Here is the morning Litho status report
SVG Coat2- User reports that the computer crashed. Will check out on
morning rounds
Note 1: There will be an ASML Stepper maintenance training class from
7/25 through 8/12. During certain parts
of the day the stepper will be unavailable as the trainers
will be using the tool for the "hands-on" portion
of the training class. There will be a large group gathered
around the stepper during this time and the area
around the stepper will be blocked off to normal traffic.
Please observe the barricades during this time
period. We apologize for the inconvenience and thank you for
your patience and understanding.
Please check back in Coral for the latest tool updates and current
equipment status.
Thanks... The Litho Team
*/Photolithography Area Status/*
*/Tuesday, August 09, 2011/*
*/General Information / Lab Activities/*
ASML 3 week training class in progress
*/Exposure Tools/**//*
Status
Comments
Priority
ASML Stepper
*PROBLEM*
Intermittent carrier inspection
2
EVAlign
*UP*
EVAlign2
*UP*
EVG-Imprint
*UP*
Karl Suss 1
*UP*
Karl Suss 2
*UP*
*/Manual Coaters/*
Status
EVGSpraycoat
*UP*
Headway
*UP*
Laurel
*UP*
*/Coaters/*
Process Status
SVGCoat
3612 Process
*Up*
3617 Process
*Up*
220-7 Process
*Up*
SVGCoat2
3612 Process
*Problem*
Computer lockup
1
955-0.7 Process
*Up*
220-3 Process
*Up*
*/Developers/*
Status
SVGDEV
*UP*
SVGDEV2
*UP*
*/Ovens / Hotplates/*
Status
BLUEM
*UP*
Blue M 90 C.
*UP*
Blue M 110 C
*UP*
Blue M 150 C
*UP*
Fusion
*UP*
UV-Cure
*UP*
White-Oven
*UP*
YES Vapor Prime
*UP*
*/Hotplates- /*
Laurel-left
*UP*
Laurel- right
*UP*
Headway
*UP*
Torrey Pines- left
*UP*
90 Deg C
*UP*
115 Deg C
*UP*
Torrey Pines- Right
*UP*
*/Metrology/Inspection/*
Status
Alpha-Step 500
*UP*
Nanospec 2-Litho
*UP*
Nanospec 1-Etch
*UP*
P2 Profiler
*UP*
*/Microscpoes-/*
#1 Leica/
*UP*
#2 Ergolux/Drytek2
*UP*
#3 Olympus/Litho
*UP*
#4 Nikon Optiphot/Litho
*UP*
#5 Nikon/Litho
*UP*
#6 Leitz/Bosch
*UP*
#7 Leitz/Diffusion
*UP*
#8 Olympus/Litho
*UP*
#9Olympus/Litho
*UP*
*/Miscellaneous/*
Status
EVBond
*PROBLEM*
New graphite on order ETA 8/9
3
KSBonder
*UP*
KSCoat
*UP*
Litho SRD
*UP*
Mask Cleaner
*UP*
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://snf.stanford.edu/pipermail/litho/attachments/20110809/6bec3a1f/attachment.html>
More information about the litho
mailing list