From vilanova at stanford.edu Tue Feb 1 08:59:45 2011 From: vilanova at stanford.edu (Eddy M Vilanova) Date: Tue, 1 Feb 2011 08:59:45 -0800 (PST) Subject: Fwd: Litho Daily Status Report 2/1/2011 In-Reply-To: <177557475.910955.1296579530016.JavaMail.root@zm05.stanford.edu> Message-ID: <1083178694.911061.1296579585075.JavaMail.root@zm05.stanford.edu> ----- Forwarded Message ----- From: "Eddy M Vilanova" To: litho at stanford.edu Cc: "vilanova" Sent: Tuesday, February 1, 2011 8:58:50 AM Subject: Litho Daily Status Report 2/1/2011 Photolithography Area Status Tuesday , February 01, 2011 General Information / Lab Activities Temp/Humidity/Airflow problem in aisle L-102(SVG Coat/Develop aisle) due to transfer fan problem. Exposure Tools Status Comments Priority ASML Stepper - Converting to 6" until tomorrow 2/2/2011 UP EVAlign UP EVAlign2 UP EVG-Imprint UP Karl Suss 1 UP Karl Suss 2 UP Manual Coaters Status EVGSpraycoat UP Headway UP Laurel UP Coaters Process Status SVGCoat 3612 Process Up 220-3 Process Up 220-7 Process Problem Optimizing Process 1 SVGCoat2 3612 Process Up 955-0.7 Process Up 3617 Process Up Developers Status SVGDEV UP SVGDEV2 UP Ovens / Hotplates Status BLUEM UP Blue M 90 C. UP Blue M 110 C UP Blue M 150 C UP Fusion DOWN Hotplate experiments UV-Cure UP White-Oven UP YES Vapor Prime UP Hotplates- Laurel-left UP Laurel- right UP Headway UP Torrey Pines- left UP 90 Deg C UP 115 Deg C UP Torrey Pines- Right UP Metrology/Inspection Status Alpha-Step 500 UP Nanospec 2-Litho UP Nanospec 1-Etch UP P2 Profiler PROBLEM -11 stage error 4 Microscpoes- #1 Leica/Analytical UP #2 Ergolux/Drytek2 UP #3 Olympus/Litho UP #4 Nikon Optiphot/Litho UP #5 Nikon/Litho UP #6 Leitz/Bosch UP #7 Leitz/Diffusion UP #8 Olympus/Litho UP #9 Olympus/Litho UP Miscellaneous Status EVBond PROBLEM Left flag did not pull 3 KSBonder PROBLEM Leaking nitrogen hose 5 KSCoat UP Litho SRD UP Mask Cleaner DOWN Water leak, Waiting for parts 2 From vilanova at stanford.edu Wed Feb 2 07:08:31 2011 From: vilanova at stanford.edu (Mario Vilanova) Date: Wed, 02 Feb 2011 07:08:31 -0800 Subject: Litho Morning Report 2/2/2011 Message-ID: <4D49736F.1060607@stanford.edu> -------------- next part -------------- A non-text attachment was scrubbed... Name: Photolithography Area Status.doc Type: application/msword Size: 98304 bytes Desc: not available URL: From vilanova at stanford.edu Thu Feb 3 07:22:33 2011 From: vilanova at stanford.edu (Mario Vilanova) Date: Thu, 03 Feb 2011 07:22:33 -0800 Subject: Litho Daily Status Report Message-ID: <4D4AC839.7080508@stanford.edu> -------------- next part -------------- A non-text attachment was scrubbed... Name: Photolithography Area Status.doc Type: application/msword Size: 98304 bytes Desc: not available URL: From gsosa at stanford.edu Fri Feb 4 07:39:05 2011 From: gsosa at stanford.edu (Gary Sosa) Date: Fri, 04 Feb 2011 07:39:05 -0800 Subject: Morning Litho status report 2/4 Message-ID: <4D4C1D99.9040604@stanford.edu> Good morning All..... Here is the morning Litho status report. No airflow in aisle L102(SVG coat/develop aisle) due to transfer fan problem. Due to this failure, there will be a loss of temperature, humidity and particulate control. Repairs are in progress. Please consider this as it relates to the sensitivity of your process. Parts are on order to repair the problem ASML Stepper- System needs 3D Align setup. Also user reports that "Dialog Screen" was closed out. Will investigate on morning rounds. EVG Spray Coater- FSE identified a bad component in the power distribution box. Parts are on order to replace the failed component. Mask Cleaner- Need to check on status of replacement part. Please check back in Coral for latest tool updates and current equipment status. Thanks..... The Litho Team */Photolithography Area Status/* */Friday, February 04, 2011/* */General Information / Lab Activities/* Temp/Humidity/Airflow problem in aisle L-102(SVG Coat/Develop aisle) due to transfer fan problem. Mahnaz- Out today */Exposure Tools/* Status Comments Priority ASML Stepper *PROBLEM* Needs 3D align setup 4 EVAlign *UP* EVAlign2 *UP* EVG-Imprint *UP* Karl Suss 1 *UP* Karl Suss 2 *UP* */Manual Coaters/* Status EVGSpraycoat *DOWN* Problem with power distribution 1 Headway *UP* Laurel *UP* */Coaters/* Process Status SVGCoat 3612 Process *Up* 220-3 Process *Up* 220-7 Process *Problem* Optimizing Process 3 SVGCoat2 3612 Process *Up* 955-0.7 Process *Up* 3617 Process *Up* */Developers/* Status SVGDEV *UP* SVGDEV2 *UP* */Ovens / Hotplates/* Status BLUEM *UP* Blue M 90 C. *UP* Blue M 110 C *UP* Blue M 150 C *UP* Fusion *DOWN* Hotplate experiments UV-Cure *UP* White-Oven *UP* YES Vapor Prime *UP* */Hotplates- /* Laurel-left *UP* Laurel- right *UP* Headway *UP* Torrey Pines- left *UP* 90 Deg C *UP* 115 Deg C *UP* Torrey Pines- Right *UP* */Metrology/Inspection/* Status Alpha-Step 500 *UP* Nanospec 2-Litho *UP* Nanospec 1-Etch *UP* P2 Profiler *PROBLEM* -11 stage error 7 */Microscpoes-/* #1 Leica/Analytical *UP* #2 Ergolux/Drytek2 *UP* #3 Olympus/Litho *UP* #4 Nikon Optiphot/Litho *UP* #5 Nikon/Litho *UP* #6 Leitz/Bosch *UP* #7 Leitz/Diffusion *UP* #8 Olympus/Litho *UP* #9 Olympus/Litho *UP* */Miscellaneous/* Status EVBond *PROBLEM* Left flag did not pull 5 KSBonder *PROBLEM* Leaking nitrogen hose 6 KSCoat *UP* Litho SRD *UP* Mask Cleaner *DOWN* Water leak, Waiting for parts 2 -------------- next part -------------- An HTML attachment was scrubbed... URL: From gsosa at stanford.edu Mon Feb 7 07:22:06 2011 From: gsosa at stanford.edu (Gary Sosa) Date: Mon, 07 Feb 2011 07:22:06 -0800 Subject: Morning Litho status report 2/7 Message-ID: <4D500E1E.1060801@stanford.edu> Good morning All...... Here is the morning Litho status report. Mahnaz is out today SVG Coat 1- User reports rails sticking on VP module. Will investigate on morning rounds SVG Coat 2- User reports sticking lifters on VP module. Will investigate on morning rounds EVG Spraycoater- Down for parts. Dead component in power distribution box. Parts on order Mask Cleaner- High pressure hose on order. Expect parts today. EV Bonder- User requests Quartz plate installation. Will swap in Quarts plate this morning Please check back in Coral for latest tool updates and current equipment status. Thanks .... The Litho Team */Photolithography Area Status/* */Monday, February 07, 2011/* */General Information / Lab Activities/* Temp/Humidity/Airflow problem in aisle L-102(SVG Coat/Develop aisle) due to transfer fan problem. Mahnaz- Out today */Exposure Tools/**//* Status Comments Priority ASML Stepper *UP* EVAlign *UP* EVAlign2 *UP* EVG-Imprint *UP* Karl Suss 1 *UP* Karl Suss 2 *UP* */Manual Coaters/* Status EVGSpraycoat *DOWN* Problem with power distribution 4 Headway *UP* Laurel *UP* */Coaters/* Process Status SVGCoat 3612 Process *Problem* Wafer transfer issue 1 220-3 Process *Up* 220-7 Process *Problem* Optimizing Process 3 SVGCoat2 3612 Process *Problem* Wafer transfer issue 2 955-0.7 Process *Up* 3617 Process *Up* */Developers/* Status SVGDEV *UP* SVGDEV2 *UP* */Ovens / Hotplates/* Status BLUEM *UP* Blue M 90 C. *UP* Blue M 110 C *UP* Blue M 150 C *UP* Fusion *DOWN* Hotplate experiments UV-Cure *UP* White-Oven *UP* YES Vapor Prime *UP* */Hotplates- /* Laurel-left *UP* Laurel- right *UP* Headway *UP* Torrey Pines- left *UP* 90 Deg C *UP* 115 Deg C *UP* Torrey Pines- Right *UP* */Metrology/Inspection/* Status Alpha-Step 500 *UP* Nanospec 2-Litho *UP* Nanospec 1-Etch *UP* P2 Profiler *PROBLEM* -11 stage error 7 */Microscpoes-/* #1 Leica/Analytical *UP* #2 Ergolux/Drytek2 *UP* #3 Olympus/Litho *UP* #4 Nikon Optiphot/Litho *UP* #5 Nikon/Litho *UP* #6 Leitz/Bosch *UP* #7 Leitz/Diffusion *UP* #8 Olympus/Litho *UP* #9 Olympus/Litho *UP* */Miscellaneous/* Status EVBond *PROBLEM* Left flag did not pull 6 KSBonder *PROBLEM* Leaking nitrogen hose 8 KSCoat *UP* Litho SRD *UP* Mask Cleaner *DOWN* Water leak, Waiting for parts 5 -------------- next part -------------- An HTML attachment was scrubbed... URL: From gsosa at stanford.edu Tue Feb 8 07:40:12 2011 From: gsosa at stanford.edu (Gary Sosa) Date: Tue, 08 Feb 2011 07:40:12 -0800 Subject: Morning Litho status report 2/8 Message-ID: <4D5163DC.9030408@stanford.edu> Good morning All...... Here is the morning Litho status report. EVG Spraycoater- Parts are on order to repair the power distribution box. Mask Cleaner- The new high pressure hose will be here today. Will install and test Please check back in Coral for the latest tool updates and current equipment status. Thanks.... The Litho Team */Photolithography Area Status/* */Tuesday, February 08, 2011/* */General Information / Lab Activities/* Temp/Humidity/Airflow problem in aisle L-102(SVG Coat/Develop aisle) due to transfer fan problem. */Exposure Tools/* Status Comments Priority ASML Stepper *UP* EVAlign *UP* EVAlign2 *UP* EVG-Imprint *UP* Karl Suss 1 *UP* Karl Suss 2 *UP* */Manual Coaters/* Status EVGSpraycoat *DOWN* Problem with power distribution 1 Headway *UP* Laurel *UP* */Coaters/* Process Status SVGCoat 3612 Process *Up* 220-3 Process *Up* 220-7 Process *Problem* Optimizing Process 3 SVGCoat2 3612 Process *Up* 955-0.7 Process *Up* 3617 Process *Up* */Developers/* Status SVGDEV *UP* SVGDEV2 *UP* */Ovens / Hotplates/* Status BLUEM *UP* Blue M 90 C. *UP* Blue M 110 C *UP* Blue M 150 C *UP* Fusion *DOWN* Hotplate experiments UV-Cure *UP* White-Oven *UP* YES Vapor Prime *UP* */Hotplates- /* Laurel-left *UP* Laurel- right *UP* Headway *UP* Torrey Pines- left *UP* 90 Deg C *UP* 115 Deg C *UP* Torrey Pines- Right *UP* */Metrology/Inspection/* Status Alpha-Step 500 *UP* Nanospec 2-Litho *UP* Nanospec 1-Etch *UP* P2 Profiler *PROBLEM* -11 stage error 5 */Microscpoes-/* #1 Leica/Analytical *UP* #2 Ergolux/Drytek2 *UP* #3 Olympus/Litho *UP* #4 Nikon Optiphot/Litho *UP* #5 Nikon/Litho *UP* #6 Leitz/Bosch *UP* #7 Leitz/Diffusion *UP* #8 Olympus/Litho *UP* #9 Olympus/Litho *UP* */Miscellaneous/* Status EVBond *PROBLEM* Left flag did not pull 4 KSBonder *PROBLEM* Leaking nitrogen hose 6 KSCoat *UP* Litho SRD *UP* Mask Cleaner *DOWN* Water leak, Waiting for parts 2 -------------- next part -------------- An HTML attachment was scrubbed... URL: From gsosa at stanford.edu Wed Feb 9 07:43:17 2011 From: gsosa at stanford.edu (Gary Sosa) Date: Wed, 09 Feb 2011 07:43:17 -0800 Subject: Morning Litho status report 2/9 Message-ID: <4D52B615.8050506@stanford.edu> Good morning All Here is the morning Litho status report. EVG Spraycoater- Still having issues with power distribution. System needs further troubleshooting by vendor to identify and repair the problem. Mask Cleaner- The mask cleaner is back up. Replaced the high pressure hose. Tested system-OK Checked for leaks-OK Please check back in Coral for latest tool updates and current equipment status. Thanks.... The Litho Team */Photolithography Area Status/* */Wednesday, February 09, 2011/* */General Information / Lab Activities/* Temp/Humidity/Airflow problem in aisle L-102(SVG Coat/Develop aisle) due to transfer fan problem. */Exposure Tools/**//* Status Comments Priority ASML Stepper *UP* EVAlign *UP* EVAlign2 *UP* EVG-Imprint *UP* Karl Suss 1 *UP* Karl Suss 2 *UP* */Manual Coaters/* Status EVGSpraycoat *DOWN* Problem with power distribution 1 Headway *UP* Laurel *UP* */Coaters/* Process Status SVGCoat 3612 Process *Up* 220-3 Process *Up* 220-7 Process *Problem* Optimizing Process 2 SVGCoat2 3612 Process *Up* 955-0.7 Process *Up* 3617 Process *Up* */Developers/* Status SVGDEV *UP* SVGDEV2 *UP* */Ovens / Hotplates/* Status BLUEM *UP* Blue M 90 C. *UP* Blue M 110 C *UP* Blue M 150 C *UP* Fusion *DOWN* Hotplate experiments UV-Cure *UP* White-Oven *UP* YES Vapor Prime *UP* */Hotplates- /* Laurel-left *UP* Laurel- right *UP* Headway *UP* Torrey Pines- left *UP* 90 Deg C *UP* 115 Deg C *UP* Torrey Pines- Right *UP* */Metrology/Inspection/* Status Alpha-Step 500 *UP* Nanospec 2-Litho *UP* Nanospec 1-Etch *UP* P2 Profiler *PROBLEM* -11 stage error 4 */Microscpoes-/* #1 Leica/Analytical *UP* #2 Ergolux/Drytek2 *UP* #3 Olympus/Litho *UP* #4 Nikon Optiphot/Litho *UP* #5 Nikon/Litho *UP* #6 Leitz/Bosch *UP* #7 Leitz/Diffusion *UP* #8 Olympus/Litho *UP* #9 Olympus/Litho *UP* */Miscellaneous/* Status EVBond *PROBLEM* Left flag did not pull 3 KSBonder *PROBLEM* Leaking nitrogen hose 5 KSCoat *UP* Litho SRD *UP* Mask Cleaner *UP* Hose replaced, tested OK -------------- next part -------------- An HTML attachment was scrubbed... URL: From gsosa at stanford.edu Thu Feb 10 07:22:10 2011 From: gsosa at stanford.edu (Gary Sosa) Date: Thu, 10 Feb 2011 07:22:10 -0800 Subject: Morning Litho status report Message-ID: <4D5402A2.6030203@stanford.edu> Good morning All.... Here is the morning Litho status report Karl Suss Aligner #2- Mask top plate for mounting mask holder not sensed by system. Need to troubleshoot. Please check back in Coral for latest tool updates and current equipment status. Thanks... The Litho Team */Photolithography Area Status/* */Thursday, February 10, 2011/* */General Information / Lab Activities/* Mario- Out today */Exposure Tools/* Status Comments Priority ASML Stepper *UP* EVAlign *UP* EVAlign2 *UP* EVG-Imprint *UP* Karl Suss 1 *UP* Karl Suss 2 *DOWN* Mask plate problem 1 */Manual Coaters/* Status EVGSpraycoat *UP* Headway *UP* Laurel *UP* */Coaters/* Process Status SVGCoat 3612 Process *Up* 220-3 Process *Up* 220-7 Process *Problem* Optimizing Process 2 SVGCoat2 3612 Process *Up* 955-0.7 Process *Up* 3617 Process *Up* */Developers/* Status SVGDEV *UP* SVGDEV2 *UP* */Ovens / Hotplates/* Status BLUEM *UP* Blue M 90 C. *UP* Blue M 110 C *UP* Blue M 150 C *UP* Fusion *DOWN* Hotplate experiments UV-Cure *UP* White-Oven *UP* YES Vapor Prime *UP* */Hotplates- /* Laurel-left *UP* Laurel- right *UP* Headway *UP* Torrey Pines- left *UP* 90 Deg C *UP* 115 Deg C *UP* Torrey Pines- Right *UP* */Metrology/Inspection/* Status Alpha-Step 500 *UP* Nanospec 2-Litho *UP* Nanospec 1-Etch *UP* P2 Profiler *PROBLEM* -11 stage error 4 */Microscpoes-/* #1 Leica/Analytical *UP* #2 Ergolux/Drytek2 *UP* #3 Olympus/Litho *UP* #4 Nikon Optiphot/Litho *UP* #5 Nikon/Litho *UP* #6 Leitz/Bosch *UP* #7 Leitz/Diffusion *UP* #8 Olympus/Litho *UP* #9 Olympus/Litho *UP* */Miscellaneous/* Status EVBond *PROBLEM* Left flag did not pull 3 KSBonder *PROBLEM* Leaking nitrogen hose 5 KSCoat *UP* Litho SRD *UP* Mask Cleaner *UP* Hose replaced, tested OK -------------- next part -------------- An HTML attachment was scrubbed... URL: From gsosa at stanford.edu Fri Feb 11 07:35:46 2011 From: gsosa at stanford.edu (Gary Sosa) Date: Fri, 11 Feb 2011 07:35:46 -0800 Subject: Morning Litho status report 2/11 Message-ID: <4D555752.10200@stanford.edu> Good morning All.... Here is the morning Litho status report SVG Dev2- Indexer making noise . Will check on morning rounds EVG Bonder- User reports that top heater not working. Possible lamp problem. Will check on morning rounds Please check back in Coral for latest tool updates and current equipment status. Thanks.... The Litho Team */Photolithography Area Status/* */Friday, February 11, 2011/* */General Information / Lab Activities/* Mahnaz in Late today( 10:00AM) */Exposure Tools/**//* Status Comments Priority ASML Stepper *UP* EVAlign *UP* EVAlign2 *UP* EVG-Imprint *UP* Karl Suss 1 *UP* Karl Suss 2 *UP* */Manual Coaters/* Status EVGSpraycoat *UP* Headway *UP* Laurel *UP* */Coaters/* Process Status SVGCoat 3612 Process *Up* 220-3 Process *Up* 220-7 Process *Problem* Optimizing Process 3 SVGCoat2 3612 Process *Up* 955-0.7 Process *Up* 3617 Process *Up* */Developers/* Status SVGDEV *UP* SVGDEV2 *PROBLEM* Elevator making noise 2 */Ovens / Hotplates/* Status BLUEM *UP* Blue M 90 C. *UP* Blue M 110 C *UP* Blue M 150 C *UP* Fusion *DOWN* Hotplate experiments UV-Cure *UP* White-Oven *UP* YES Vapor Prime *UP* */Hotplates- /* Laurel-left *UP* Laurel- right *UP* Headway *UP* Torrey Pines- left *UP* 90 Deg C *UP* 115 Deg C *UP* Torrey Pines- Right *UP* */Metrology/Inspection/* Status Alpha-Step 500 *UP* Nanospec 2-Litho *UP* Nanospec 1-Etch *UP* P2 Profiler *PROBLEM* -11 stage error 4 */Microscpoes-/* #1 Leica/Analytical *UP* #2 Ergolux/Drytek2 *UP* #3 Olympus/Litho *UP* #4 Nikon Optiphot/Litho *UP* #5 Nikon/Litho *UP* #6 Leitz/Bosch *UP* #7 Leitz/Diffusion *UP* #8 Olympus/Litho *UP* #9 Olympus/Litho *UP* */Miscellaneous/* Status EVBond *DOWN* Heater lamp problem 1 KSBonder *PROBLEM* Leaking nitrogen hose 5 KSCoat *UP* Litho SRD *UP* Mask Cleaner *UP* -------------- next part -------------- An HTML attachment was scrubbed... URL: From gsosa at stanford.edu Mon Feb 14 07:42:54 2011 From: gsosa at stanford.edu (Gary Sosa) Date: Mon, 14 Feb 2011 07:42:54 -0800 Subject: Morning Litho status report 2/14 Message-ID: <4D594D7E.2030703@stanford.edu> Good morning All.... Here is the morning Litho status report Please check back in Coral for latest tool updates and current equipment status. Thanks... The Litho Team */Photolithography Area Status/* */Monday, February 14, 2011/* */General Information / Lab Activities/* */Exposure Tools/* Status Comments Priority ASML Stepper *UP* EVAlign *UP* EVAlign2 *UP* EVG-Imprint *UP* Karl Suss 1 *UP* Karl Suss 2 *UP* */Manual Coaters/* Status EVGSpraycoat *UP* Headway *UP* Laurel *UP* */Coaters/* Process Status SVGCoat 3612 Process *Up* 220-3 Process *Up* 220-7 Process *Problem* Optimizing Process 1 SVGCoat2 3612 Process *Up* 955-0.7 Process *Up* 3617 Process *Up* */Developers/* Status SVGDEV *UP* SVGDEV2 *UP* */Ovens / Hotplates/* Status BLUEM *UP* Blue M 90 C. *UP* Blue M 110 C *UP* Blue M 150 C *UP* Fusion *DOWN* Hotplate experiments UV-Cure *UP* White-Oven *UP* YES Vapor Prime *UP* */Hotplates- /* Laurel-left *UP* Laurel- right *UP* Headway *UP* Torrey Pines- left *UP* 90 Deg C *UP* 115 Deg C *UP* Torrey Pines- Right *UP* */Metrology/Inspection/* Status Alpha-Step 500 *UP* Nanospec 2-Litho *UP* Nanospec 1-Etch *UP* P2 Profiler *PROBLEM* -11 stage error 3 */Microscpoes-/* #1 Leica/Analytical *UP* #2 Ergolux/Drytek2 *UP* #3 Olympus/Litho *UP* #4 Nikon Optiphot/Litho *UP* #5 Nikon/Litho *UP* #6 Leitz/Bosch *UP* #7 Leitz/Diffusion *UP* #8 Olympus/Litho *UP* #9 Olympus/Litho *UP* */Miscellaneous/* Status EVBond *PROBLEM* Heater lamps replaced 2 KSBonder *PROBLEM* Leaking nitrogen hose 4 KSCoat *UP* Litho SRD *UP* Mask Cleaner *UP* -------------- next part -------------- An HTML attachment was scrubbed... URL: From gsosa at stanford.edu Tue Feb 15 07:23:57 2011 From: gsosa at stanford.edu (Gary Sosa) Date: Tue, 15 Feb 2011 07:23:57 -0800 Subject: Morning Litho status report 2/15 Message-ID: <4D5A9A8D.9090001@stanford.edu> Good morning All.... Here is the morning Litho status report. EVG Align- User reports that screen is frozen and computer unresponsive. Will investigate on morning rounds. Please check back in Coral for latest tool updates and current equipment status. Thanks... The Litho Team */Photolithography Area Status/* */Tuesday, February 15, 2011/* */General Information / Lab Activities/* */Exposure Tools/**//* Status Comments Priority ASML Stepper *UP* EVAlign *PROBLEM* Computer screen frozen 1 EVAlign2 *UP* EVG-Imprint *UP* Karl Suss 1 *UP* Karl Suss 2 *UP* */Manual Coaters/* Status EVGSpraycoat *UP* Headway *UP* Laurel *UP* */Coaters/* Process Status SVGCoat 3612 Process *Up* 220-3 Process *Up* 220-7 Process *Problem* Optimizing Process 2 SVGCoat2 3612 Process *Up* 955-0.7 Process *Up* 3617 Process *Up* */Developers/* Status SVGDEV *UP* SVGDEV2 *UP* */Ovens / Hotplates/* Status BLUEM *UP* Blue M 90 C. *UP* Blue M 110 C *UP* Blue M 150 C *UP* Fusion *DOWN* Hotplate experiments UV-Cure *UP* White-Oven *UP* YES Vapor Prime *UP* */Hotplates- /* Laurel-left *UP* Laurel- right *UP* Headway *UP* Torrey Pines- left *UP* 90 Deg C *UP* 115 Deg C *UP* Torrey Pines- Right *UP* */Metrology/Inspection/* Status Alpha-Step 500 *UP* Nanospec 2-Litho *UP* Nanospec 1-Etch *UP* P2 Profiler *PROBLEM* -11 stage error 4 */Microscpoes-/* #1 Leica/Analytical *UP* #2 Ergolux/Drytek2 *UP* #3 Olympus/Litho *UP* #4 Nikon Optiphot/Litho *UP* #5 Nikon/Litho *UP* #6 Leitz/Bosch *UP* #7 Leitz/Diffusion *UP* #8 Olympus/Litho *UP* #9 Olympus/Litho *UP* */Miscellaneous/* Status EVBond *PROBLEM* Flag puller issue 3 KSBonder *PROBLEM* Leaking nitrogen hose 5 KSCoat *UP* Litho SRD *UP* Mask Cleaner *UP* -------------- next part -------------- An HTML attachment was scrubbed... URL: From gsosa at stanford.edu Wed Feb 16 07:41:34 2011 From: gsosa at stanford.edu (Gary Sosa) Date: Wed, 16 Feb 2011 07:41:34 -0800 Subject: Morning Litho status report 2/16 Message-ID: <4D5BF02E.8010102@stanford.edu> Good morning All.... Here is the morning Litho status report EV Align- Exposure Lamp exploded yesterday(2/15). Lamphouse cleanup performed by Stanford EH&S. System re-assembled and under evaluation. Will replace reflector and install new lamp today. Will test and evaluate for intensity/uniformity issues. Will take further action if needed. Please check back in Coral for latest tool updates and equipment status. Thanks.... The Litho Team */Photolithography Area Status/* */Wednesday, February 16, 2011/* */General Information / Lab Activities/* */Exposure Tools/* Status Comments Priority ASML Stepper *UP* EVAlign *DOWN* UV lamp explosion 1 EVAlign2 *UP* EVG-Imprint *UP* Karl Suss 1 *UP* Karl Suss 2 *UP* */Manual Coaters/* Status EVGSpraycoat *UP* Headway *UP* Laurel *UP* */Coaters/* Process Status SVGCoat 3612 Process *Up* 220-3 Process *Up* 220-7 Process *Problem* Optimizing Process 2 SVGCoat2 3612 Process *Up* 955-0.7 Process *Up* 3617 Process *Up* */Developers/* Status SVGDEV *UP* SVGDEV2 *UP* */Ovens / Hotplates/* Status BLUEM *UP* Blue M 90 C. *UP* Blue M 110 C *UP* Blue M 150 C *UP* Fusion *DOWN* Hotplate experiments UV-Cure *UP* White-Oven *UP* YES Vapor Prime *UP* */Hotplates- /* Laurel-left *UP* Laurel- right *UP* Headway *UP* Torrey Pines- left *UP* 90 Deg C *UP* 115 Deg C *UP* Torrey Pines- Right *UP* */Metrology/Inspection/* Status Alpha-Step 500 *UP* Nanospec 2-Litho *UP* Nanospec 1-Etch *UP* P2 Profiler *PROBLEM* -11 stage error 4 */Microscpoes-/* #1 Leica/Analytical *UP* #2 Ergolux/Drytek2 *UP* #3 Olympus/Litho *UP* #4 Nikon Optiphot/Litho *UP* #5 Nikon/Litho *UP* #6 Leitz/Bosch *UP* #7 Leitz/Diffusion *UP* #8 Olympus/Litho *UP* #9 Olympus/Litho *UP* */Miscellaneous/* Status EVBond *PROBLEM* Flag puller issue 3 KSBonder *PROBLEM* Leaking nitrogen hose 5 KSCoat *UP* Litho SRD *UP* Mask Cleaner *UP* -------------- next part -------------- An HTML attachment was scrubbed... URL: From gsosa at stanford.edu Thu Feb 17 07:45:45 2011 From: gsosa at stanford.edu (Gary Sosa) Date: Thu, 17 Feb 2011 07:45:45 -0800 Subject: Morning Litho status report 2/17 Message-ID: <4D5D42A9.2030209@stanford.edu> Good morning All... Here is the morning Litho status report. ASML Stepper- Down. Problems encountered with HP stage laser during customer demo. ASML F/S to replace the laser today and do required setups and testing. EVG Aligner- Down. Low intensity with the current optics. Will do further testing. Also acquiring information from EVG for replacement parts. Laurell Spinner- User reports poor spin with 3612 resist. Will check out on morning rounds Please check back in Coral for latest tool updates and current equipment status. Thanks...... The Litho Team */Photolithography Area Status/* */Thursday, February 17, 2011/* */General Information / Lab Activities/* */Exposure Tools/**//* Status Comments Priority ASML Stepper *DOWN* Stage laser problem 1 EVAlign *DOWN* UV lamp explosion 2 EVAlign2 *UP* EVG-Imprint *UP* Karl Suss 1 *UP* Karl Suss 2 *UP* */Manual Coaters/* Status EVGSpraycoat *UP* Headway *UP* Laurel *PROBLEM* Poor Spin 3 */Coaters/* Process Status SVGCoat 3612 Process *Up* 220-3 Process *Up* 220-7 Process *Problem* Optimizing Process 4 SVGCoat2 3612 Process *Up* 955-0.7 Process *Up* 3617 Process *Up* */Developers/* Status SVGDEV *UP* SVGDEV2 *UP* */Ovens / Hotplates/* Status BLUEM *UP* Blue M 90 C. *UP* Blue M 110 C *UP* Blue M 150 C *UP* Fusion *DOWN* Hotplate experiments UV-Cure *UP* White-Oven *UP* YES Vapor Prime *UP* */Hotplates- /* Laurel-left *UP* Laurel- right *UP* Headway *UP* Torrey Pines- left *UP* 90 Deg C *UP* 115 Deg C *UP* Torrey Pines- Right *UP* */Metrology/Inspection/* Status Alpha-Step 500 *UP* Nanospec 2-Litho *UP* Nanospec 1-Etch *UP* P2 Profiler *PROBLEM* -11 stage error 5 */Microscpoes-/* #1 Leica/Analytical *UP* #2 Ergolux/Drytek2 *UP* #3 Olympus/Litho *UP* #4 Nikon Optiphot/Litho *UP* #5 Nikon/Litho *UP* #6 Leitz/Bosch *UP* #7 Leitz/Diffusion *UP* #8 Olympus/Litho *UP* #9 Olympus/Litho *UP* */Miscellaneous/* Status EVBond *PROBLEM* Flag puller issue 6 KSBonder *PROBLEM* Leaking nitrogen hose 7 KSCoat *UP* Litho SRD *UP* Mask Cleaner *UP* -------------- next part -------------- An HTML attachment was scrubbed... URL: From gsosa at stanford.edu Fri Feb 18 07:11:29 2011 From: gsosa at stanford.edu (Gary Sosa) Date: Fri, 18 Feb 2011 07:11:29 -0800 Subject: Morning Litho status report 2/18 Message-ID: <4D5E8C21.2020105@stanford.edu> Good morning All. Here is the morning Litho status report. ASML Stepper- System froze up with work in progress. Will investigate and retrieve stranded wafers. EVG Align- Will re-check intensity today. Tool release today with increased exposures to compensate for low lamp intensity. Quotes for replacement parts received and being reviewed EVG Bonder- The pressure plate will be changed to steel this afternoon. Please check back in Coral for latest tool updates and current equipment status. Thanks... The Litho Team */Photolithography Area Status/* */Friday, February 18, 2011/* */General Information / Lab Activities/* EV Bonder- Changing pressure plate to Steel this afternoon */Exposure Tools/* Status Comments Priority ASML Stepper *DOWN* System froze up 1 EVAlign *DOWN* System testing 2 EVAlign2 *UP* EVG-Imprint *UP* Karl Suss 1 *UP* Karl Suss 2 *UP* */Manual Coaters/* Status EVGSpraycoat *UP* Headway *UP* Laurel *UP* */Coaters/* Process Status SVGCoat 3612 Process *Up* 220-3 Process *Up* 220-7 Process *Problem* Optimizing Process 3 SVGCoat2 3612 Process *Up* 955-0.7 Process *Up* 3617 Process *Up* */Developers/* Status SVGDEV *UP* SVGDEV2 *UP* */Ovens / Hotplates/* Status BLUEM *UP* Blue M 90 C. *UP* Blue M 110 C *UP* Blue M 150 C *UP* Fusion *DOWN* Hotplate experiments UV-Cure *UP* White-Oven *UP* YES Vapor Prime *UP* */Hotplates- /* Laurel-left *UP* Laurel- right *UP* Headway *UP* Torrey Pines- left *UP* 90 Deg C *UP* 115 Deg C *UP* Torrey Pines- Right *UP* */Metrology/Inspection/* Status Alpha-Step 500 *UP* Nanospec 2-Litho *UP* Nanospec 1-Etch *UP* P2 Profiler *PROBLEM* -11 stage error 4 */Microscpoes-/* #1 Leica/Analytical *UP* #2 Ergolux/Drytek2 *UP* #3 Olympus/Litho *UP* #4 Nikon Optiphot/Litho *UP* #5 Nikon/Litho *UP* #6 Leitz/Bosch *UP* #7 Leitz/Diffusion *UP* #8 Olympus/Litho *UP* #9 Olympus/Litho *UP* */Miscellaneous/* Status EVBond *PROBLEM* Flag puller issue 5 KSBonder *PROBLEM* Leaking nitrogen hose 6 KSCoat *UP* Litho SRD *UP* Mask Cleaner *UP* -------------- next part -------------- An HTML attachment was scrubbed... URL: From vilanova at stanford.edu Wed Feb 23 07:51:44 2011 From: vilanova at stanford.edu (Mario Vilanova) Date: Wed, 23 Feb 2011 07:51:44 -0800 Subject: Litho Morning Status Report 2/23/2011 Message-ID: <4D652D10.3050702@stanford.edu> -------------- next part -------------- A non-text attachment was scrubbed... Name: Photolithography Area Status.doc Type: application/msword Size: 98816 bytes Desc: not available URL: From gsosa at stanford.edu Thu Feb 24 07:31:14 2011 From: gsosa at stanford.edu (Gary Sosa) Date: Thu, 24 Feb 2011 07:31:14 -0800 Subject: Morning litho status report 2/24 Message-ID: <4D6679C2.1050909@stanford.edu> Good morning All... Here is the morning litho status report- EV Bonder- The top heater lamps are not working. Troubleshooting system in progress EV Align- Non-criticals only. New optics for lamp house received. Will schedule a time to install/test. Please check back in Coral for latest tool updates and current equipment status. Thanks... The Litho Team */Photolithography Area Status/* */Thursday, February 24, 2011/* */General Information / Lab Activities/* Mahnaz- Out today 2/24 */Exposure Tools/* Status Comments Priority ASML Stepper *UP* EVAlign *PROBLEM* Non-Critical work only 2 EVAlign2 *UP* EVG-Imprint *UP* Karl Suss 1 *UP* Karl Suss 2 *UP* */Manual Coaters/* Status EVGSpraycoat *UP* Headway *UP* Laurel *UP* */Coaters/* Process Status SVGCoat 3612 Process *Up* 220-3 Process *Up* 220-7 Process *Problem* Optimizing Process 3 SVGCoat2 3612 Process *Up* 955-0.7 Process *Up* 3617 Process *Up* */Developers/* Status SVGDEV *UP* SVGDEV2 *UP* */Ovens / Hotplates/* Status BLUEM *UP* Blue M 90 C. *UP* Blue M 110 C *UP* Blue M 150 C *UP* Fusion *DOWN* Hotplate experiments UV-Cure *UP* White-Oven *UP* YES Vapor Prime *UP* */Hotplates- /* Laurel-left *UP* Laurel- right *UP* Headway *UP* Torrey Pines- left *UP* 90 Deg C *UP* 115 Deg C *UP* Torrey Pines- Right *UP* */Metrology/Inspection/* Status Alpha-Step 500 *UP* Nanospec 2-Litho *UP* Nanospec 1-Etch *UP* P2 Profiler *PROBLEM* -11 stage error 4 */Microscpoes-/* #1 Leica/Analytical *UP* #2 Ergolux/Drytek2 *UP* #3 Olympus/Litho *UP* #4 Nikon Optiphot/Litho *UP* #5 Nikon/Litho *UP* #6 Leitz/Bosch *UP* #7 Leitz/Diffusion *UP* #8 Olympus/Litho *UP* #9 Olympus/Litho *UP* */Miscellaneous/* Status EVBond *DOWN* Top heater not working 1 KSBonder *PROBLEM* Leaking nitrogen hose 5 KSCoat *UP* Litho SRD *UP* Mask Cleaner *UP* -------------- next part -------------- An HTML attachment was scrubbed... URL: From gsosa at stanford.edu Fri Feb 25 07:31:12 2011 From: gsosa at stanford.edu (Gary Sosa) Date: Fri, 25 Feb 2011 07:31:12 -0800 Subject: Morning Litho status report 2/25 Message-ID: <4D67CB40.1020809@stanford.edu> Good morning All..... Here is the morning Litho status report. EV Aligner- The lamp house optics are being replaced and intensity/uniformity tested EV Bonder- Repairs and testing of heater lamps to be completed today(2/25). The bonder will be configured for "Steel" pressure plate as per the published schedule posted at the machine. Dump Rinser- User reports problem with D/R in "wbmiscres". Will test out this morning Microscope 2- Across from Drytek. User reports a problem. Will check out microscope this morning. Please check back in Coral for latest tool updates and current equipment status. Thanks... The Litho Team */Photolithography Area Status/* */Friday, February 25, 2011/* */General Information / Lab Activities/* Mahnaz- Out today 2/25 */Exposure Tools/**//* Status Comments Priority ASML Stepper *UP* EVAlign *DOWN* Replacing optics 2 EVAlign2 *UP* EVG-Imprint *UP* Karl Suss 1 *UP* Karl Suss 2 *UP* */Manual Coaters/* Status EVGSpraycoat *UP* Headway *UP* Laurel *UP* */Coaters/* Process Status SVGCoat 3612 Process *Up* 220-3 Process *Up* 220-7 Process *Problem* Optimizing Process 4 SVGCoat2 3612 Process *Up* 955-0.7 Process *Up* 3617 Process *Up* */Developers/* Status SVGDEV *UP* SVGDEV2 *UP* */Ovens / Hotplates/* Status BLUEM *UP* Blue M 90 C. *UP* Blue M 110 C *UP* Blue M 150 C *UP* Fusion *DOWN* Hotplate experiments UV-Cure *UP* White-Oven *UP* YES Vapor Prime *UP* */Hotplates- /* Laurel-left *UP* Laurel- right *UP* Headway *UP* Torrey Pines- left *UP* 90 Deg C *UP* 115 Deg C *UP* Torrey Pines- Right *UP* */Metrology/Inspection/* Status Alpha-Step 500 *UP* Nanospec 2-Litho *UP* Nanospec 1-Etch *UP* P2 Profiler *PROBLEM* -11 stage error 5 */Microscpoes-/* #1 Leica/Analytical *UP* #2 Ergolux/Drytek2 *PROBLEM* Not working correctly 3 #3 Olympus/Litho *UP* #4 Nikon Optiphot/Litho *UP* #5 Nikon/Litho *UP* #6 Leitz/Bosch *UP* #7 Leitz/Diffusion *UP* #8 Olympus/Litho *UP* #9 Olympus/Litho *UP* */Miscellaneous/* Status EVBond *DOWN* Top heater not working 1 KSBonder *PROBLEM* Leaking nitrogen hose 6 KSCoat *UP* Litho SRD *UP* Mask Cleaner *UP* -------------- next part -------------- An HTML attachment was scrubbed... URL: From gsosa at stanford.edu Mon Feb 28 07:30:45 2011 From: gsosa at stanford.edu (Gary Sosa) Date: Mon, 28 Feb 2011 07:30:45 -0800 Subject: Morning Litho status report 2/28 Message-ID: <4D6BBFA5.6090304@stanford.edu> Good morning All.... Here is the morning Litho status report. SVG Coat !- User reports that HPO transfer belts not turning. Will investigate on morning rounds Karl Suss 1- User reports that system is not working. Will check out on morning rounds Karl Suss 2- User reports that X/Y stage not moving well. Will check out on morning rounds Microscope #2- Turret not turning with buttons. Will report to our microscope service people. Turret can be rotated manually. EV Bonder- Converting pressure plate from Steel to Quartz this morning. Please check back in Coral for latest tool updates and current equipment status. Thanks.... The Litho Team */Photolithography Area Status/* */Monday, February 28, 2011/* */General Information / Lab Activities/* EV Bonder converting to Quartz pressure plate this morning */Exposure Tools/* Status Comments Priority ASML Stepper *UP* EVAlign *PROBLEM* Non-criticals only 4 EVAlign2 *UP* EVG-Imprint *UP* Karl Suss 1 *PROBLEM* System not responding 2 Karl Suss 2 *DOWN* X/Y stage movement 1 */Manual Coaters/* Status EVGSpraycoat *UP* Headway *UP* Laurel *UP* */Coaters/* Process Status SVGCoat 3612 Process *Problem* Hot plate transport problem 3 220-3 Process *Up* 220-7 Process *Problem* Optimizing Process 5 SVGCoat2 3612 Process *Up* 955-0.7 Process *Up* 3617 Process *Up* */Developers/* Status SVGDEV *UP* SVGDEV2 *UP* */Ovens / Hotplates/* Status BLUEM *UP* Blue M 90 C. *UP* Blue M 110 C *UP* Blue M 150 C *UP* Fusion *DOWN* Hotplate experiments UV-Cure *UP* White-Oven *UP* YES Vapor Prime *UP* */Hotplates- /* Laurel-left *UP* Laurel- right *UP* Headway *UP* Torrey Pines- left *UP* 90 Deg C *UP* 115 Deg C *UP* Torrey Pines- Right *UP* */Metrology/Inspection/* Status Alpha-Step 500 *UP* Nanospec 2-Litho *UP* Nanospec 1-Etch *UP* P2 Profiler *PROBLEM* -11 stage error 6 */Microscpoes-/* #1 Leica/Analytical *UP* #2 Ergolux/Drytek2 *PROBLEM* Turret not rotating 7 #3 Olympus/Litho *UP* #4 Nikon Optiphot/Litho *UP* #5 Nikon/Litho *UP* #6 Leitz/Bosch *UP* #7 Leitz/Diffusion *UP* #8 Olympus/Litho *UP* #9 Olympus/Litho *UP* */Miscellaneous/* Status EVBond *UP* KSBonder *PROBLEM* Leaking nitrogen hose 8 KSCoat *UP* Litho SRD *UP* Mask Cleaner *UP* -------------- next part -------------- An HTML attachment was scrubbed... URL: