4 Nikon Optiphot/Litho *UP* #5 Nikon/Litho *UP* #6 Leitz/Bosch *UP* #7 Leitz/Diffusion *UP* #8 Olympus/Litho *UP* #9Olympus/Litho *UP* */Miscellaneous/* Status EVBond *UP* KSBonder *UP* KSCoat *UP* Litho SRD *UP* -------------- next part -------------- An HTML attachment was scrubbed... URL: From gsosa at stanford.edu Mon Oct 18 10:55:51 2010 From: gsosa at stanford.edu (Gary Sosa) Date: Mon, 18 Oct 2010 10:55:51 -0700 Subject: Litho Status 10/18 Message-ID: <4CBC8A27.7010802@stanford.edu> */Photolithography Area Status/* */Monday, October 18, 2010/* */General Information / Lab Activities/* Process clinic today at 2:00PM */Exposure Tools/* Status Comments Priority ASML Stepper *UP* EVAlign *UP* EVAlign2 *UP* EVG-Imprint *UP* Karl Suss 1 *UP* Karl Suss 2 *UP* UV lamp replaced 10/18 */Manual Coaters/* Status EVGSpraycoat *PROBLEM* Wobbly chuck 5 Headway *UP* Laurel *UP* */Coaters/* Process Status SVGCoat 3612 Process *Up* 3617 Process *Problem* Poor spin, suckback 2 220-7 Process *Problem* Optimizing process 1 SVGCoat2 3612 Process *Up* 955-0.7 Process *Up* 220-3 Process *Up* */Developers/* Status SVGDEV *UP* SVGDEV2 *UP* */Ovens / Hotplates/* Status BLUEM *UP* Blue M 90 C. *PROBLEM* Temperature Drift. Controller on order 3 Blue M 110 C *UP* Blue M 150 C *PROBLEM* Temperature Drift. Controller on order 4 Fusion *DOWN* Hotplate experiments UV-Cure *UP* White-Oven *UP* YES Vapor Prime *UP* */ Hotplates- /* Laurel-left *UP* Laurel- right *UP* Headway *UP* Torrey Pines- left *UP* 90 Deg C *UP* 115 Deg C *UP* Torrey Pines- Right *UP* */Metrology/Inspection/* Status Alpha-Step 500 *UP* Nanospec 2-Litho *UP* Nanospec 1-Etch *UP* P2 Profiler *UP* */ Microscpoes-/* #1 Leica/Analytical *UP* #2 Ergolux/Drytek2 *UP* #3 Olympus/Litho *PROBLEM* Repairing computer for camera 6 #4 Nikon Optiphot/Litho *UP* #5 Nikon/Litho *UP* #6 Leitz/Bosch *UP* #7 Leitz/Diffusion *UP* #8 Olympus/Litho *UP* #9 Olympus/Litho *UP* */Miscellaneous/* Status EVBond *PROBLEM* 1 bond chuck out for rebuild by EVG 7 KSBonder *UP* KSCoat *UP* Litho SRD *UP* -------------- next part -------------- An HTML attachment was scrubbed... URL: From gsosa at stanford.edu Tue Oct 19 07:05:01 2010 From: gsosa at stanford.edu (Gary Sosa) Date: Tue, 19 Oct 2010 07:05:01 -0700 Subject: Morning report, Tuesday 10/19 Message-ID: <4CBDA58D.3010603@stanford.edu> Good morning all. Here is the Litho morning report. */Photolithography Area Status/* */Tuesday, October 19, 2010/* */General Information / Lab Activities/* Mario out today Litho ADCOM Meeting-9:00 Allen 201 */Exposure Tools/**//* Status Comments Priority ASML Stepper *DOWN* Screen locked up 1 EVAlign *UP* EVAlign2 *UP* EVG-Imprint *UP* Karl Suss 1 *UP* Karl Suss 2 *UP* UV lamp replaced 10/18 */Manual Coaters/* Status EVGSpraycoat *PROBLEM* Wobbly chuck 6 Headway *UP* Laurel *UP* */Coaters/* Process Status SVGCoat 3612 Process *Up* 3617 Process *Problem* Poor spin, suckback 3 220-7 Process *Problem* Optimizing process 2 SVGCoat2 3612 Process *Up* 955-0.7 Process *Up* 220-3 Process *Up* */Developers/* Status SVGDEV *UP* SVGDEV2 *UP* */Ovens / Hotplates/* Status BLUEM *UP* Blue M 90 C. *PROBLEM* Temperature Drift. Controller on order 4 Blue M 110 C *UP* Blue M 150 C *PROBLEM* Temperature Drift. Controller on order 5 Fusion *DOWN* Hotplate experiments UV-Cure *UP* White-Oven *UP* YES Vapor Prime *UP* */ Hotplates- /* Laurel-left *UP* Laurel- right *UP* Headway *UP* Torrey Pines- left *UP* 90 Deg C *UP* 115 Deg C *UP* Torrey Pines- Right *UP* */Metrology/Inspection/* Status Alpha-Step 500 *UP* Nanospec 2-Litho *UP* Nanospec 1-Etch *UP* P2 Profiler *UP* */ Microscpoes-/* #1 Leica/Analytical *UP* #2 Ergolux/Drytek2 *UP* #3 Olympus/Litho *UP* PC disinfected and reinstalled #4 Nikon Optiphot/Litho *UP* #5 Nikon/Litho *UP* #6 Leitz/Bosch *UP* #7 Leitz/Diffusion *UP* #8 Olympus/Litho *UP* #9 Olympus/Litho *UP* */Miscellaneous/* Status EVBond *PROBLEM* 1 bond chuck out for rebuild by EVG 7 KSBonder *UP* KSCoat *UP* Litho SRD *UP* -------------- next part -------------- An HTML attachment was scrubbed... URL: From gsosa at stanford.edu Wed Oct 20 07:28:28 2010 From: gsosa at stanford.edu (Gary Sosa) Date: Wed, 20 Oct 2010 07:28:28 -0700 Subject: Litho Morning Statas 10/20 Message-ID: <4CBEFC8C.3010901@stanford.edu> Good morning All. Here is the Litho Morning Status */Photolithography Area Status/* */Wednesday, October 20, 2010/* */General Information / Lab Activities/* Staff Lab Cleanup- Preparation for Campus Cleanup, 8:00 to 9:00 AM */Exposure Tools/* Status Comments Priority ASML Stepper *PROBLEM* Software Bug, From 04/2010 EVAlign *UP* EVAlign2 *UP* EVG-Imprint *UP* Karl Suss 1 *UP* Karl Suss 2 *PROBLEM* UV lamp replaced 10/18 */Manual Coaters/* Status EVGSpraycoat *PROBLEM* Wobbly chuck Headway *UP* Laurel *UP* */Coaters/* Process Status SVGCoat 3612 Process *Up* 3617 Process *Up* 220-7 Process *Problem* Optimizing process 1 SVGCoat2 3612 Process *Up* 955-0.7 Process *Up* 220-3 Process *Up* */Developers/* Status SVGDEV *UP* SVGDEV2 *UP* */Ovens / Hotplates/* Status BLUEM *UP* Blue M 90 C. *UP* Blue M 110 C *PROBLEM* Temperature Drift. Controller on order 3 Blue M 150 C *PROBLEM* Temperature Drift. Controller on order 4 Fusion *DOWN* Hotplate experiments UV-Cure *UP* White-Oven *UP* YES Vapor Prime *UP* */ Hotplates- /* Laurel-left *UP* Laurel- right *UP* Headway *UP* Torrey Pines- left *UP* 90 Deg C *UP* 115 Deg C *UP* Torrey Pines- Right *UP* */Metrology/Inspection/* Status Alpha-Step 500 *UP* Nanospec 2-Litho *UP* Nanospec 1-Etch *UP* P2 Profiler *PROBLEM* Error -11 on Unload, reset to recover 2 */ Microscpoes-/* #1 Leica/Analytical *UP* #2 Ergolux/Drytek2 *UP* #3 Olympus/Litho *UP* PC disinfected and reinstalled #4 Nikon Optiphot/Litho *UP* #5 Nikon/Litho *UP* #6 Leitz/Bosch *UP* #7 Leitz/Diffusion *UP* #8 Olympus/Litho *UP* #9 Olympus/Litho *UP* */Miscellaneous/* Status EVBond *PROBLEM* 1 bond chuck out for rebuild by EVG KSBonder *UP* KSCoat *UP* Litho SRD *UP* -------------- next part -------------- An HTML attachment was scrubbed... URL: From gsosa at stanford.edu Thu Oct 21 07:06:20 2010 From: gsosa at stanford.edu (Gary Sosa) Date: Thu, 21 Oct 2010 07:06:20 -0700 Subject: Litho Morning Status Report 10/21 Message-ID: <4CC048DC.5020808@stanford.edu> Good Morning All. Here is the Litho morning report */Photolithography Area Status/* */Thursday, October 21, 2010/* */General Information / Lab Activities/* */Exposure Tools/**//* Status Comments Priority ASML Stepper *PROBLEM* Software Bug, From 04/2010 EVAlign *UP* EVAlign2 *UP* EVG-Imprint *UP* Karl Suss 1 *UP* Karl Suss 2 *PROBLEM* UV lamp replaced10/18 */Manual Coaters/* Status EVGSpraycoat *DOWN* Cleaning system and exhaust 3 Headway *UP* Laurel *UP* */Coaters/* Process Status SVGCoat 3612 Process *Up* 3617 Process *Up* 220-7 Process *Problem* Optimizing process 1 SVGCoat2 3612 Process *Problem* Poor spin 2 955-0.7 Process *Up* 220-3 Process *Up* */Developers/* Status SVGDEV *UP* SVGDEV2 *UP* */Ovens / Hotplates/* Status BLUEM *UP* Blue M 90 C. *UP* Blue M 110 C *PROBLEM* Temperature Drift. Controller on order 5 Blue M 150 C *PROBLEM* Temperature Drift. Controller on order 6 Fusion *DOWN* Hotplate experiments UV-Cure *UP* White-Oven *UP* YES Vapor Prime *UP* */Hotplates- /* Laurel-left *UP* Laurel- right *UP* Headway *UP* Torrey Pines- left *UP* 90 Deg C *UP* 115 Deg C *UP* Torrey Pines- Right *UP* */Metrology/Inspection/* Status Alpha-Step 500 *UP* Nanospec 2-Litho *UP* Nanospec 1-Etch *UP* P2 Profiler *PROBLEM* Error -11 on Unload, reset to recover 4 */Microscpoes-/* #1 Leica/Analytical *UP* #2 Ergolux/Drytek2 *UP* #3 Olympus/Litho *UP* PC disinfected and reinstalled #4 Nikon Optiphot/Litho *UP* #5 Nikon/Litho *UP* #6 Leitz/Bosch *UP* #7 Leitz/Diffusion *UP* #8 Olympus/Litho *UP* #9 Olympus/Litho *UP* */Miscellaneous/* Status EVBond *PROBLEM* 1 bond chuck out for rebuild by EVG KSBonder *UP* KSCoat *UP* Litho SRD *UP* -------------- next part -------------- An HTML attachment was scrubbed... URL: From gsosa at stanford.edu Fri Oct 22 07:20:36 2010 From: gsosa at stanford.edu (Gary Sosa) Date: Fri, 22 Oct 2010 07:20:36 -0700 Subject: Litho Area status Report 10/22 Message-ID: <4CC19DB4.4040702@stanford.edu> Good Morning All. Here is the Morning Litho status report. */Photolithography Area Status/* */Friday, October 22, 2010/* */General Information / Lab Activities/* */Exposure Tools/* Status Comments Priority ASML Stepper *UP* EVAlign *UP* EVAlign2 *UP* EVG-Imprint *UP* Karl Suss 1 *UP* Karl Suss 2 *PROBLEM* UV lamp replaced10/18 */Manual Coaters/* Status EVGSpraycoat *PROBLEM* Wobbly chuck 3 Headway *UP* Laurel *UP* */Coaters/* Process Status SVGCoat 3612 Process *Up* 3617 Process *Up* 220-7 Process *Problem* Optimizing process 1 SVGCoat2 3612 Process *Up* 955-0.7 Process *Up* 220-3 Process *Up* */Developers/* Status SVGDEV *UP* SVGDEV2 *UP* */Ovens / Hotplates/* Status BLUEM *UP* Blue M 90 C. *UP* Blue M 110 C *PROBLEM* Temperature Drift. Controller on order 5 Blue M 150 C *PROBLEM* Temperature Drift. Controller on order 6 Fusion *DOWN* Hotplate experiments UV-Cure *UP* White-Oven *UP* YES Vapor Prime *UP* */Hotplates- /* Laurel-left *UP* Laurel- right *UP* Headway *UP* Torrey Pines- left *UP* 90 Deg C *UP* 115 Deg C *UP* Torrey Pines- Right *UP* */Metrology/Inspection/* Status Alpha-Step 500 *UP* Nanospec 2-Litho *UP* Nanospec 1-Etch *UP* P2 Profiler *PROBLEM* Error -11 on Unload, reset to recover 4 */Microscpoes-/* #1 Leica/Analytical *UP* #2 Ergolux/Drytek2 *UP* #3 Olympus/Litho *PROBLEM* Camera Apps software issue 2 #4 Nikon Optiphot/Litho *UP* #5 Nikon/Litho *UP* #6 Leitz/Bosch *UP* #7 Leitz/Diffusion *UP* #8 Olympus/Litho *UP* #9 Olympus/Litho *UP* */Miscellaneous/* Status EVBond *PROBLEM* 1 bond chuck out for rebuild by EVG KSBonder *UP* KSCoat *UP* Litho SRD *UP* -------------- next part -------------- An HTML attachment was scrubbed... URL: From gsosa at stanford.edu Mon Oct 25 07:30:44 2010 From: gsosa at stanford.edu (Gary Sosa) Date: Mon, 25 Oct 2010 07:30:44 -0700 Subject: Morning Litho Status Report 10/25 Message-ID: <4CC59494.2080106@stanford.edu> Good Morning All. Here is the Litho Status Report. Karl Suss#2- User reports a theta rotation problem. Will investigate and repair as needed SVG Coat #1- User reports no EBR dispensing. Will check out system and repair as needed SVG Coat #2- User reports that wafers not transferring from sender to VP. Will check out and repair as needed. Please check back in Coral for the current status of tools. Thanks.... The Litho Team */Photolithography Area Status/* */Monday, October 25, 2010/* */General Information / Lab Activities/* EVG Bonder Back to Quartz pressure plate today */Exposure Tools/**//* Status Comments Priority ASML Stepper *UP* EVAlign *UP* EVAlign2 *UP* EVG-Imprint *UP* Karl Suss 1 *UP* Karl Suss 2 *PROBLEM* Theta rotation problem 3 */Manual Coaters/* Status EVGSpraycoat *PROBLEM* Wobbly chuck 4 Headway *UP* Laurel *UP* */Coaters/* Process Status SVGCoat 3612 Process *Problem* No EBR dispensing 1 3617 Process *Problem* 220-7 Process *Problem* Optimizing process SVGCoat2 3612 Process *Problem* Transfer problem from sender to VP 2 955-0.7 Process *Problem* 220-3 Process *Problem* */Developers/* Status SVGDEV *UP* SVGDEV2 *UP* */Ovens / Hotplates/* Status BLUEM *UP* Blue M 90 C. *UP* Blue M 110 C *PROBLEM* Temperature Drift. Controller on order 6 Blue M 150 C *PROBLEM* Temperature Drift. Controller on order 7 Fusion *DOWN* Hotplate experiments UV-Cure *UP* White-Oven *UP* YES Vapor Prime *UP* */Hotplates- /* Laurel-left *UP* Laurel- right *UP* Headway *UP* Torrey Pines- left *UP* 90 Deg C *UP* 115 Deg C *UP* Torrey Pines- Right *UP* */Metrology/Inspection/* Status Alpha-Step 500 *UP* Nanospec 2-Litho *UP* Nanospec 1-Etch *UP* P2 Profiler *PROBLEM* Error -11 on Unload, reset to recover 5 */Microscpoes-/* #1 Leica/Analytical *UP* #2 Ergolux/Drytek2 *UP* #3 Olympus/Litho *PROBLEM* Camera Apps software issue 8 #4 Nikon Optiphot/Litho *UP* #5 Nikon/Litho *UP* #6 Leitz/Bosch *UP* #7 Leitz/Diffusion *UP* #8 Olympus/Litho *UP* #9 Olympus/Litho *UP* */Miscellaneous/* Status EVBond *PROBLEM* 1 bond chuck out for rebuild by EVG KSBonder *UP* KSCoat *UP* Litho SRD *UP* -------------- next part -------------- An HTML attachment was scrubbed... URL: From gsosa at stanford.edu Tue Oct 26 07:25:04 2010 From: gsosa at stanford.edu (Gary Sosa) Date: Tue, 26 Oct 2010 07:25:04 -0700 Subject: Litho Morning Status Report 10/26 Message-ID: <4CC6E4C0.10004@stanford.edu> Good Morning All.... Here is the Litho Status report. SVG Coat 1: 3612 process down for suckback issues. Will continue to troubleshoot and resolve. Olympus Microscope w/Camera: Computer- 200+ infections removed, Camera software working correctly with Admin Login. All user data in tact. A/V software installed. Will do regular updates and scans to prevent/ minimize further infections. Thanks... Litho Team */Photolithography Area Status/* */Tuesday, October 26, 2010/* */General Information / Lab Activities/* Staff -Continued preparations for Thursday's "Campus Cleanup", 9:00AM - ? */Exposure Tools/* Status Comments Priority ASML Stepper *UP* EVAlign *UP* EVAlign2 *UP* EVG-Imprint *UP* Karl Suss 1 *UP* Karl Suss 2 *PROBLEM* */Manual Coaters/* Status EVGSpraycoat *PROBLEM* Wobbly chuck 4 Headway *UP* Laurel *UP* */Coaters/* Process Status SVGCoat 3612 Process *Down* No Suckback 1 3617 Process *Up* 220-7 Process *Problem* Optimizing process 2 SVGCoat2 3612 Process *Up* 955-0.7 Process *Up* 220-3 Process *Up* */Developers/* Status SVGDEV *UP* SVGDEV2 *UP* */Ovens / Hotplates/* Status BLUEM *UP* Blue M 90 C. *UP* Blue M 110 C *PROBLEM* Temperature Drift. Controller on order 5 Blue M 150 C *PROBLEM* Temperature Drift. Controller on order 6 Fusion *DOWN* Hotplate experiments UV-Cure *UP* White-Oven *UP* YES Vapor Prime *UP* */Hotplates- /* Laurel-left *UP* Laurel- right *UP* Headway *UP* Torrey Pines- left *UP* 90 Deg C *UP* 115 Deg C *UP* Torrey Pines- Right *UP* */Metrology/Inspection/* Status Alpha-Step 500 *UP* Nanospec 2-Litho *UP* Nanospec 1-Etch *UP* P2 Profiler *PROBLEM* Error -11 on Unload, reset to recover 3 */Microscpoes-/* #1 Leica/Analytical *UP* #2 Ergolux/Drytek2 *UP* #3 Olympus/Litho *UP* Camera App and Data OK #4 Nikon Optiphot/Litho *UP* #5 Nikon/Litho *UP* #6 Leitz/Bosch *UP* #7 Leitz/Diffusion *UP* #8 Olympus/Litho *UP* #9 Olympus/Litho *UP* */Miscellaneous/* Status EVBond *PROBLEM* 1 bond chuck out for rebuild by EVG KSBonder *UP* KSCoat *UP* Litho SRD *UP* -------------- next part -------------- An HTML attachment was scrubbed... URL: From gsosa at stanford.edu Wed Oct 27 07:19:50 2010 From: gsosa at stanford.edu (Gary Sosa) Date: Wed, 27 Oct 2010 07:19:50 -0700 Subject: Litho Morning Status 10/27 Message-ID: <4CC83506.3080303@stanford.edu> Good Morning All.... Here is the Litho morning status report. Karl Suss 1: User accidentally depressed the EMO. Will power up tool/lamp and do a full hardware reset and lamp check. SVG Dev 1: Wafer transfer problem. Will investigate and repair as needed EV Bonder: User reports top electrode temperature problem. Will investigate. May need to replace the heater lamps. Please check back in Coral for current status and updates. Thanks.... The Litho Team */Photolithography Area Status/* */Wednesday, October 27, 2010/* */General Information / Lab Activities/* Mario on vacation today Staff IRT meeting- 9:00 AM */Exposure Tools/* Status Comments Priority ASML Stepper *UP* EVAlign *UP* EVAlign2 *UP* EVG-Imprint *UP* Karl Suss 1 *DOWN* EMO Accidentally depressed 1 Karl Suss 2 *PROBLEM* */Manual Coaters/* Status EVGSpraycoat *PROBLEM* Wobbly chuck 5 Headway *UP* Laurel *UP* */Coaters/* Process Status SVGCoat 3612 Process *Up* 3617 Process *Up* 220-7 Process *Problem* Optimizing process 4 SVGCoat2 3612 Process *Up* 955-0.7 Process *Up* 220-3 Process *Up* */Developers/* Status SVGDEV *DOWN* Wafer transfer problem 2 SVGDEV2 *UP* */Ovens / Hotplates/* Status BLUEM *UP* Blue M 90 C. *UP* Blue M 110 C *PROBLEM* Temperature Drift. Controller on order 7 Blue M 150 C *PROBLEM* Temperature Drift. Controller on order 8 Fusion *DOWN* Hotplate experiments UV-Cure *UP* White-Oven *UP* YES Vapor Prime *UP* */Hotplates- /* Laurel-left *UP* Laurel- right *UP* Headway *UP* Torrey Pines- left *UP* 90 Deg C *UP* 115 Deg C *UP* Torrey Pines- Right *UP* */Metrology/Inspection/* Status Alpha-Step 500 *UP* Nanospec 2-Litho *UP* Nanospec 1-Etch *UP* P2 Profiler *PROBLEM* Error -11 on Unload, reset to recover 6 */Microscpoes-/* #1 Leica/Analytical *UP* #2 Ergolux/Drytek2 *UP* #3 Olympus/Litho *UP* Camera App and Data OK #4 Nikon Optiphot/Litho *UP* #5 Nikon/Litho *UP* #6 Leitz/Bosch *UP* #7 Leitz/Diffusion *UP* #8 Olympus/Litho *UP* #9 Olympus/Litho *UP* */Miscellaneous/* Status EVBond *PROBLEM* Top Heater problem 3 KSBonder *UP* KSCoat *UP* Litho SRD *UP* -------------- next part -------------- An HTML attachment was scrubbed... URL: From gsosa at stanford.edu Thu Oct 28 07:23:17 2010 From: gsosa at stanford.edu (Gary Sosa) Date: Thu, 28 Oct 2010 07:23:17 -0700 Subject: Litho Status Report 10/28 Message-ID: <4CC98755.8020207@stanford.edu> Good morning All.. Here is the morning Litho Status Report ASML Stepper will be converted to 6" today as per a user request. Stepper will be converted back to 4" this afternoon. SVG Coat 2: User reported that wafers not moving out of the sender. Will investigate and repair Please check back in Coral for current tool status and updates. Thanks.. Litho Team */Photolithography Area Status/* */Thursday, October 28, 2010/* */General Information / Lab Activities/* Campus cleanup today! ASML Stepper converted to 6" today */Exposure Tools/**//* Status Comments Priority ASML Stepper *UP* 6" conversion EVAlign *UP* EVAlign2 *UP* EVG-Imprint *UP* Karl Suss 1 *UP* Karl Suss 2 *PROBLEM* */Manual Coaters/* Status EVGSpraycoat *PROBLEM* Wobbly chuck 3 Headway *UP* Laurel *UP* */Coaters/* Process Status SVGCoat 3612 Process *Up* 3617 Process *Up* 220-7 Process *Problem* Optimizing process 2 SVGCoat2 3612 Process *Problem* Wafer transfer problem 1 955-0.7 Process *Up* 220-3 Process *Up* */Developers/* Status SVGDEV *UP* SVGDEV2 *UP* */Ovens / Hotplates/* Status BLUEM *UP* Blue M 90 C. *UP* Blue M 110 C *PROBLEM* Temperature Drift. Controller on order 5 Blue M 150 C *PROBLEM* Temperature Drift. Controller on order 6 Fusion *DOWN* Hotplate experiments UV-Cure *UP* White-Oven *UP* YES Vapor Prime *UP* */Hotplates- /* Laurel-left *UP* Laurel- right *UP* Headway *UP* Torrey Pines- left *UP* 90 Deg C *UP* 115 Deg C *UP* Torrey Pines- Right *UP* */Metrology/Inspection/* Status Alpha-Step 500 *UP* Nanospec 2-Litho *UP* Nanospec 1-Etch *UP* P2 Profiler *PROBLEM* Error -11 on Unload, reset to recover 4 */Microscpoes-/* #1 Leica/Analytical *UP* #2 Ergolux/Drytek2 *UP* #3 Olympus/Litho *UP* Camera App and Data OK #4 Nikon Optiphot/Litho *UP* #5 Nikon/Litho *UP* #6 Leitz/Bosch *UP* #7 Leitz/Diffusion *UP* #8 Olympus/Litho *UP* #9 Olympus/Litho *UP* */Miscellaneous/* Status EVBond *PROBLEM* Bond chuck rebuild by EVG KSBonder *UP* KSCoat *UP* Litho SRD *UP* -------------- next part -------------- An HTML attachment was scrubbed... URL: From vilanova at stanford.edu Fri Oct 29 08:43:00 2010 From: vilanova at stanford.edu (Mario Vilanova) Date: Fri, 29 Oct 2010 08:43:00 -0700 Subject: Litho Status Report 10/29/2010 Message-ID: <4CCAEB84.8000904@stanford.edu> > Good morning All.. > > Here is the morning Litho Status Report > > ASML Stepper , HotSpot At Top Center Chuck, JOey From ASML will be > here to clean it up. > > > Please check back in Coral for current tool status and updates. > > Thanks.. Litho Team > > > */Photolithography Area Status/* > > > > > > */Friday, October 29, 2010/* > > > > > > > > > > > > > > > > > > > */Exposure Tools/**//* > > > > Status > > > > Comments > > > > Priority > > ASML Stepper > > > > *UP* > > > > 6" conversion > > > > EVAlign > > > > *UP* > > > > > > EVAlign2 > > > > *UP* > > > > > > EVG-Imprint > > > > *UP* > > > > > > Karl Suss 1 > > > > *UP* > > > > > > Karl Suss 2 > > > > *PROBLEM* > > > > > > */Manual Coaters/* > > > > Status > > > > > > EVGSpraycoat > > > > *PROBLEM* > > > > Wobbly chuck > > > > 3 > > Headway > > > > *UP* > > > > > > Laurel > > > > *UP* > > > > > > */Coaters/* > > > > Process Status > > > > > > SVGCoat > > > > 3612 Process > > > > *Up* > > > > > > 3617 Process > > > > *Up* > > > > > > 220-7 Process > > > > *Problem* > > > > Optimizing process > > > > 2 > > SVGCoat2 > > > > 3612 Process > > > > *Up* > > > > > > > > 955-0.7 Process > > > > *Up* > > > > > > 220-3 Process > > > > *Up* > > > > > > */Developers/* > > > > Status > > > > > > SVGDEV > > > > *UP* > > > > > > SVGDEV2 > > > > *UP* > > > > > > */Ovens / Hotplates/* > > > > Status > > > > > > BLUEM > > > > *UP* > > > > > > Blue M 90 C. > > > > *UP* > > > > > > Blue M 110 C > > > > *PROBLEM* > > > > Temperature Drift. Controller on order > > > > 5 > > Blue M 150 C > > > > *PROBLEM* > > > > Temperature Drift. Controller on order > > > > 6 > > Fusion > > > > *DOWN* > > > > Hotplate experiments > > > > UV-Cure > > > > *UP* > > > > > > White-Oven > > > > *UP* > > > > > > YES Vapor Prime > > > > *UP* > > > > > > */Hotplates- /* > > > > > > > > Laurel-left > > > > *UP* > > > > > > Laurel- right > > > > *UP* > > > > > > Headway > > > > *UP* > > > > > > Torrey Pines- left > > > > *UP* > > > > > > 90 Deg C > > > > *UP* > > > > > > 115 Deg C > > > > *UP* > > > > > > Torrey Pines- Right > > > > *UP* > > > > > > */Metrology/Inspection/* > > > > Status > > > > > > Alpha-Step 500 > > > > *UP* > > > > > > Nanospec 2-Litho > > > > *UP* > > > > > > Nanospec 1-Etch > > > > *UP* > > > > > > P2 Profiler > > > > *PROBLEM* > > > > Error -11 on Unload, reset to recover > > > > 4 > > */Microscpoes-/* > > > > > > > > #1 Leica/Analytical > > > > *UP* > > > > > > #2 Ergolux/Drytek2 > > > > *UP* > > > > > > #3 Olympus/Litho > > > > *UP* > > > > Camera App and Data OK > > > > #4 Nikon Optiphot/Litho > > > > *UP* > > > > > > #5 Nikon/Litho > > > > *UP* > > > > > > #6 Leitz/Bosch > > > > *UP* > > > > > > #7 Leitz/Diffusion > > > > *UP* > > > > > > #8 Olympus/Litho > > > > *UP* > > > > > > #9 Olympus/Litho > > > > *UP* > > > > > > */Miscellaneous/* > > > > Status > > > > > > EVBond > > > > *PROBLEM* > > > > Bond chuck rebuild by EVG > > > > KSBonder > > > > *UP* > > > > > > KSCoat > > > > *UP* > > > > > > Litho SRD > > > > *UP* > > > > > > > > > > > > > > > > > > -------------- next part -------------- An HTML attachment was scrubbed... URL: From vilanova at stanford.edu Fri Oct 29 10:19:42 2010 From: vilanova at stanford.edu (Mario Vilanova) Date: Fri, 29 Oct 2010 10:19:42 -0700 Subject: Litho Status Report 10/29/2010 Message-ID: <4CCB022E.9040403@stanford.edu> */ /* */ Photolithography Area Status/* */Friday, October 29, 2010/* */Exposure Tools/**//* Status Comments Priority ASML Stepper *UP* EVAlign *UP* EVAlign2 *UP* EVG-Imprint *UP* Karl Suss 1 *UP* Karl Suss 2 *PROBLEM* */Manual Coaters/* Status EVGSpraycoat *PROBLEM* Wobbly chuck 3 Headway *UP* Laurel *UP* */Coaters/* Process Status SVGCoat 3612 Process *Up* 3617 Process *Up* 220-7 Process *Problem* Optimizing process 2 SVGCoat2 3612 Process *Problem* Wafer transfer problem 1 955-0.7 Process *Up* 220-3 Process *Up* */Developers/* Status SVGDEV *UP* SVGDEV2 *UP* */Ovens / Hotplates/* Status BLUEM *UP* Blue M 90 C. *UP* Blue M 110 C *PROBLEM* Temperature Drift. Controller on order 5 Blue M 150 C *PROBLEM* Temperature Drift. Controller on order 6 Fusion *DOWN* Hotplate experiments UV-Cure *UP* White-Oven *UP* YES Vapor Prime *UP* */Hotplates- /* Laurel-left *UP* Laurel- right *UP* Headway *UP* Torrey Pines- left *UP* 90 Deg C *UP* 115 Deg C *UP* Torrey Pines- Right *UP* */Metrology/Inspection/* Status Alpha-Step 500 *UP* Nanospec 2-Litho *UP* Nanospec 1-Etch *UP* P2 Profiler *PROBLEM* Error -11 on Unload, reset to recover 4 */Microscpoes-/* #1 Leica/Analytical *UP* #2 Ergolux/Drytek2 *UP* #3 Olympus/Litho *UP* Camera App and Data OK #4 Nikon Optiphot/Litho *UP* #5 Nikon/Litho *UP* #6 Leitz/Bosch *UP* #7 Leitz/Diffusion *UP* #8 Olympus/Litho *UP* #9 Olympus/Litho *UP* */Miscellaneous/* Status EVBond *PROBLEM* Bond chuck rebuild by EVG KSBonder *UP* KSCoat *UP* Litho SRD *UP* -------------- next part -------------- An HTML attachment was scrubbed... URL: