From gsosa at stanford.edu Mon Aug 1 07:46:33 2011 From: gsosa at stanford.edu (Gary Sosa) Date: Mon, 01 Aug 2011 07:46:33 -0700 Subject: Morning Litho status report 8/1 Message-ID: <4E36BC49.6080508@stanford.edu> Good morning All- Here is the morning Litho status report SVG Coat 1- User reports a drain full alarm. Will check out on morning rounds. Note 1: There will be an ASML Stepper maintenance training class from 7/25 through 8/12. During certain parts of the day the stepper will be unavailable as the trainers will be using the tool for the "hands-on" portion of the training class. There will be a large group gathered around the stepper during this time and the area around the stepper will be blocked off to normal traffic. Please observe the barricades during this time period. We apologize for the inconvenience and thank you for your patience and understanding. Please check back in Coral for the latest tool updates and current equipment status. Thanks... The Litho Team */Photolithography Area Status/* */Monday, August 01, 2011/* */General Information / Lab Activities/* ASML 3 week training class in progress Mahnaz- Vacation today */Exposure Tools/**//* Status Comments Priority ASML Stepper *PROBLEM* Intermittent carrier inspection 1 EVAlign *UP* EVAlign2 *UP* EVG-Imprint *UP* Karl Suss 1 *UP* Karl Suss 2 *UP* */Manual Coaters/* Status EVGSpraycoat *UP* Headway *UP* Laurel *UP* */Coaters/* Process Status SVGCoat 3612 Process *Problem* Drain full 2 3617 Process *Up* 220-7 Process *Up* SVGCoat2 3612 Process *Up* 955-0.7 Process *Up* 220-3 Process *Up* */Developers/* Status SVGDEV *UP* SVGDEV2 *UP* */Ovens / Hotplates/* Status BLUEM *UP* Blue M 90 C. *UP* Blue M 110 C *UP* Blue M 150 C *UP* Fusion *UP* UV-Cure *UP* White-Oven *UP* YES Vapor Prime *UP* */Hotplates- /* Laurel-left *UP* Laurel- right *UP* Headway *UP* Torrey Pines- left *UP* 90 Deg C *UP* 115 Deg C *UP* Torrey Pines- Right *UP* */Metrology/Inspection/* Status Alpha-Step 500 *UP* Nanospec 2-Litho *UP* Nanospec 1-Etch *UP* P2 Profiler *UP* */Microscpoes-/* #1 Leica/ *UP* #2 Ergolux/Drytek2 *UP* #3 Olympus/Litho *UP* #4 Nikon Optiphot/Litho *UP* #5 Nikon/Litho *UP* #6 Leitz/Bosch *UP* #7 Leitz/Diffusion *UP* #8 Olympus/Litho *UP* #9Olympus/Litho *UP* */Miscellaneous/* Status EVBond *PROBLEM* New graphite on order 3 KSBonder *UP* KSCoat *UP* Litho SRD *UP* Mask Cleaner *UP* -------------- next part -------------- An HTML attachment was scrubbed... URL: From gsosa at stanford.edu Tue Aug 2 07:29:50 2011 From: gsosa at stanford.edu (Gary Sosa) Date: Tue, 02 Aug 2011 07:29:50 -0700 Subject: Morning Litho status report 8/2 Message-ID: <4E3809DE.4040601@stanford.edu> Good morning All- Here is the morning Litho status report SVG Coat 2 - User reports that sender is not sending wafers. Will check out on morning rounds. Note 1: There will be an ASML Stepper maintenance training class from 7/25 through 8/12. During certain parts of the day the stepper will be unavailable as the trainers will be using the tool for the "hands-on" portion of the training class. There will be a large group gathered around the stepper during this time and the area around the stepper will be blocked off to normal traffic. Please observe the barricades during this time period. We apologize for the inconvenience and thank you for your patience and understanding. Please check back in Coral for the latest tool updates and current equipment status. Thanks... The Litho Team */Photolithography Area Status/* */Tuesday, August 02, 2011/* */General Information / Lab Activities/* ASML 3 week training class in progress */Exposure Tools/**//* Status Comments Priority ASML Stepper *PROBLEM* Intermittent carrier inspection 2 EVAlign *UP* EVAlign2 *UP* EVG-Imprint *UP* Karl Suss 1 *UP* Karl Suss 2 *UP* */Manual Coaters/* Status EVGSpraycoat *UP* Headway *UP* Laurel *UP* */Coaters/* Process Status SVGCoat 3612 Process *Up* 3617 Process *Up* 220-7 Process *Up* SVGCoat2 3612 Process *Problem* Not sending wafers 1 955-0.7 Process *Up* 220-3 Process *Up* */Developers/* Status SVGDEV *UP* SVGDEV2 *UP* */Ovens / Hotplates/* Status BLUEM *UP* Blue M 90 C. *UP* Blue M 110 C *UP* Blue M 150 C *UP* Fusion *UP* UV-Cure *UP* White-Oven *UP* YES Vapor Prime *UP* */Hotplates- /* Laurel-left *UP* Laurel- right *UP* Headway *UP* Torrey Pines- left *UP* 90 Deg C *UP* 115 Deg C *UP* Torrey Pines- Right *UP* */Metrology/Inspection/* Status Alpha-Step 500 *UP* Nanospec 2-Litho *UP* Nanospec 1-Etch *UP* P2 Profiler *UP* */Microscpoes-/* #1 Leica/ *UP* #2 Ergolux/Drytek2 *UP* #3 Olympus/Litho *UP* #4 Nikon Optiphot/Litho *UP* #5 Nikon/Litho *UP* #6 Leitz/Bosch *UP* #7 Leitz/Diffusion *UP* #8 Olympus/Litho *UP* #9Olympus/Litho *UP* */Miscellaneous/* Status EVBond *PROBLEM* New graphite on order 3 KSBonder *UP* KSCoat *UP* Litho SRD *UP* Mask Cleaner *UP* -------------- next part -------------- An HTML attachment was scrubbed... URL: From gsosa at stanford.edu Wed Aug 3 07:39:11 2011 From: gsosa at stanford.edu (Gary Sosa) Date: Wed, 03 Aug 2011 07:39:11 -0700 Subject: Morning Litho status report 8/3 Message-ID: <4E395D8F.1000104@stanford.edu> Good morning All- Here is the morning Litho status report SVG Dev- User reports that backs of wafers are wet after processing. Will check out on morning rounds Karl Suss 2- User reports an over-current error. Will check out on morning rounds Note 1: There will be an ASML Stepper maintenance training class from 7/25 through 8/12. During certain parts of the day the stepper will be unavailable as the trainers will be using the tool for the "hands-on" portion of the training class. There will be a large group gathered around the stepper during this time and the area around the stepper will be blocked off to normal traffic. Please observe the barricades during this time period. We apologize for the inconvenience and thank you for your patience and understanding. Please check back in Coral for the latest tool updates and current equipment status. Thanks... The Litho Team */Photolithography Area Status/* */Wednesday, August 03, 2011/* */General Information / Lab Activities/* ASML 3 week training class in progress */Exposure Tools/**//* Status Comments Priority ASML Stepper *PROBLEM* Intermittent carrier inspection 3 EVAlign *UP* EVAlign2 *UP* EVG-Imprint *UP* Karl Suss 1 *UP* Karl Suss 2 *PROBLEM* Overcurrent error 1 */Manual Coaters/* Status EVGSpraycoat *UP* Headway *UP* Laurel *UP* */Coaters/* Process Status SVGCoat 3612 Process *Up* 3617 Process *Up* 220-7 Process *Up* SVGCoat2 3612 Process *Up* 955-0.7 Process *Up* 220-3 Process *Up* */Developers/* Status SVGDEV *PROBLEM* Backside wetting 2 SVGDEV2 *UP* */Ovens / Hotplates/* Status BLUEM *UP* Blue M 90 C. *UP* Blue M 110 C *UP* Blue M 150 C *UP* Fusion *UP* UV-Cure *UP* White-Oven *UP* YES Vapor Prime *UP* */Hotplates- /* Laurel-left *UP* Laurel- right *UP* Headway *UP* Torrey Pines- left *UP* 90 Deg C *UP* 115 Deg C *UP* Torrey Pines- Right *UP* */Metrology/Inspection/* Status Alpha-Step 500 *UP* Nanospec 2-Litho *UP* Nanospec 1-Etch *UP* P2 Profiler *UP* */Microscpoes-/* #1 Leica/ *UP* #2 Ergolux/Drytek2 *UP* #3 Olympus/Litho *UP* #4 Nikon Optiphot/Litho *UP* #5 Nikon/Litho *UP* #6 Leitz/Bosch *UP* #7 Leitz/Diffusion *UP* #8 Olympus/Litho *UP* #9Olympus/Litho *UP* */Miscellaneous/* Status EVBond *PROBLEM* New graphite on order ETA 8/9 4 KSBonder *UP* KSCoat *UP* Litho SRD *UP* Mask Cleaner *UP* -------------- next part -------------- An HTML attachment was scrubbed... URL: From gsosa at stanford.edu Thu Aug 4 07:37:47 2011 From: gsosa at stanford.edu (Gary Sosa) Date: Thu, 04 Aug 2011 07:37:47 -0700 Subject: Morning Litho status report 8/4 Message-ID: <4E3AAEBB.1070608@stanford.edu> Good morning All- Here is the morning Litho status report SVG Coat 1- User reports poor spin on 220-7, 7.0um process. Will check out on morning rounds SVG Coat 2- User reports air bubble in 3612 dispense line. Will check out on morning rounds Note 1: There will be an ASML Stepper maintenance training class from 7/25 through 8/12. During certain parts of the day the stepper will be unavailable as the trainers will be using the tool for the "hands-on" portion of the training class. There will be a large group gathered around the stepper during this time and the area around the stepper will be blocked off to normal traffic. Please observe the barricades during this time period. We apologize for the inconvenience and thank you for your patience and understanding. Please check back in Coral for the latest tool updates and current equipment status. Thanks... The Litho Team */Photolithography Area Status/* */Thursday, August 04, 2011/* */General Information / Lab Activities/* ASML 3 week training class in progress */Exposure Tools/**//* Status Comments Priority ASML Stepper *PROBLEM* Intermittent carrier inspection 3 EVAlign *UP* EVAlign2 *UP* EVG-Imprint *UP* Karl Suss 1 *UP* Karl Suss 2 *UP* */Manual Coaters/* Status EVGSpraycoat *UP* Headway *UP* Laurel *UP* */Coaters/* Process Status SVGCoat 3612 Process *Up* 3617 Process *Up* 220-7 Process *Problem* Poor spin 1 SVGCoat2 3612 Process *Problem* bubbles in dispense line 2 955-0.7 Process *Up* 220-3 Process *Up* */Developers/* Status SVGDEV *UP* SVGDEV2 *UP* */Ovens / Hotplates/* Status BLUEM *UP* Blue M 90 C. *UP* Blue M 110 C *UP* Blue M 150 C *UP* Fusion *UP* UV-Cure *UP* White-Oven *UP* YES Vapor Prime *UP* */Hotplates- /* Laurel-left *UP* Laurel- right *UP* Headway *UP* Torrey Pines- left *UP* 90 Deg C *UP* 115 Deg C *UP* Torrey Pines- Right *UP* */Metrology/Inspection/* Status Alpha-Step 500 *UP* Nanospec 2-Litho *UP* Nanospec 1-Etch *UP* P2 Profiler *UP* */Microscpoes-/* #1 Leica/ *UP* #2 Ergolux/Drytek2 *UP* #3 Olympus/Litho *UP* #4 Nikon Optiphot/Litho *UP* #5 Nikon/Litho *UP* #6 Leitz/Bosch *UP* #7 Leitz/Diffusion *UP* #8 Olympus/Litho *UP* #9Olympus/Litho *UP* */Miscellaneous/* Status EVBond *PROBLEM* New graphite on order ETA 8/9 4 KSBonder *UP* KSCoat *UP* Litho SRD *UP* Mask Cleaner *UP* -------------- next part -------------- An HTML attachment was scrubbed... URL: From gsosa at stanford.edu Fri Aug 5 07:26:02 2011 From: gsosa at stanford.edu (Gary Sosa) Date: Fri, 05 Aug 2011 07:26:02 -0700 Subject: Morning Litho status reports 8/5 Message-ID: <4E3BFD7A.5020404@stanford.edu> Good morning All- Here is the morning Litho status report SVG Coat 1- Shutdown. User reports accidentally dropping quartz pieces into process bowl. Will retrieve the users substrates and verify track operation Note 1: There will be an ASML Stepper maintenance training class from 7/25 through 8/12. During certain parts of the day the stepper will be unavailable as the trainers will be using the tool for the "hands-on" portion of the training class. There will be a large group gathered around the stepper during this time and the area around the stepper will be blocked off to normal traffic. Please observe the barricades during this time period. We apologize for the inconvenience and thank you for your patience and understanding. Please check back in Coral for the latest tool updates and current equipment status. Thanks... The Litho Team */Photolithography Area Status/* */Friday, August 05, 2011/* */General Information / Lab Activities/* ASML 3 week training class in progress Mario- Out today */Exposure Tools/**//* Status Comments Priority ASML Stepper *PROBLEM* Intermittent carrier inspection 3 EVAlign *UP* EVAlign2 *UP* EVG-Imprint *UP* Karl Suss 1 *UP* Karl Suss 2 *UP* */Manual Coaters/* Status EVGSpraycoat *UP* Headway *UP* Laurel *UP* */Coaters/* Process Status SVGCoat 3612 Process *Down* Wafer pieces lost in coater bowl 1 3617 Process *Up* 220-7 Process *Up* SVGCoat2 3612 Process *Problem* bubbles in dispense line 2 955-0.7 Process *Up* 220-3 Process *Up* */Developers/* Status SVGDEV *UP* SVGDEV2 *UP* */Ovens / Hotplates/* Status BLUEM *UP* Blue M 90 C. *UP* Blue M 110 C *UP* Blue M 150 C *UP* Fusion *UP* UV-Cure *UP* White-Oven *UP* YES Vapor Prime *UP* */Hotplates- /* Laurel-left *UP* Laurel- right *UP* Headway *UP* Torrey Pines- left *UP* 90 Deg C *UP* 115 Deg C *UP* Torrey Pines- Right *UP* */Metrology/Inspection/* Status Alpha-Step 500 *UP* Nanospec 2-Litho *UP* Nanospec 1-Etch *UP* P2 Profiler *UP* */Microscpoes-/* #1 Leica/ *UP* #2 Ergolux/Drytek2 *UP* #3 Olympus/Litho *UP* #4 Nikon Optiphot/Litho *UP* #5 Nikon/Litho *UP* #6 Leitz/Bosch *UP* #7 Leitz/Diffusion *UP* #8 Olympus/Litho *UP* #9Olympus/Litho *UP* */Miscellaneous/* Status EVBond *PROBLEM* New graphite on order ETA 8/9 4 KSBonder *UP* KSCoat *UP* Litho SRD *UP* Mask Cleaner *UP* -------------- next part -------------- An HTML attachment was scrubbed... URL: From gsosa at stanford.edu Mon Aug 8 07:56:38 2011 From: gsosa at stanford.edu (Gary Sosa) Date: Mon, 08 Aug 2011 07:56:38 -0700 Subject: Morning Litho status report 8/8 Message-ID: <4E3FF926.1000103@stanford.edu> Good morning All- Here is the morning Litho status report No new problems reported over the weekend. Note 1: There will be an ASML Stepper maintenance training class from 7/25 through 8/12. During certain parts of the day the stepper will be unavailable as the trainers will be using the tool for the "hands-on" portion of the training class. There will be a large group gathered around the stepper during this time and the area around the stepper will be blocked off to normal traffic. Please observe the barricades during this time period. We apologize for the inconvenience and thank you for your patience and understanding. Please check back in Coral for the latest tool updates and current equipment status. Thanks... The Litho Team */Photolithography Area Status/* */Monday, August 08, 2011/* */General Information / Lab Activities/* ASML 3 week training class in progress */Exposure Tools/**//* Status Comments Priority ASML Stepper *PROBLEM* Intermittent carrier inspection 2 EVAlign *UP* EVAlign2 *UP* EVG-Imprint *UP* Karl Suss 1 *UP* Karl Suss 2 *UP* */Manual Coaters/* Status EVGSpraycoat *UP* Headway *UP* Laurel *UP* */Coaters/* Process Status SVGCoat 3612 Process *Up* 3617 Process *Up* 220-7 Process *Up* SVGCoat2 3612 Process *Problem* bubbles in dispense line 1 955-0.7 Process *Up* 220-3 Process *Up* */Developers/* Status SVGDEV *UP* SVGDEV2 *UP* */Ovens / Hotplates/* Status BLUEM *UP* Blue M 90 C. *UP* Blue M 110 C *UP* Blue M 150 C *UP* Fusion *UP* UV-Cure *UP* White-Oven *UP* YES Vapor Prime *UP* */Hotplates- /* Laurel-left *UP* Laurel- right *UP* Headway *UP* Torrey Pines- left *UP* 90 Deg C *UP* 115 Deg C *UP* Torrey Pines- Right *UP* */Metrology/Inspection/* Status Alpha-Step 500 *UP* Nanospec 2-Litho *UP* Nanospec 1-Etch *UP* P2 Profiler *UP* */Microscpoes-/* #1 Leica/ *UP* #2 Ergolux/Drytek2 *UP* #3 Olympus/Litho *UP* #4 Nikon Optiphot/Litho *UP* #5 Nikon/Litho *UP* #6 Leitz/Bosch *UP* #7 Leitz/Diffusion *UP* #8 Olympus/Litho *UP* #9Olympus/Litho *UP* */Miscellaneous/* Status EVBond *PROBLEM* New graphite on order ETA 8/9 3 KSBonder *UP* KSCoat *UP* Litho SRD *UP* Mask Cleaner *UP* -------------- next part -------------- An HTML attachment was scrubbed... URL: From gsosa at stanford.edu Tue Aug 9 07:20:24 2011 From: gsosa at stanford.edu (Gary Sosa) Date: Tue, 09 Aug 2011 07:20:24 -0700 Subject: Morning Litho status report 8/9 Message-ID: <4E414228.6010302@stanford.edu> Good morning All- Here is the morning Litho status report SVG Coat2- User reports that the computer crashed. Will check out on morning rounds Note 1: There will be an ASML Stepper maintenance training class from 7/25 through 8/12. During certain parts of the day the stepper will be unavailable as the trainers will be using the tool for the "hands-on" portion of the training class. There will be a large group gathered around the stepper during this time and the area around the stepper will be blocked off to normal traffic. Please observe the barricades during this time period. We apologize for the inconvenience and thank you for your patience and understanding. Please check back in Coral for the latest tool updates and current equipment status. Thanks... The Litho Team */Photolithography Area Status/* */Tuesday, August 09, 2011/* */General Information / Lab Activities/* ASML 3 week training class in progress */Exposure Tools/**//* Status Comments Priority ASML Stepper *PROBLEM* Intermittent carrier inspection 2 EVAlign *UP* EVAlign2 *UP* EVG-Imprint *UP* Karl Suss 1 *UP* Karl Suss 2 *UP* */Manual Coaters/* Status EVGSpraycoat *UP* Headway *UP* Laurel *UP* */Coaters/* Process Status SVGCoat 3612 Process *Up* 3617 Process *Up* 220-7 Process *Up* SVGCoat2 3612 Process *Problem* Computer lockup 1 955-0.7 Process *Up* 220-3 Process *Up* */Developers/* Status SVGDEV *UP* SVGDEV2 *UP* */Ovens / Hotplates/* Status BLUEM *UP* Blue M 90 C. *UP* Blue M 110 C *UP* Blue M 150 C *UP* Fusion *UP* UV-Cure *UP* White-Oven *UP* YES Vapor Prime *UP* */Hotplates- /* Laurel-left *UP* Laurel- right *UP* Headway *UP* Torrey Pines- left *UP* 90 Deg C *UP* 115 Deg C *UP* Torrey Pines- Right *UP* */Metrology/Inspection/* Status Alpha-Step 500 *UP* Nanospec 2-Litho *UP* Nanospec 1-Etch *UP* P2 Profiler *UP* */Microscpoes-/* #1 Leica/ *UP* #2 Ergolux/Drytek2 *UP* #3 Olympus/Litho *UP* #4 Nikon Optiphot/Litho *UP* #5 Nikon/Litho *UP* #6 Leitz/Bosch *UP* #7 Leitz/Diffusion *UP* #8 Olympus/Litho *UP* #9Olympus/Litho *UP* */Miscellaneous/* Status EVBond *PROBLEM* New graphite on order ETA 8/9 3 KSBonder *UP* KSCoat *UP* Litho SRD *UP* Mask Cleaner *UP* -------------- next part -------------- An HTML attachment was scrubbed... URL: From gsosa at stanford.edu Wed Aug 10 07:25:08 2011 From: gsosa at stanford.edu (Gary Sosa) Date: Wed, 10 Aug 2011 07:25:08 -0700 Subject: Morning Litho status report 8/10 Message-ID: <4E4294C4.9080108@stanford.edu> Good morning All- Here is the morning Litho status report SVG Coat2- Problem reported with the HPO or Vapor Prime module. Vacuum break/start error. Will check out on morning rounds Note 1: There will be an ASML Stepper maintenance training class from 7/25 through 8/12. During certain parts of the day the stepper will be unavailable as the trainers will be using the tool for the "hands-on" portion of the training class. There will be a large group gathered around the stepper during this time and the area around the stepper will be blocked off to normal traffic. Please observe the barricades during this time period. We apologize for the inconvenience and thank you for your patience and understanding. Please check back in Coral for the latest tool updates and current equipment status. Thanks... The Litho Team */Photolithography Area Status/* */Wednesday, August 10, 2011/* */General Information / Lab Activities/* ASML 3 week training class in progress */Exposure Tools/**//* Status Comments Priority ASML Stepper *PROBLEM* Intermittent carrier inspection 2 EVAlign *UP* EVAlign2 *UP* EVG-Imprint *UP* Karl Suss 1 *UP* Karl Suss 2 *UP* */Manual Coaters/* Status EVGSpraycoat *UP* Headway *UP* Laurel *UP* */Coaters/* Process Status SVGCoat 3612 Process *Up* 3617 Process *Up* 220-7 Process *Up* SVGCoat2 3612 Process *Problem* Vapor Prime problem 1 955-0.7 Process *Up* 220-3 Process *Up* */Developers/* Status SVGDEV *UP* SVGDEV2 *UP* */Ovens / Hotplates/* Status BLUEM *UP* Blue M 90 C. *UP* Blue M 110 C *UP* Blue M 150 C *UP* Fusion *UP* UV-Cure *UP* White-Oven *UP* YES Vapor Prime *UP* */Hotplates- /* Laurel-left *UP* Laurel- right *UP* Headway *UP* Torrey Pines- left *UP* 90 Deg C *UP* 115 Deg C *UP* Torrey Pines- Right *UP* */Metrology/Inspection/* Status Alpha-Step 500 *UP* Nanospec 2-Litho *UP* Nanospec 1-Etch *UP* P2 Profiler *UP* */Microscpoes-/* #1 Leica/ *UP* #2 Ergolux/Drytek2 *UP* #3 Olympus/Litho *UP* #4 Nikon Optiphot/Litho *UP* #5 Nikon/Litho *UP* #6 Leitz/Bosch *UP* #7 Leitz/Diffusion *UP* #8 Olympus/Litho *UP* #9Olympus/Litho *UP* */Miscellaneous/* Status EVBond *PROBLEM* New graphite on order ETA 8/9 3 KSBonder *UP* KSCoat *UP* Litho SRD *UP* Mask Cleaner *UP* -------------- next part -------------- An HTML attachment was scrubbed... URL: From vilanova at stanford.edu Thu Aug 11 07:40:18 2011 From: vilanova at stanford.edu (Mario Vilanova) Date: Thu, 11 Aug 2011 07:40:18 -0700 Subject: Litho AM Daily Report 8/11/11 Message-ID: <4E43E9D2.6030406@stanford.edu> Good morning All- Here is the morning Litho status report Note 1: There will be an ASML Stepper maintenance training class from 7/25 through 8/12. During certain parts of the day the stepper will be unavailable as the trainers will be using the tool for the "hands-on" portion of the training class. There will be a large group gathered around the stepper during this time and the area around the stepper will be blocked off to normal traffic. Please observe the barricades during this time period. We apologize for the inconvenience and thank you for your patience and understanding. Please check back in Coral for the latest tool updates and current equipment status. Thanks... The Litho Team */Photolithography Area Status/* */Thursday, August 11, 2011/* */General Information / Lab Activities/* ASML 3 week training class in progress Gary Sosa, Out Today And Tomorrow */Exposure Tools/**//* Status Comments Priority ASML Stepper *PROBLEM* Intermittent carrier inspection 1 EVAlign *UP* EVAlign2 *UP* EVG-Imprint *UP* Karl Suss 1 *UP* Karl Suss 2 *UP* */Manual Coaters/* Status EVGSpraycoat *UP* Headway *UP* Laurel *UP* */Coaters/* Process Status SVGCoat 3612 Process *Up* 3617 Process *Up* 220-7 Process *Up* SVGCoat2 3612 Process *Up * 955-0.7 Process *Up* 220-3 Process *Up* */Developers/* Status SVGDEV *UP* SVGDEV2 *UP* */Ovens / Hotplates/* Status BLUEM *UP* Blue M 90 C. *UP* Blue M 110 C *UP* Blue M 150 C *UP* Fusion *UP* UV-Cure *UP* White-Oven *UP* YES Vapor Prime *UP* */Hotplates- /* Laurel-left *UP* Laurel- right *UP* Headway *UP* Torrey Pines- left *UP* 90 Deg C *UP* 115 Deg C *UP* Torrey Pines- Right *UP* */Metrology/Inspection/* Status Alpha-Step 500 *UP* Nanospec 2-Litho *UP* Nanospec 1-Etch *UP* P2 Profiler *UP* */Microscpoes-/* #1 Leica/ *UP* #2 Ergolux/Drytek2 *UP* #3 Olympus/Litho *UP* #4 Nikon Optiphot/Litho *UP* #5 Nikon/Litho *UP* #6 Leitz/Bosch *UP* #7 Leitz/Diffusion *UP* #8 Olympus/Litho *UP* #9Olympus/Litho *UP* */Miscellaneous/* Status EVBond *PROBLEM* New graphite on order ETA 8/9 2 KSBonder *UP* KSCoat *UP* Litho SRD *UP* Mask Cleaner *UP* -------------- next part -------------- An HTML attachment was scrubbed... URL: From vilanova at stanford.edu Fri Aug 12 08:02:44 2011 From: vilanova at stanford.edu (Mario Vilanova) Date: Fri, 12 Aug 2011 08:02:44 -0700 Subject: Litho AM Daily Report 8/12/11 Message-ID: <4E454094.9070504@stanford.edu> Good morning All- Here is the morning Litho status report Note 1: There will be an ASML Stepper maintenance training class from 7/25 through 8/12. During certain parts of the day the stepper will be unavailable as the trainers will be using the tool for the "hands-on" portion of the training class. There will be a large group gathered around the stepper during this time and the area around the stepper will be blocked off to normal traffic. Please observe the barricades during this time period. We apologize for the inconvenience and thank you for your patience and understanding. Please check back in Coral for the latest tool updates and current equipment status. Thanks... The Litho Team */Photolithography Area Status/* */Thursday, August 12, 2011/* */General Information / Lab Activities/* ASML 3 week training class in progress Gary Sosa, Out Today.- */Exposure Tools/**//* Status Comments Priority ASML Stepper *PROBLEM* Intermittent carrier inspection 1 EVAlign *UP* EVAlign2 *UP* EVG-Imprint *UP* Karl Suss 1 *UP* Karl Suss 2 *UP* */Manual Coaters/* Status EVGSpraycoat *UP* Headway *UP* Laurel *UP* */Coaters/* Process Status SVGCoat 3612 Process *Up* 3617 Process *Up* 220-7 Process *Up* SVGCoat2 3612 Process *Up * 955-0.7 Process *Up* 220-3 Process *Up* */Developers/* Status SVGDEV *UP* SVGDEV2 *UP* */Ovens / Hotplates/* Status BLUEM *UP* Blue M 90 C. *UP* Blue M 110 C *UP* Blue M 150 C *UP* Fusion *UP* UV-Cure *UP* White-Oven *UP* YES Vapor Prime *UP* */Hotplates- /* Laurel-left *UP* Laurel- right *UP* Headway *UP* Torrey Pines- left *UP* 90 Deg C *UP* 115 Deg C *UP* Torrey Pines- Right *UP* */Metrology/Inspection/* Status Alpha-Step 500 *UP* Nanospec 2-Litho *UP* Nanospec 1-Etch *UP* P2 Profiler *UP* */Microscpoes-/* #1 Leica/ *UP* #2 Ergolux/Drytek2 *UP* #3 Olympus/Litho *UP* #4 Nikon Optiphot/Litho *UP* #5 Nikon/Litho *UP* #6 Leitz/Bosch *UP* #7 Leitz/Diffusion *UP* #8 Olympus/Litho *UP* #9Olympus/Litho *UP* */Miscellaneous/* Status EVBond *PROBLEM* New graphite on order ETA 8/9 2 KSBonder *UP* KSCoat *UP* Litho SRD *UP* Mask Cleaner *UP* -------------- next part -------------- An HTML attachment was scrubbed... URL: From gsosa at stanford.edu Mon Aug 15 07:44:09 2011 From: gsosa at stanford.edu (Gary Sosa) Date: Mon, 15 Aug 2011 07:44:09 -0700 Subject: Morning Litho status report 8/15 Message-ID: <4E4930B9.2000907@stanford.edu> Good morning All... Here is the morning Litho status report. SVG Coat 1- User reports that the temperature on the hotplate is fluctuating. will check out on morning rounds Karl Suss Aligner 2- User reports a Z axis mechanical reset problem. Will check out on morning rounds. Please check back in Coral for latest tool updates and current equipment status. Thanks.... The Litho Team */Photolithography Area Status/* */Monday, August 15, 2011/* */General Information / Lab Activities/* */Exposure Tools/**//* Status Comments Priority ASML Stepper *PROBLEM* Intermittent carrier inspection 3 EVAlign *UP* EVAlign2 *UP* EVG-Imprint *UP* Karl Suss 1 *UP* Karl Suss 2 *PROBLEM* WEC Z axis problem 1 */Manual Coaters/* Status EVGSpraycoat *UP* Headway *UP* Laurel *UP* */Coaters/* Process Status SVGCoat 3612 Process *Problem* Temperature fluctuation 2 3617 Process *Up* 220-7 Process *Up* SVGCoat2 3612 Process *Up* 955-0.7 Process *Up* 220-3 Process *Up* */Developers/* Status SVGDEV *UP* SVGDEV2 *UP* */Ovens / Hotplates/* Status BLUEM *UP* Blue M 90 C. *UP* Blue M 110 C *UP* Blue M 150 C *UP* Fusion *UP* UV-Cure *UP* White-Oven *UP* YES Vapor Prime *UP* */Hotplates- /* Laurel-left *UP* Laurel- right *UP* Headway *UP* Torrey Pines- left *UP* 90 Deg C *UP* 115 Deg C *UP* Torrey Pines- Right *UP* */Metrology/Inspection/* Status Alpha-Step 500 *UP* Nanospec 2-Litho *UP* Nanospec 1-Etch *UP* P2 Profiler *UP* */Microscpoes-/* #1 Leica/ *UP* #2 Ergolux/Drytek2 *UP* #3 Olympus/Litho *UP* #4 Nikon Optiphot/Litho *UP* #5 Nikon/Litho *UP* #6 Leitz/Bosch *UP* #7 Leitz/Diffusion *UP* #8 Olympus/Litho *UP* #9Olympus/Litho *UP* */Miscellaneous/* Status EVBond *UP* KSBonder *UP* KSCoat *UP* Litho SRD *UP* Mask Cleaner *UP* -------------- next part -------------- An HTML attachment was scrubbed... URL: From gsosa at stanford.edu Tue Aug 16 07:44:59 2011 From: gsosa at stanford.edu (Gary Sosa) Date: Tue, 16 Aug 2011 07:44:59 -0700 Subject: Morning Litho status report 8/16 Message-ID: <4E4A826B.1020203@stanford.edu> Good morning All...... Here is the morning Litho status report. SVG Coat 2- User reports uneven resist coverage on 3612 reisist. Will check out on morning rounds. Please check back in Coral for latest tool updates and current equipment status. Thanks.... The Litho Team */Photolithography Area Status/* */Tuesday, August 16, 2011/* */General Information / Lab Activities/* Mahnaz- Out today */Exposure Tools/**//* Status Comments Priority ASML Stepper *PROBLEM* Intermittent carrier inspection 2 EVAlign *UP* EVAlign2 *UP* EVG-Imprint *UP* Karl Suss 1 *UP* Karl Suss 2 *UP* */Manual Coaters/* Status EVGSpraycoat *UP* Headway *UP* Laurel *UP* */Coaters/* Process Status SVGCoat 3612 Process *Up* 3617 Process *Up* 220-7 Process *Up* SVGCoat2 3612 Process *Problem* Uneven coating 1 955-0.7 Process *Up* 220-3 Process *Up* */Developers/* Status SVGDEV *UP* SVGDEV2 *UP* */Ovens / Hotplates/* Status BLUEM *UP* Blue M 90 C. *UP* Blue M 110 C *UP* Blue M 150 C *UP* Fusion *UP* UV-Cure *UP* White-Oven *UP* YES Vapor Prime *UP* */Hotplates- /* Laurel-left *UP* Laurel- right *UP* Headway *UP* Torrey Pines- left *UP* 90 Deg C *UP* 115 Deg C *UP* Torrey Pines- Right *UP* */Metrology/Inspection/* Status Alpha-Step 500 *UP* Nanospec 2-Litho *UP* Nanospec 1-Etch *UP* P2 Profiler *UP* */Microscpoes-/* #1 Leica/ *UP* #2 Ergolux/Drytek2 *UP* #3 Olympus/Litho *UP* #4 Nikon Optiphot/Litho *UP* #5 Nikon/Litho *UP* #6 Leitz/Bosch *UP* #7 Leitz/Diffusion *UP* #8 Olympus/Litho *UP* #9Olympus/Litho *UP* */Miscellaneous/* Status EVBond *UP* KSBonder *UP* KSCoat *UP* Litho SRD *UP* Mask Cleaner *UP* -------------- next part -------------- An HTML attachment was scrubbed... URL: From gsosa at stanford.edu Wed Aug 17 07:35:50 2011 From: gsosa at stanford.edu (Gary Sosa) Date: Wed, 17 Aug 2011 07:35:50 -0700 Subject: Morning Litho status report 8/17 Message-ID: <4E4BD1C6.5000206@stanford.edu> Good morning All.... Here is the morning Litho status report: No new problems or issues reported overnight Please check back in Coral for latest tool updates and current equipment status. Thanks.... The Litho Team */Photolithography Area Status/* */Wednesday, August 17, 2011/* */General Information / Lab Activities/* */Exposure Tools/**//* Status Comments Priority ASML Stepper *PROBLEM* Intermittent carrier inspection 1 EVAlign *UP* EVAlign2 *UP* EVG-Imprint *UP* Karl Suss 1 *UP* Karl Suss 2 *UP* */Manual Coaters/* Status EVGSpraycoat *UP* Headway *UP* Laurel *UP* */Coaters/* Process Status SVGCoat 3612 Process *Up* 3617 Process *Up* 220-7 Process *Up* SVGCoat2 3612 Process *Up* 955-0.7 Process *Up* 220-3 Process *Up* */Developers/* Status SVGDEV *UP* SVGDEV2 *UP* */Ovens / Hotplates/* Status BLUEM *UP* Blue M 90 C. *UP* Blue M 110 C *UP* Blue M 150 C *UP* Fusion *UP* UV-Cure *UP* White-Oven *UP* YES Vapor Prime *UP* */Hotplates- /* Laurel-left *UP* Laurel- right *UP* Headway *UP* Torrey Pines- left *UP* 90 Deg C *UP* 115 Deg C *UP* Torrey Pines- Right *UP* */Metrology/Inspection/* Status Alpha-Step 500 *UP* Nanospec 2-Litho *UP* Nanospec 1-Etch *UP* P2 Profiler *UP* */Microscpoes-/* #1 Leica/ *UP* #2 Ergolux/Drytek2 *UP* #3 Olympus/Litho *UP* #4 Nikon Optiphot/Litho *UP* #5 Nikon/Litho *UP* #6 Leitz/Bosch *UP* #7 Leitz/Diffusion *UP* #8 Olympus/Litho *UP* #9Olympus/Litho *UP* */Miscellaneous/* Status EVBond *UP* KSBonder *UP* KSCoat *UP* Litho SRD *UP* Mask Cleaner *UP* -------------- next part -------------- An HTML attachment was scrubbed... URL: From gsosa at stanford.edu Thu Aug 18 07:08:13 2011 From: gsosa at stanford.edu (Gary Sosa) Date: Thu, 18 Aug 2011 07:08:13 -0700 Subject: Morning Litho status report 8/18 Message-ID: <4E4D1CCD.5080602@stanford.edu> Good morning All.... Here is the morning Litho status report. No new problems or issues reported overnight. Please check back in Coral for the latest tool updates and current equipment status. Thanks .. The Litho Team */Photolithography Area Status/* */Thursday, August 18, 2011/* */General Information / Lab Activities/* Gary- CPR/1st Aid training 8:00AM - 2:00PM */Exposure Tools/**//* Status Comments Priority ASML Stepper *PROBLEM* Intermittent carrier inspection 1 EVAlign *UP* EVAlign2 *UP* EVG-Imprint *UP* Karl Suss 1 *UP* Karl Suss 2 *UP* */Manual Coaters/* Status EVGSpraycoat *UP* Headway *UP* Laurel *UP* */Coaters/* Process Status SVGCoat 3612 Process *Up* 3617 Process *Up* 220-7 Process *Up* SVGCoat2 3612 Process *Up* 955-0.7 Process *Up* 220-3 Process *Up* */Developers/* Status SVGDEV *UP* SVGDEV2 *UP* */Ovens / Hotplates/* Status BLUEM *UP* Blue M 90 C. *UP* Blue M 110 C *UP* Blue M 150 C *UP* Fusion *UP* UV-Cure *UP* White-Oven *UP* YES Vapor Prime *UP* */Hotplates- /* Laurel-left *UP* Laurel- right *UP* Headway *UP* Torrey Pines- left *UP* 90 Deg C *UP* 115 Deg C *UP* Torrey Pines- Right *UP* */Metrology/Inspection/* Status Alpha-Step 500 *UP* Nanospec 2-Litho *UP* Nanospec 1-Etch *UP* P2 Profiler *UP* */Microscpoes-/* #1 Leica/ *UP* #2 Ergolux/Drytek2 *UP* #3 Olympus/Litho *UP* #4 Nikon Optiphot/Litho *UP* #5 Nikon/Litho *UP* #6 Leitz/Bosch *UP* #7 Leitz/Diffusion *UP* #8 Olympus/Litho *UP* #9Olympus/Litho *UP* */Miscellaneous/* Status EVBond *UP* KSBonder *UP* KSCoat *UP* Litho SRD *UP* Mask Cleaner *UP* -------------- next part -------------- An HTML attachment was scrubbed... URL: From gsosa at stanford.edu Fri Aug 19 07:26:05 2011 From: gsosa at stanford.edu (Gary Sosa) Date: Fri, 19 Aug 2011 07:26:05 -0700 Subject: Morning Litho status report 8/19 Message-ID: <4E4E727D.5030305@stanford.edu> Good morning All.... Here is the morning Litho status report: Karl Suss Aligner 2- User reports a "Current Overload" error and tool will not reset. Will check out on morning rounds Headway Spinner- User reports the chuck is not spinning. Will investigate on morning rounds. Yes Oven- User reports a "P-Fail" error. Will check out on morning rounds Please check back in Coral for latest tool updates and current equipment status. Thanks... The Litho Team */Photolithography Area Status/* */Friday, August 19, 2011/* */General Information / Lab Activities/* */Exposure Tools/**//* Status Comments Priority ASML Stepper *PROBLEM* Intermittent carrier inspection 4 EVAlign *UP* EVAlign2 *UP* EVG-Imprint *UP* Karl Suss 1 *UP* Karl Suss 2 *PROBLEM* "Current Overload" Error 3 */Manual Coaters/* Status EVGSpraycoat *UP* Headway *PROBLEM* Not spinning 2 Laurel *UP* */Coaters/* Process Status SVGCoat 3612 Process *Up* 3617 Process *Up* 220-7 Process *Up* SVGCoat2 3612 Process *Up* 955-0.7 Process *Up* 220-3 Process *Up* */Developers/* Status SVGDEV *UP* SVGDEV2 *UP* */Ovens / Hotplates/* Status BLUEM *UP* Blue M 90 C. *UP* Blue M 110 C *UP* Blue M 150 C *UP* Fusion *UP* UV-Cure *UP* White-Oven *UP* YES Vapor Prime *PROBLEM* "P-Fail" Error 1 */Hotplates- /* Laurel-left *UP* Laurel- right *UP* Headway *UP* Torrey Pines- left *UP* 90 Deg C *UP* 115 Deg C *UP* Torrey Pines- Right *UP* */Metrology/Inspection/* Status Alpha-Step 500 *UP* Nanospec 2-Litho *UP* Nanospec 1-Etch *UP* P2 Profiler *UP* */Microscpoes-/* #1 Leica/ *UP* #2 Ergolux/Drytek2 *UP* #3 Olympus/Litho *UP* #4 Nikon Optiphot/Litho *UP* #5 Nikon/Litho *UP* #6 Leitz/Bosch *UP* #7 Leitz/Diffusion *UP* #8 Olympus/Litho *UP* #9Olympus/Litho *UP* */Miscellaneous/* Status EVBond *UP* KSBonder *UP* KSCoat *UP* Litho SRD *UP* Mask Cleaner *UP* -------------- next part -------------- An HTML attachment was scrubbed... URL: From gsosa at stanford.edu Mon Aug 22 07:48:39 2011 From: gsosa at stanford.edu (Gary Sosa) Date: Mon, 22 Aug 2011 07:48:39 -0700 Subject: Morning Litho status report 8/22 Message-ID: <4E526C47.3000703@stanford.edu> Good morning All..... Here is the Litho morning status report. Please check back in Coral for latest tool updates and current equipment status. Thanks... The Litho Team */Photolithography Quick Snapshot/* */Monday, August 22, 2011/* */_Reported Problems_/* SVG Coat 2- User reports a wafer transfer problem. Will check out on morning rounds */_Problem Updates ( > 24 Hrs )_/* */Photolithography Area Status/* */Monday, August 22, 2011/* */General Information / Lab Activities/* */Exposure Tools/**//* Status Comments Priority ASML Stepper *PROBLEM* Intermittent carrier inspection 2 EVAlign *UP* EVAlign2 *UP* EVG-Imprint *UP* Karl Suss 1 *UP* Karl Suss 2 *UP* */Manual Coaters/* Status EVGSpraycoat *UP* Headway *UP* Laurel *UP* */Coaters/* Process Status SVGCoat 3612 Process *Problem* Wafer transfer problem 1 3617 Process *Up* 220-7 Process *Up* SVGCoat2 3612 Process *Up* 955-0.7 Process *Up* 220-3 Process *Up* */Developers/* Status SVGDEV *UP* SVGDEV2 *UP* */Ovens / Hotplates/* Status BLUEM *UP* Blue M 90 C. *UP* Blue M 110 C *UP* Blue M 150 C *UP* Fusion *UP* UV-Cure *UP* White-Oven *UP* YES Vapor Prime *UP* */Hotplates- /* Laurel-left *UP* Laurel- right *UP* Headway *UP* Torrey Pines- left *UP* 90 Deg C *UP* 115 Deg C *UP* Torrey Pines- Right *UP* */Metrology/Inspection/* Status Alpha-Step 500 *UP* Nanospec 2-Litho *UP* Nanospec 1-Etch *UP* P2 Profiler *UP* */Microscpoes-/* #1 Leica/ *UP* #2 Ergolux/Drytek2 *UP* #3 Olympus/Litho *UP* #4 Nikon Optiphot/Litho *UP* #5 Nikon/Litho *UP* #6 Leitz/Bosch *UP* #7 Leitz/Diffusion *UP* #8 Olympus/Litho *UP* #9Olympus/Litho *UP* */Miscellaneous/* Status EVBond *UP* KSBonder *UP* KSCoat *UP* Litho SRD *UP* Mask Cleaner *UP* -------------- next part -------------- An HTML attachment was scrubbed... URL: From gsosa at stanford.edu Tue Aug 23 07:58:34 2011 From: gsosa at stanford.edu (Gary Sosa) Date: Tue, 23 Aug 2011 07:58:34 -0700 Subject: Morning Litho status report Message-ID: <4E53C01A.4040306@stanford.edu> Good morning All.... Here is the morning Litho status report: *Important Notice- Please Read!!!*- Tomorrow(8/24), beginning at 7:00AM, the facilities group and AGC will be conducting an experiment on the humidifiers that provide conditioned air to the Litho area. They are going to raise the humidity set-point of the litho room until the humidifiers are running at 50% at which point they will take some measurements in the duct-work. Once the experiment is completed, the settings will be returned to normal and the room will begin stabilizing. We anticipate that this test will take at lease 4 hours to complete but actual recovery time is unknown. As a precaution, we will be shutting down the ASML Stepper until normal humidity control is restored. Also, it is advised that users with critical work, refrain from litho processing during this time. If your work is non-critical, please run a test wafer before committing all of your work to verify your process. Staff members will be available to assess the lab conditions and to provide information and guidance. Thanks in advance for your patience and understanding, and sorry for the inconveinience. Please check back in Coral for the latest tool updates and current equipment status. Thanks... The Litho Team */Photolithography Quick Snapshot/* */Tuesday, August 23, 2011/* */_Reported Problems_/* Laurael Spinner- Low vacuum on pieces chuck only. Whole wafer chuck vacuum OK. Need to troubleshoot. */_Problem Updates ( > 24 Hrs )_/* */Photolithography Area Status/* */Tuesday, August 23, 2011/* */General Information / Lab Activities/* */Exposure Tools/**//* Status Comments Priority ASML Stepper *PROBLEM* Intermittent carrier inspection 2 EVAlign *UP* EVAlign2 *UP* EVG-Imprint *UP* Karl Suss 1 *UP* Karl Suss 2 *UP* */Manual Coaters/* Status EVGSpraycoat *UP* Headway *UP* Laurel *PROBLEM* Low vacuum on pieces chuck 1 */Coaters/* Process Status SVGCoat 3612 Process *Up* 3617 Process *Up* 220-7 Process *Up* SVGCoat2 3612 Process *Up* 955-0.7 Process *Up* 220-3 Process *Up* */Developers/* Status SVGDEV *UP* SVGDEV2 *UP* */Ovens / Hotplates/* Status BLUEM *UP* Blue M 90 C. *UP* Blue M 110 C *UP* Blue M 150 C *UP* Fusion *UP* UV-Cure *UP* White-Oven *UP* YES Vapor Prime *UP* */Hotplates- /* Laurel-left *UP* Laurel- right *UP* Headway *UP* Torrey Pines- left *UP* 90 Deg C *UP* 115 Deg C *UP* Torrey Pines- Right *UP* */Metrology/Inspection/* Status Alpha-Step 500 *UP* Nanospec 2-Litho *UP* Nanospec 1-Etch *UP* P2 Profiler *UP* */Microscpoes-/* #1 Leica/ *UP* #2 Ergolux/Drytek2 *UP* #3 Olympus/Litho *UP* #4 Nikon Optiphot/Litho *UP* #5 Nikon/Litho *UP* #6 Leitz/Bosch *UP* #7 Leitz/Diffusion *UP* #8 Olympus/Litho *UP* #9Olympus/Litho *UP* */Miscellaneous/* Status EVBond *UP* KSBonder *UP* KSCoat *UP* Litho SRD *UP* Mask Cleaner *UP* -------------- next part -------------- An HTML attachment was scrubbed... URL: From gsosa at stanford.edu Wed Aug 24 08:38:35 2011 From: gsosa at stanford.edu (Gary Sosa) Date: Wed, 24 Aug 2011 08:38:35 -0700 Subject: Morning Litho status report 8/24 Message-ID: <4E551AFB.3030609@stanford.edu> Good morning All.... Here is the morning Litho status report: *Important Notice- Please Read!!!*- Today(8/24), beginning at 7:00AM, the facilities group and AGC will be conducting an experiment on the humidifiers that provide conditioned air to the Litho area. They are going to raise the humidity set-point of the litho room until the humidifiers are running at 50% at which point they will take some measurements in the duct-work. Once the experiment is completed, the settings will be returned to normal and the room will begin stabilizing. We anticipate that this test will take at lease 4 hours to complete but actual recovery time is unknown. As a precaution, we will be shutting down the ASML Stepper until normal humidity control is restored. Also, it is advised that users with critical work, refrain from litho processing during this time. If your work is non-critical, please run a test wafer before committing all of your work to verify your process. Staff members will be available to assess the lab conditions and to provide information and guidance. Thanks in advance for your patience and understanding, and sorry for the inconveinience. Please check back in Coral for the latest tool updates and current equipment status. Thanks... The Litho Team */Photolithography Quick Snapshot/* */Wednesday, August 24, 2011/* */_Reported Problems_/* ASML Stepper: Down- Wafer stuck in system. Users wafer recovered. Cleaned the Dipod and tested the system before shutting down for humidity experiment- All OK. */_Problem Updates ( > 24 Hrs )_/* */Photolithography Area Status/* */Wednesday, August 24, 2011/* */General Information / Lab Activities/* ASML Stepper shutdown during humidity experiment */Exposure Tools/**//* Status Comments Priority ASML Stepper *DOWN* Litho humidity experiment 1 EVAlign *UP* EVAlign2 *UP* EVG-Imprint *UP* Karl Suss 1 *UP* Karl Suss 2 *UP* */Manual Coaters/* Status EVGSpraycoat *UP* Headway *UP* Laurel *UP* */Coaters/* Process Status SVGCoat 3612 Process *Up* 3617 Process *Up* 220-7 Process *Up* SVGCoat2 3612 Process *Up* 955-0.7 Process *Up* 220-3 Process *Up* */Developers/* Status SVGDEV *UP* SVGDEV2 *UP* */Ovens / Hotplates/* Status BLUEM *UP* Blue M 90 C. *UP* Blue M 110 C *UP* Blue M 150 C *UP* Fusion *UP* UV-Cure *UP* White-Oven *UP* YES Vapor Prime *UP* */Hotplates- /* Laurel-left *UP* Laurel- right *UP* Headway *UP* Torrey Pines- left *UP* 90 Deg C *UP* 115 Deg C *UP* Torrey Pines- Right *UP* */Metrology/Inspection/* Status Alpha-Step 500 *UP* Nanospec 2-Litho *UP* Nanospec 1-Etch *UP* P2 Profiler *UP* */Microscpoes-/* #1 Leica/ *UP* #2 Ergolux/Drytek2 *UP* #3 Olympus/Litho *UP* #4 Nikon Optiphot/Litho *UP* #5 Nikon/Litho *UP* #6 Leitz/Bosch *UP* #7 Leitz/Diffusion *UP* #8 Olympus/Litho *UP* #9Olympus/Litho *UP* */Miscellaneous/* Status EVBond *UP* KSBonder *UP* KSCoat *UP* Litho SRD *UP* Mask Cleaner *UP* -------------- next part -------------- An HTML attachment was scrubbed... URL: From gsosa at stanford.edu Thu Aug 25 07:52:22 2011 From: gsosa at stanford.edu (Gary Sosa) Date: Thu, 25 Aug 2011 07:52:22 -0700 Subject: Morning Litho status report 8/25 Message-ID: <4E5661A6.7000605@stanford.edu> Good morning All..... Here is the morning Litho status report. Please check back in Coral for latest tool updates and current equipment status. Thanks.... The Litho Team */Photolithography Quick Snapshot/* */Thursday, August 25, 2011/* */_Reported Problems_/* Yes Oven: Down. No program steps. Needs reprogramming SVG Coat 1: Problem, User reports poor spin on 220-7 process SVG Coat 2: Problem. User reports non-uniform coating on 3612 1.0um process SVG Dev 2: Problem. User reports that proram 3 is bad */_Problem Updates ( > 24 Hrs )_/* EVG Bonder: Down.The turbo pump is bad. Sending turbo pump out today for repair. Estimated repair time is 3 - 5 days */Photolithography Area Status/* */Thursday, August 25, 2011/* */General Information / Lab Activities/* */Exposure Tools/**//* Status Comments Priority ASML Stepper *PROBLEM* Intermittent carrier inspection 6 EVAlign *UP* EVAlign2 *UP* EVG-Imprint *UP* Karl Suss 1 *UP* Karl Suss 2 *UP* */Manual Coaters/* Status EVGSpraycoat *UP* Headway *UP* Laurel *UP* */Coaters/* Process Status SVGCoat 3612 Process *Up* 3617 Process *Up* 220-7 Process *Problem* Poor spin 2 SVGCoat2 3612 Process *Problem* Non-uniform coating 3 955-0.7 Process *Up* 220-3 Process *Up* */Developers/* Status SVGDEV *UP* SVGDEV2 *PROBLEM* Program problem 5 */Ovens / Hotplates/* Status BLUEM *UP* Blue M 90 C. *UP* Blue M 110 C *UP* Blue M 150 C *UP* Fusion *UP* UV-Cure *UP* White-Oven *UP* YES Vapor Prime *DOWN* Lost program 1 */Hotplates- /* Laurel-left *UP* Laurel- right *UP* Headway *UP* Torrey Pines- left *UP* 90 Deg C *UP* 115 Deg C *UP* Torrey Pines- Right *UP* */Metrology/Inspection/* Status Alpha-Step 500 *UP* Nanospec 2-Litho *UP* Nanospec 1-Etch *UP* P2 Profiler *UP* */Microscpoes-/* #1 Leica/ *UP* #2 Ergolux/Drytek2 *UP* #3 Olympus/Litho *UP* #4 Nikon Optiphot/Litho *UP* #5 Nikon/Litho *UP* #6 Leitz/Bosch *UP* #7 Leitz/Diffusion *UP* #8 Olympus/Litho *UP* #9Olympus/Litho *UP* */Miscellaneous/* Status EVBond *DOWN* Dead turbo pump 4 KSBonder *UP* KSCoat *UP* Litho SRD *UP* Mask Cleaner *UP* -------------- next part -------------- An HTML attachment was scrubbed... URL: From gsosa at stanford.edu Fri Aug 26 07:39:14 2011 From: gsosa at stanford.edu (Gary Sosa) Date: Fri, 26 Aug 2011 07:39:14 -0700 Subject: Morning Litho status report 8/26 Message-ID: <4E57B012.7070403@stanford.edu> Good morning All.... Here is the morning Litho status report Please check back in Coral for latest tool updates and current equipment status. Thanks... The Litho Team */Photolithography Quick Snapshot/* */Friday, August 26, 2011/* */_Reported Problems_/* EVAlign: Down- User reports that system will not initialize and WEC not moving properly SVG Coat 2- Problem: User reports that receive indexer not working correctly. */_Problem Updates ( > 24 Hrs )_/* EVG Bonder: Down.The turbo pump is bad. Turbo pump has been shipped out yesterday. Estimated delivery to vendor-8/26. Estimated time to repair: 3 - 5 days */Photolithography Area Status/* */Friday, August 26, 2011/* */General Information / Lab Activities/* */Exposure Tools/**//* Status Comments Priority ASML Stepper *PROBLEM* Intermittent carrier inspection 4 EVAlign *DOWN* Won't Initialize 1 EVAlign2 *UP* EVG-Imprint *UP* Karl Suss 1 *UP* Karl Suss 2 *UP* */Manual Coaters/* Status EVGSpraycoat *UP* Headway *UP* Laurel *UP* */Coaters/* Process Status SVGCoat 3612 Process *Up* 3617 Process *Up* 220-7 Process *Up* SVGCoat2 3612 Process *Problem* Receiver problem 2 955-0.7 Process *Up* 220-3 Process *Up* */Developers/* Status SVGDEV *UP* SVGDEV2 *UP* */Ovens / Hotplates/* Status BLUEM *UP* Blue M 90 C. *UP* Blue M 110 C *UP* Blue M 150 C *UP* Fusion *UP* UV-Cure *UP* White-Oven *UP* YES Vapor Prime *UP* */Hotplates- /* Laurel-left *UP* Laurel- right *UP* Headway *UP* Torrey Pines- left *UP* 90 Deg C *UP* 115 Deg C *UP* Torrey Pines- Right *UP* */Metrology/Inspection/* Status Alpha-Step 500 *UP* Nanospec 2-Litho *UP* Nanospec 1-Etch *UP* P2 Profiler *UP* */Microscpoes-/* #1 Leica/ *UP* #2 Ergolux/Drytek2 *UP* #3 Olympus/Litho *UP* #4 Nikon Optiphot/Litho *UP* #5 Nikon/Litho *UP* #6 Leitz/Bosch *UP* #7 Leitz/Diffusion *UP* #8 Olympus/Litho *UP* #9Olympus/Litho *UP* */Miscellaneous/* Status EVBond *DOWN* Dead turbo pump 3 KSBonder *UP* KSCoat *UP* Litho SRD *UP* Mask Cleaner *UP* -------------- next part -------------- An HTML attachment was scrubbed... URL: From gsosa at stanford.edu Mon Aug 29 07:53:35 2011 From: gsosa at stanford.edu (Gary Sosa) Date: Mon, 29 Aug 2011 07:53:35 -0700 Subject: Morning Litho status report 8/29 Message-ID: <4E5BA7EF.5010701@stanford.edu> Good morning All.... Here is the morning Litho status report Please check back in Coral for latest tool updates and current equipment status. Thanks..... The Litho Team */Photolithography Quick Snapshot/* */Monday, August 29, 2011/* */_Reported Problems_/* EVAlign: Down- User reports that mask will not unload from system */_Problem Updates ( > 24 Hrs )_/* EVG Bonder: Down.The turbo pump is bad. Turbo pump is at vendor being repaired as of 8/26. Estimatedtime to repair: 3 - 5 days */Photolithography Area Status/* */Monday, August 29, 2011/* */General Information / Lab Activities/* Mahnaz- Out at 1:45PM */Exposure Tools/**//* Status Comments Priority ASML Stepper *PROBLEM*** Intermittent carrier inspection 3 EVAlign *DOWN* Mask won't unload 1 EVAlign2 *UP* EVG-Imprint *UP* Karl Suss 1 *UP* Karl Suss 2 *UP* */Manual Coaters/* Status EVGSpraycoat *UP* Headway *UP* Laurel *UP* */Coaters/* Process Status SVGCoat 3612 Process *Up* 3617 Process *Up* 220-7 Process *Up* SVGCoat2 3612 Process *Up* 955-0.7 Process *Up* 220-3 Process *Up* */Developers/* Status SVGDEV *UP* SVGDEV2 *UP* */Ovens / Hotplates/* Status BLUEM *UP* Blue M 90 C. *UP* Blue M 110 C *UP* Blue M 150 C *UP* Fusion *UP* UV-Cure *UP* White-Oven *UP* YES Vapor Prime *UP* */Hotplates- /* Laurel-left *UP* Laurel- right *UP* Headway *UP* Torrey Pines- left *UP* 90 Deg C *UP* 115 Deg C *UP* Torrey Pines- Right *UP* */Metrology/Inspection/* Status Alpha-Step 500 *UP* Nanospec 2-Litho *UP* Nanospec 1-Etch *UP* P2 Profiler *UP* */Microscpoes-/* #1 Leica/ *UP* #2 Ergolux/Drytek2 *UP* #3 Olympus/Litho *UP* #4 Nikon Optiphot/Litho *UP* #5 Nikon/Litho *UP* #6 Leitz/Bosch *UP* #7 Leitz/Diffusion *UP* #8 Olympus/Litho *UP* #9Olympus/Litho *UP* */Miscellaneous/* Status EVBond *DOWN* Dead turbo pump 2 KSBonder *UP* KSCoat *UP* Litho SRD *UP* Mask Cleaner *UP* -------------- next part -------------- An HTML attachment was scrubbed... URL: From gsosa at stanford.edu Tue Aug 30 07:34:52 2011 From: gsosa at stanford.edu (Gary J Sosa) Date: Tue, 30 Aug 2011 07:34:52 -0700 (PDT) Subject: Morning Litho status report 8/30 In-Reply-To: <8fa5cb39-65ce-499f-9b65-7c691d8a9006@Gary-PC> Message-ID: <1f686059-612b-48ee-9149-c4235ae50d86@Gary-PC> Good morning All.... Here is the morning Litho status report Please check back in Coral for latest tool updates and current equipment status. Thanks... The Litho Team Photolithography Quick Snapshot Tuesday, August 30, 2011 Reported Problems None Problem Updates ( > 24 Hrs ) EVG Bonder: Down.The turbo pump is bad. Turbo pump is at vendor being repaired as of 8/26. Estimated time to repair: 3 - 5 days Photolithography Area Status Tuesday, August 30, 2011 General Information / Lab Activities Exposure Tools Status Comments Priority ASML Stepper PROBLEM Intermittent carrier inspection 2 EVAlign UP EVAlign2 UP EVG-Imprint UP Karl Suss 1 UP Karl Suss 2 UP Manual Coaters Status EVGSpraycoat UP Headway UP Laurel UP Coaters Process Status SVGCoat 3612 Process Up 3617 Process Up 220-7 Process Up SVGCoat2 3612 Process Up 955-0.7 Process Up 220-3 Process Up Developers Status SVGDEV UP SVGDEV2 UP Ovens / Hotplates Status BLUEM UP Blue M 90 C. UP Blue M 110 C UP Blue M 150 C UP Fusion UP UV-Cure UP White-Oven UP YES Vapor Prime UP Hotplates- Laurel-left UP Laurel- right UP Headway UP Torrey Pines- left UP 90 Deg C UP 115 Deg C UP Torrey Pines- Right UP Metrology/Inspection Status Alpha-Step 500 UP Nanospec 2-Litho UP Nanospec 1-Etch UP P2 Profiler UP Microscpoes- #1 Leica/ UP #2 Ergolux/Drytek2 UP #3 Olympus/Litho UP #4 Nikon Optiphot/Litho UP #5 Nikon/Litho UP #6 Leitz/Bosch UP #7 Leitz/Diffusion UP #8 Olympus/Litho UP #9Olympus/Litho UP Miscellaneous Status EVBond DOWN Dead turbo pump 1 KSBonder UP KSCoat UP Litho SRD UP Mask Cleaner UP -------------- next part -------------- An HTML attachment was scrubbed... URL: From gsosa at stanford.edu Wed Aug 31 07:30:28 2011 From: gsosa at stanford.edu (Gary J Sosa) Date: Wed, 31 Aug 2011 07:30:28 -0700 (PDT) Subject: Morning Litho status report 8/31 In-Reply-To: <76777102-a20a-42f2-891d-32c72b3fd131@Gary-PC> Message-ID: Good morning All.... Here is the morning Litho status report Please check back in Coral for latest tool updates and current equipment status. Thanks... The Litho Team Photolithography Quick Snapshot Wednesday, August 31, 2011 Reported Problems ASML Jobwriting computer- Floppy drive not functioning. Need to reset the floppy drive or computer Problem Updates ( > 24 Hrs ) EVG Bonder: Down.The turbo pump is bad. Turbo pump is at vendor being repaired as of 8/26. Estimated time to repair: 3 - 5 days Photolithography Area Status Wednesday, August 31, 2011 General Information / Lab Activities Exposure Tools Status Comments Priority ASML Stepper PROBLEM Intermittent carrier inspection 2 EVAlign UP EVAlign2 UP EVG-Imprint UP Karl Suss 1 UP Karl Suss 2 UP Manual Coaters Status EVGSpraycoat UP Headway UP Laurel UP Coaters Process Status SVGCoat 3612 Process Up 3617 Process Up 220-7 Process Up SVGCoat2 3612 Process Up 955-0.7 Process Up 220-3 Process Up Developers Status SVGDEV UP SVGDEV2 UP Ovens / Hotplates Status BLUEM UP Blue M 90 C. UP Blue M 110 C UP Blue M 150 C UP Fusion UP UV-Cure UP White-Oven UP YES Vapor Prime UP Hotplates- Laurel-left UP Laurel- right UP Headway UP Torrey Pines- left UP 90 Deg C UP 115 Deg C UP Torrey Pines- Right UP Metrology/Inspection Status Alpha-Step 500 UP Nanospec 2-Litho UP Nanospec 1-Etch UP P2 Profiler UP Microscpoes- #1 Leica/ UP #2 Ergolux/Drytek2 UP #3 Olympus/Litho UP #4 Nikon Optiphot/Litho UP #5 Nikon/Litho UP #6 Leitz/Bosch UP #7 Leitz/Diffusion UP #8 Olympus/Litho UP #9Olympus/Litho UP Miscellaneous Status EVBond DOWN Dead turbo pump 1 KSBonder UP KSCoat UP Litho SRD UP Mask Cleaner UP -------------- next part -------------- An HTML attachment was scrubbed... URL: