Morning Litho status report 12/12
Gary J Sosa
gsosa at stanford.edu
Mon Dec 12 08:05:42 PST 2011
Good morning All..
Here is the morning Litho status report. The report also indicates tools that are shutting down today.
Please check back in Coral for the latest tool updates and current equipment status.
Thanks.. The Litho Team
Photolithography Quick Snapshot
Monday, December 12, 2011
Reported Problems
SVG Dev 2-Problem: Indexing issues. Either an elevator motor or wire harness, but needs further
troubleshooting
Karl Suss 2- Problem: Misaligning pieces. Need to investigate and troubleshoot
Problem Updates ( > 24 Hrs )
Photolithography Area Status
Monday, December 12, 2011
General Information / Lab Activities
Mahnaz- Out today(12/12)
Lab equipment shutdowns begin today to prepare for renovation. See below for tools shutting
down today(12/12)
EVG Bonder- Changing pressure plate from Quartz to Steel today
Exposure Tools
Status
Comments
Priority
ASML Stepper
PROBLEM
Customer demo and shutdown(12/12)
1
EVAlign
UP
EVAlign2
UP
EVG-Imprint
UP
Shutdown today(12/12)
Karl Suss 1
UP
Karl Suss 2
PROBLEM
Misaligning pieces
2
Manual Coaters
Status
EVGSpraycoat
UP
Shutdown today(12/12)
Headway
UP
Laurel
UP
Shutdown today(12/12)
Coaters
Process Status
SVGCoat
3612 Process
Up
3617 Process
Up
220-7 Process
Up
SVGCoat2
3612 Process
Up
955-0.7 Process
Up
220-3 Process
Up
Developers
Status
SVGDEV
UP
SVGDEV2
PROBLEM
Receive indexer problem
3
Ovens / Hotplates
Status
BLUEM
UP
Blue M 90 C.
UP
Blue M 110 C
UP
Blue M 150 C
UP
Fusion
UP
Shutdown today(12/12)
UV-Cure
UP
White-Oven
UP
YES Vapor Prime
UP
Hotplates-
Laurel-left
UP
Laurel- right
UP
Headway
UP
Torrey Pines- left
UP
90 Deg C
UP
115 Deg C
UP
Torrey Pines- Right
UP
Metrology/Inspection
Status
Alpha-Step 500
UP
Flexus Stresstest
UP
Nanospec 1-Etch
UP
Shutdown today(12/12)
Nanospec 2-Litho
UP
Prometrix
UP
Shutdown today(12/12)
P2 Profiler
UP
Rudolph Ellipsometer
UP
Surfscan 4500
UP
Shutdown today(12/12)
Woolam
UP
Shutdown today(12/12)
Zygo
UP
Shutdown today(12/12)
Microscpoes-
#1 Leica/
UP
Shutdown today(12/12)
#2 Ergolux/Drytek2
UP
#3 Olympus/Litho
UP
#4 Nikon Optiphot/Litho
UP
#5 Nikon/Litho
UP
#6 Leitz/Bosch
UP
Shutdown today(12/12)
#7 Leitz/Diffusion
UP
#8 Olympus/Litho
UP
#9Olympus/Litho
UP
Shutdown today(12/12)
Miscellaneous
Status
EVBond
UP
KSBonder
UP
Shutdown today(12/12)
KSCoat
PROBLEM
Shutdown today(12/12)
2
Litho SRD
UP
Mask Cleaner
UP
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://snf.stanford.edu/pipermail/litho/attachments/20111212/ef1252cc/attachment.html>
More information about the litho
mailing list