Litho status report 1/5
Gary Sosa
gsosa at stanford.edu
Wed Jan 5 08:07:27 PST 2011
Good morning All.....
Here is the Litho morning status report.
ASML Stepper- Down for annual PM and reticle table problem. FSE to
continue work today
EVG Spraycoater- Down. Computer OK. Received and will install
registration code for application software
and continue to bring up tool to
operational state
Laurell Spinner- Down. Spinner will be delivered today, late AM.
Installation/testing to follow
SVG Coat 1- Down. Recipe Manager computer being repaired by IT Department
Blue M Ovens 110deg and 150deg- Temperature controllers replaced with
new digital controllers over
the
shutdown to fix the temperature drift problems
Karl Suss Aligner 1- PM scheduled for today
Karl Suss Aligner 2- Verification of BSA microscope to complete PM. Post
PM testing/adjusting to improve resolution
SVG Coaters- Note: SPR 3617 photoresist moved from Track 1(front) to
Track 2(back). Associated recipes
created in Recipe Manager and tested.
SPR 220-3 photoresist moved from
Track 2(back) to Track 1(front). Basic recipe created in Recipe
Manager, with
all needed variations to be created after computer repairs are completed.
Please check back in Coral for latest tool updates and current
equipment status.
Thanks... The Litho Team
*/Photolithography Area Status/*
*/Wednesday, January 05, 2011/*
*/General Information / Lab Activities/*
*/Exposure Tools/**//*
Status
Comments
Priority
ASML Stepper
*DOWN*
Annual PM in Progress
1
EVAlign
*UP*
EVAlign2
*UP*
EVG-Imprint
*UP*
Karl Suss 1
*UP*
Scheduled PM today
Karl Suss 2
*PROBLEM*
Post PM testing
*/Manual Coaters/*
Status
EVGSpraycoat
*DOWN*
Will not boot up
4
Headway
*UP*
Laurel
*DOWN*
Tool out for PM
3
*/Coaters/*
Process Status
SVGCoat
3612 Process
*Down*
Computer problem
2
3617 Process
*Down*
220-7 Process
*Down*
Optimizing process
SVGCoat2
3612 Process
*Up*
Intermittant transfer problem
955-0.7 Process
*Up*
220-3 Process
*Up*
*/Developers/*
Status
SVGDEV
*UP*
SVGDEV2
*UP*
*/Ovens / Hotplates/*
Status
BLUEM
*UP*
Blue M 90 C.
*UP*
Blue M 110 C
*UP*
Controller replaced during shutdown
Blue M 150 C
*UP*
Controller replaced during shutdown
Fusion
*DOWN*
Hotplate experiments
UV-Cure
*UP*
White-Oven
*UP*
YES Vapor Prime
*UP*
*/Hotplates- /*
Laurel-left
*UP*
Laurel- right
*UP*
Headway
*UP*
Torrey Pines- left
*UP*
90 Deg C
*UP*
115 Deg C
*UP*
Torrey Pines- Right
*UP*
*/Metrology/Inspection/*
Status
Alpha-Step 500
*UP*
Nanospec 2-Litho
*UP*
Nanospec 1-Etch
*UP*
P2 Profiler
*PROBLEM*
-11 stage error
*/Microscpoes-/*
#1 Leica/Analytical
*UP*
#2 Ergolux/Drytek2
*UP*
#3 Olympus/Litho
*UP*
#4 Nikon Optiphot/Litho
*UP*
#5 Nikon/Litho
*UP*
#6 Leitz/Bosch
*UP*
#7 Leitz/Diffusion
*UP*
#8 Olympus/Litho
*UP*
#9 Olympus/Litho
*UP*
*/Miscellaneous/*
Status
EVBond
*PROBLEM*
Left flag did not pull
KSBonder
*PROBLEM*
Leaking nitrogen hose
KSCoat
*UP*
Litho SRD
*UP*
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://snf.stanford.edu/pipermail/litho/attachments/20110105/8dd19e41/attachment.html>
More information about the litho
mailing list