*/Photolithography Quick Snapshot/*

		

*/Thursday, August 25, 2011/*

*/_Reported Problems_/*

	

	

	

	

Yes Oven: Down. No program steps. Needs reprogramming

SVG Coat 1: Problem, User reports poor spin on 220-7 process

SVG Coat 2: Problem. User reports non-uniform coating on 3612 1.0um process

SVG Dev 2: Problem. User reports that proram 3 is bad

*/_Problem Updates ( > 24 Hrs )_/*

			

EVG Bonder: Down.The turbo pump is bad. Sending turbo pump out today for 
repair. Estimated

repair time is 3 - 5 days

*/Photolithography Area Status/*

		

*/Thursday, August 25, 2011/*

*/General Information / Lab Activities/*

	

	

	

				

				

				

	

	

	

	

*/Exposure Tools/**//*

	

Status

	

Comments

	

Priority

ASML Stepper

	

*PROBLEM*

	

Intermittent carrier inspection

	

6

EVAlign

	

*UP*

	

	

EVAlign2

	

*UP*

	

	

EVG-Imprint

	

*UP*

	

	

Karl Suss 1

	

*UP*

	

	

Karl Suss 2

	

*UP*

	

	

*/Manual Coaters/*

	

Status

	

	

EVGSpraycoat

	

*UP*

	

	

Headway

	

*UP*

	

	

Laurel

	

*UP*

	

	

*/Coaters/*

	

Process Status

	

	

SVGCoat

	

3612 Process

	

*Up*

	

	

3617 Process

	

*Up*

	

	

220-7 Process

	

*Problem*

	

Poor spin

	

2

SVGCoat2

	

3612 Process

	

*Problem*

	

Non-uniform coating

	

3

955-0.7 Process

	

*Up*

	

	

220-3 Process

	

*Up*

	

	

*/Developers/*

	

Status

	

	

SVGDEV

	

*UP*

	

	

SVGDEV2

	

*PROBLEM*

	

Program problem

	

5

*/Ovens / Hotplates/*

	

Status

	

	

BLUEM

	

*UP*

	

	

Blue M 90 C.

	

*UP*

	

	

Blue M 110 C

	

*UP*

	

	

Blue M 150 C

	

*UP*

	

	

Fusion

	

*UP*

	

	

UV-Cure

	

*UP*

	

	

White-Oven

	

*UP*

	

	

YES Vapor Prime

	

*DOWN*

	

Lost program

	

1

*/Hotplates- /*

	

	

	

Laurel-left

	

*UP*

	

	

Laurel- right

	

*UP*

	

	

Headway

	

*UP*

	

	

Torrey Pines- left

	

*UP*

	

	

90 Deg C

	

*UP*

	

	

115 Deg C

	

*UP*

	

	

Torrey Pines- Right

	

*UP*

	

	

*/Metrology/Inspection/*

	

Status

	

	

Alpha-Step 500

	

*UP*

	

	

Nanospec 2-Litho

	

*UP*

	

	

Nanospec 1-Etch

	

*UP*

	

	

P2 Profiler

	

*UP*

	

	

*/Microscpoes-/*

	

	

	

#1 Leica/

	

*UP*

	

	

#2 Ergolux/Drytek2

	

*UP*

	

	

#3 Olympus/Litho

	

*UP*

	

	

#4 Nikon Optiphot/Litho

	

*UP*

	

	

#5 Nikon/Litho

	

*UP*

	

	

#6 Leitz/Bosch

	

*UP*

	

	

#7 Leitz/Diffusion

	

*UP*

	

	

#8 Olympus/Litho

	

*UP*

	

	

#9Olympus/Litho

	

*UP*

	

	

*/Miscellaneous/*

	

Status

	

	

EVBond

	

*DOWN*

	

Dead turbo pump

	

4

KSBonder

	

*UP*

	

	

KSCoat

	

*UP*

	

	

Litho SRD

	

*UP*

	

	

Mask Cleaner

	

*UP*

	

	

	

	

	


-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://snf.stanford.edu/pipermail/litho/attachments/20110825/59069647/attachment.html>


More information about the litho mailing list