From gsosa at stanford.edu Fri Jul 1 07:44:25 2011 From: gsosa at stanford.edu (Gary Sosa) Date: Fri, 01 Jul 2011 07:44:25 -0700 Subject: Morning Litho status report 7/1 Message-ID: <4E0DDD49.7020907@stanford.edu> Good morning All.... Here is the morning Litho status report. Karl Suss 2- Possible intensity sensor problem causing intensity shift. Need to troubleshoot. SVG Coat #2- User reports intermittent issues with the track. Will investigate on morning rounds EVG Bonder- Flag puller problem. Will check out the suspect bond fixture and repair as needed *Note* *1*: There will be an ASML Stepper maintenance training class from 6/13 through 7/1. During certain parts of the day the stepper will be unavailable as the trainers will be using the tool for the "hands-on" portion of the training class. There will be a large group gathered around the stepper during this time and the area around the stepper will be blocked off to normal traffic. Please observe the barricades during this time period. We apologize for the inconvenience and thank you for your patience and understanding. Please check back in Coral for the latest tool updates and current equipment status. Thanks... The Litho Team */Photolithography Area Status/* */Friday, July 01, 2011/* */General Information / Lab Activities/* ASML Stepper maintenance training class from 6/13 through 7/1 */Exposure Tools/**//* Status Comments Priority ASML Stepper *PROBLEM* Intermittent carrier inspection 4 EVAlign *PROBLEM* Non-criticals only 5 EVAlign2 *UP* EVG-Imprint *UP* Karl Suss 1 *UP* Karl Suss 2 *PROBLEM* Possible intensity sensor issue 1 */Manual Coaters/* Status EVGSpraycoat *UP* Headway *UP* Laurell *UP* */Coaters/* Process Status SVGCoat 3612 Process *Problem* Intermittent problems 2 220-3 Process *Up* 220-7 Process *Up* SVGCoat2 3612 Process *Up* 955-0.7 Process *Up* 3617 Process *Up* */Developers/* Status SVGDEV *UP* SVGDEV2 *UP* */Ovens / Hotplates/* Status BLUEM *UP* Blue M 90 C. *UP* Blue M 110 C *UP* Blue M 150 C *UP* Fusion *UP* UV-Cure *UP* White-Oven *UP* YES Vapor Prime *UP* */Hotplates- /* Laurel-left *UP* Laurel- right *UP* Headway *UP* Torrey Pines- left *UP* 90 Deg C *UP* 115 Deg C *UP* Torrey Pines- Right *UP* */Metrology/Inspection/* Status Alpha-Step 500 *UP* Nanospec 2-Litho *UP* Repaired by vendor Nanospec 1-Etch *UP* P2 Profiler *UP* */Microscpoes-/* #1 Leica/Analytical *UP* #2 Ergolux/Drytek2 *UP* #3 Olympus/Litho *UP* #4 Nikon Optiphot/Litho *UP* #5 Nikon/Litho *UP* #6 Leitz/Bosch *UP* #7 Leitz/Diffusion *UP* #8 Olympus/Litho *UP* #9 Olympus/Litho *UP* */Miscellaneous/* Status EVBond *PROBLEM* Flag puller problem 3 KSBonder *UP* KSCoat *UP* Litho SRD *UP* Mask Cleaner *UP* -------------- next part -------------- An HTML attachment was scrubbed... URL: From gsosa at stanford.edu Tue Jul 5 07:45:32 2011 From: gsosa at stanford.edu (Gary Sosa) Date: Tue, 05 Jul 2011 07:45:32 -0700 Subject: Morning Litho status report 7/5 Message-ID: <4E13238C.4080704@stanford.edu> Good morning All... Here is the morning Litho status report. No new problems to report. Please check back in Coral for latest tool updates and current equipment status. Thanks... The Litho Team */Photolithography Area Status/* */Tuesday, July 05, 2011/* */General Information / Lab Activities/* Mahnaz- Out today */Exposure Tools/* Status Comments Priority ASML Stepper *PROBLEM* Intermittant carrier inspection 2 EVAlign *PROBLEM* Non-criticals only 3 EVAlign2 *UP* EVG-Imprint *UP* Karl Suss 1 *UP* Karl Suss 2 *UP* */Manual Coaters/* Status EVGSpraycoat *UP* Headway *UP* Laurell *UP* */Coaters/* Process Status SVGCoat 3612 Process *Up* 220-3 Process *Up* 220-7 Process *Up* SVGCoat2 3612 Process *Up* 955-0.7 Process *Up* 3617 Process *Up* */Developers/* Status SVGDEV *UP* SVGDEV2 *UP* */Ovens / Hotplates/* Status BLUEM *UP* Blue M 90 C. *UP* Blue M 110 C *UP* Blue M 150 C *UP* Fusion *UP* UV-Cure *UP* White-Oven *UP* YES Vapor Prime *UP* */Hotplates- /* Laurel-left *UP* Laurel- right *UP* Headway *UP* Torrey Pines- left *UP* 90 Deg C *UP* 115 Deg C *UP* Torrey Pines- Right *UP* */Metrology/Inspection/* Status Alpha-Step 500 *UP* Nanospec 2-Litho *UP* Nanospec 1-Etch *UP* P2 Profiler *UP* */Microscpoes-/* #1 Leica/Analytical *UP* #2 Ergolux/Drytek2 *UP* #3 Olympus/Litho *UP* #4 Nikon Optiphot/Litho *UP* #5 Nikon/Litho *UP* #6 Leitz/Bosch *UP* #7 Leitz/Diffusion *UP* #8 Olympus/Litho *UP* #9 Olympus/Litho *UP* */Miscellaneous/* Status EVBond *PROBLEM* Flag puller problem 1 KSBonder *UP* KSCoat *UP* Litho SRD *UP* Mask Cleaner *UP* -------------- next part -------------- An HTML attachment was scrubbed... URL: From gsosa at stanford.edu Wed Jul 6 07:36:37 2011 From: gsosa at stanford.edu (Gary Sosa) Date: Wed, 06 Jul 2011 07:36:37 -0700 Subject: Morning Litho status report 7/6 Message-ID: <4E1472F5.2070407@stanford.edu> Good morning All... Here is the morning Litho status report. No new issues reported overnight. Please check back in Coral for latest tool updates and current equipment status. Thanks..... The Litho Team */Photolithography Area Status/* */Wednesday, July 06, 2011/* */General Information / Lab Activities/* EV Bonder- Changing to Quartz pressure plate today */Exposure Tools/**//* Status Comments Priority ASML Stepper *PROBLEM* Intermittant carrier inspection 2 EVAlign *PROBLEM* Non-criticals only 3 EVAlign2 *UP* EVG-Imprint *UP* Karl Suss 1 *UP* Karl Suss 2 *UP* */Manual Coaters/* Status EVGSpraycoat *UP* Headway *UP* Laurell *UP* */Coaters/* Process Status SVGCoat 3612 Process *Up* 220-3 Process *Up* 220-7 Process *Up* SVGCoat2 3612 Process *Up* 955-0.7 Process *Up* 3617 Process *Up* */Developers/* Status SVGDEV *UP* SVGDEV2 *UP* */Ovens / Hotplates/* Status BLUEM *UP* Blue M 90 C. *UP* Blue M 110 C *UP* Blue M 150 C *UP* Fusion *UP* UV-Cure *UP* White-Oven *UP* YES Vapor Prime *UP* */Hotplates- /* Laurel-left *UP* Laurel- right *UP* Headway *UP* Torrey Pines- left *UP* 90 Deg C *UP* 115 Deg C *UP* Torrey Pines- Right *UP* */Metrology/Inspection/* Status Alpha-Step 500 *UP* Nanospec 2-Litho *UP* Nanospec 1-Etch *UP* P2 Profiler *UP* */Microscpoes-/* #1 Leica/Analytical *UP* #2 Ergolux/Drytek2 *UP* #3 Olympus/Litho *UP* #4 Nikon Optiphot/Litho *UP* #5 Nikon/Litho *UP* #6 Leitz/Bosch *UP* #7 Leitz/Diffusion *UP* #8 Olympus/Litho *UP* #9 Olympus/Litho *UP* */Miscellaneous/* Status EVBond *PROBLEM* Flag puller problem 1 KSBonder *UP* KSCoat *UP* Litho SRD *UP* Mask Cleaner *UP* -------------- next part -------------- An HTML attachment was scrubbed... URL: From gsosa at stanford.edu Thu Jul 7 07:20:51 2011 From: gsosa at stanford.edu (Gary Sosa) Date: Thu, 07 Jul 2011 07:20:51 -0700 Subject: Morning Litho status report 7/7 Message-ID: <4E15C0C3.90501@stanford.edu> Good morning All.... Here is the morning Litho status report. EV Bonder- User reports a flag puller issue on one of the bond chucks. Will investigate Please check back in Coral for latest tool updates and current equipment status. Thanks... The Litho Team */Photolithography Area Status/* */Thursday, July 07, 2011/* */General Information / Lab Activities/* Mario- Out today and tomorrow */Exposure Tools/* Status Comments Priority ASML Stepper *PROBLEM* Intermittant carrier inspection 2 EVAlign *PROBLEM* Non-criticals only 3 EVAlign2 *UP* EVG-Imprint *UP* Karl Suss 1 *UP* Karl Suss 2 *UP* */Manual Coaters/* Status EVGSpraycoat *UP* Headway *UP* Laurell *UP* */Coaters/* Process Status SVGCoat 3612 Process *Up* 220-3 Process *Up* 220-7 Process *Up* SVGCoat2 3612 Process *Up* 955-0.7 Process *Up* 3617 Process *Up* */Developers/* Status SVGDEV *UP* SVGDEV2 *UP* */Ovens / Hotplates/* Status BLUEM *UP* Blue M 90 C. *UP* Blue M 110 C *UP* Blue M 150 C *UP* Fusion *UP* UV-Cure *UP* White-Oven *UP* YES Vapor Prime *UP* */Hotplates- /* Laurel-left *UP* Laurel- right *UP* Headway *UP* Torrey Pines- left *UP* 90 Deg C *UP* 115 Deg C *UP* Torrey Pines- Right *UP* */Metrology/Inspection/* Status Alpha-Step 500 *UP* Nanospec 2-Litho *UP* Nanospec 1-Etch *UP* P2 Profiler *UP* */Microscpoes-/* #1 Leica/Analytical *UP* #2 Ergolux/Drytek2 *UP* #3 Olympus/Litho *UP* #4 Nikon Optiphot/Litho *UP* #5 Nikon/Litho *UP* #6 Leitz/Bosch *UP* #7 Leitz/Diffusion *UP* #8 Olympus/Litho *UP* #9 Olympus/Litho *UP* */Miscellaneous/* Status EVBond *PROBLEM* Flag puller problem 1 KSBonder *UP* KSCoat *UP* Litho SRD *UP* Mask Cleaner *UP* -------------- next part -------------- An HTML attachment was scrubbed... URL: From gsosa at stanford.edu Fri Jul 8 07:18:20 2011 From: gsosa at stanford.edu (Gary Sosa) Date: Fri, 08 Jul 2011 07:18:20 -0700 Subject: Morning Litho status report 7/8 Message-ID: <4E1711AC.70909@stanford.edu> Good morning All... Here is the morning Litho status report: SVG Coat- User reports that the computer screen locked up. Will check out on morning rounds. EV Bonder- Changing pressure plate to steel. Will also check out flag pullers and bond chucks Please check back in Coral for latest tool updates and current equipment status. Thanks...... The Litho Team */Photolithography Area Status/* */Friday, July 08, 2011/* */General Information / Lab Activities/* Mario- Out today EV Bonder- Changing pressure plate to steel today */Exposure Tools/**//* Status Comments Priority ASML Stepper *PROBLEM* Intermittant carrier inspection 3 EVAlign *PROBLEM* Non-criticals only 4 EVAlign2 *UP* EVG-Imprint *UP* Karl Suss 1 *UP* Karl Suss 2 *UP* */Manual Coaters/* Status EVGSpraycoat *UP* Headway *UP* Laurell *UP* */Coaters/* Process Status SVGCoat 3612 Process *Problem* Computer locked up 1 220-3 Process *Up* 220-7 Process *Up* SVGCoat2 3612 Process *Up* 955-0.7 Process *Up* 3617 Process *Up* */Developers/* Status SVGDEV *UP* SVGDEV2 *UP* */Ovens / Hotplates/* Status BLUEM *UP* Blue M 90 C. *UP* Blue M 110 C *UP* Blue M 150 C *UP* Fusion *UP* UV-Cure *UP* White-Oven *UP* YES Vapor Prime *UP* */Hotplates- /* Laurel-left *UP* Laurel- right *UP* Headway *UP* Torrey Pines- left *UP* 90 Deg C *UP* 115 Deg C *UP* Torrey Pines- Right *UP* */Metrology/Inspection/* Status Alpha-Step 500 *UP* Nanospec 2-Litho *UP* Nanospec 1-Etch *UP* P2 Profiler *UP* */Microscpoes-/* #1 Leica/Analytical *UP* #2 Ergolux/Drytek2 *UP* #3 Olympus/Litho *UP* #4 Nikon Optiphot/Litho *UP* #5 Nikon/Litho *UP* #6 Leitz/Bosch *UP* #7 Leitz/Diffusion *UP* #8 Olympus/Litho *UP* #9 Olympus/Litho *UP* */Miscellaneous/* Status EVBond *PROBLEM* Flag puller problem 2 KSBonder *UP* KSCoat *UP* Litho SRD *UP* Mask Cleaner *UP* -------------- next part -------------- An HTML attachment was scrubbed... URL: From gsosa at stanford.edu Mon Jul 11 07:24:31 2011 From: gsosa at stanford.edu (Gary Sosa) Date: Mon, 11 Jul 2011 07:24:31 -0700 Subject: Morning Litho status report 7/11 Message-ID: <4E1B079F.8010504@stanford.edu> Good morning All...... Here is the morning Litho status report: ASML Stepper- Wafers stuck in tool. Will check out system and recover wafers. Yes Vapor Prime- Intermittent leak check failure. Will check out system on morning rounds. Please check back in Coral for latest tool updates and current equipment status. Thanks...... The Litho Team */Photolithography Area Status/* */Monday, July 11, 2011/* */General Information / Lab Activities/* */Exposure Tools/* Status Comments Priority ASML Stepper *DOWN* Wafers stuck in tool 1 EVAlign *PROBLEM* Non-criticals only 3 EVAlign2 *UP* EVG-Imprint *UP* Karl Suss 1 *UP* Karl Suss 2 *UP* */Manual Coaters/* Status EVGSpraycoat *UP* Headway *UP* Laurell *UP* */Coaters/* Process Status SVGCoat 3612 Process *Up* 220-3 Process *Up* 220-7 Process *Up* SVGCoat2 3612 Process *Up* 955-0.7 Process *Up* 3617 Process *Up* */Developers/* Status SVGDEV *UP* SVGDEV2 *UP* */Ovens / Hotplates/* Status BLUEM *UP* Blue M 90 C. *UP* Blue M 110 C *UP* Blue M 150 C *UP* Fusion *UP* UV-Cure *UP* White-Oven *UP* YES Vapor Prime *PROBLEM* Intermittent leak check failure 2 */Hotplates- /* Laurel-left *UP* Laurel- right *UP* Headway *UP* Torrey Pines- left *UP* 90 Deg C *UP* 115 Deg C *UP* Torrey Pines- Right *UP* */Metrology/Inspection/* Status Alpha-Step 500 *UP* Nanospec 2-Litho *UP* Nanospec 1-Etch *UP* P2 Profiler *UP* */Microscpoes-/* #1 Leica/Analytical *UP* #2 Ergolux/Drytek2 *UP* #3 Olympus/Litho *UP* #4 Nikon Optiphot/Litho *UP* #5 Nikon/Litho *UP* #6 Leitz/Bosch *UP* #7 Leitz/Diffusion *UP* #8 Olympus/Litho *UP* #9 Olympus/Litho *UP* */Miscellaneous/* Status EVBond *UP* KSBonder *UP* KSCoat *UP* Litho SRD *UP* Mask Cleaner *UP* -------------- next part -------------- An HTML attachment was scrubbed... URL: From gsosa at stanford.edu Tue Jul 12 07:18:09 2011 From: gsosa at stanford.edu (Gary Sosa) Date: Tue, 12 Jul 2011 07:18:09 -0700 Subject: Morning Litho status report 7/12 Message-ID: <4E1C57A1.7000109@stanford.edu> Good morning All..... Here is the morning Litho status report: No new problems reported overnight. Karl Suss Aligner #1- We are converting the tool to Deep UV mode as per a user request. The tool will be unavailable for standard wafer processing today until tool is converted back. Please check back in Coral for latest tool updates and current equipment status. Thanks.... The Litho Team */Photolithography Area Status/* */Tuesday, July 12, 2011/* */General Information / Lab Activities/* Converting Karl Suss #1 to Deep UV mode today */Exposure Tools/**//* Status Comments Priority ASML Stepper *PROBLEM* Intermittent carrier inspection 1 EVAlign *PROBLEM* Non-criticals only 2 EVAlign2 *UP* EVG-Imprint *UP* Karl Suss 1 *UP* Deep UV mode today Karl Suss 2 *UP* */Manual Coaters/* Status EVGSpraycoat *UP* Headway *UP* Laurell *UP* */Coaters/* Process Status SVGCoat 3612 Process *Up* 220-3 Process *Up* 220-7 Process *Up* SVGCoat2 3612 Process *Up* 955-0.7 Process *Up* 3617 Process *Up* */Developers/* Status SVGDEV *UP* SVGDEV2 *UP* */Ovens / Hotplates/* Status BLUEM *UP* Blue M 90 C. *UP* Blue M 110 C *UP* Blue M 150 C *UP* Fusion *UP* UV-Cure *UP* White-Oven *UP* YES Vapor Prime *UP* */Hotplates- /* Laurel-left *UP* Laurel- right *UP* Headway *UP* Torrey Pines- left *UP* 90 Deg C *UP* 115 Deg C *UP* Torrey Pines- Right *UP* */Metrology/Inspection/* Status Alpha-Step 500 *UP* Nanospec 2-Litho *UP* Nanospec 1-Etch *UP* P2 Profiler *UP* */Microscpoes-/* #1 Leica/Analytical *UP* #2 Ergolux/Drytek2 *UP* #3 Olympus/Litho *UP* #4 Nikon Optiphot/Litho *UP* #5 Nikon/Litho *UP* #6 Leitz/Bosch *UP* #7 Leitz/Diffusion *UP* #8 Olympus/Litho *UP* #9 Olympus/Litho *UP* */Miscellaneous/* Status EVBond *UP* KSBonder *UP* KSCoat *UP* Litho SRD *UP* Mask Cleaner *UP* -------------- next part -------------- An HTML attachment was scrubbed... URL: From gsosa at stanford.edu Wed Jul 13 07:42:27 2011 From: gsosa at stanford.edu (Gary Sosa) Date: Wed, 13 Jul 2011 07:42:27 -0700 Subject: Morning Litho status report 7/13 Message-ID: <4E1DAED3.3040604@stanford.edu> Good morning All.... Here is the morning Litho status report. Please check back in Coral for latest tool updates and current equipment status. Thanks.... The Litho Team */Photolithography Area Status/* */Wednesday, July 13, 2011/* */General Information / Lab Activities/* Mahnaz- Out at noon today */Exposure Tools/* Status Comments Priority ASML Stepper *PROBLEM* Intermittent carrier inspection 1 EVAlign *PROBLEM* Non-criticals only 2 EVAlign2 *UP* EVG-Imprint *UP* Karl Suss 1 *UP* Karl Suss 2 *UP* */Manual Coaters/* Status EVGSpraycoat *UP* Headway *UP* Laurell *UP* */Coaters/* Process Status SVGCoat 3612 Process *Up* 220-3 Process *Up* 220-7 Process *Up* SVGCoat2 3612 Process *Up* 955-0.7 Process *Up* 3617 Process *Up* */Developers/* Status SVGDEV *UP* SVGDEV2 *UP* */Ovens / Hotplates/* Status BLUEM *UP* Blue M 90 C. *UP* Blue M 110 C *UP* Blue M 150 C *UP* Fusion *UP* UV-Cure *UP* White-Oven *UP* YES Vapor Prime *UP* */Hotplates- /* Laurel-left *UP* Laurel- right *UP* Headway *UP* Torrey Pines- left *UP* 90 Deg C *UP* 115 Deg C *UP* Torrey Pines- Right *UP* */Metrology/Inspection/* Status Alpha-Step 500 *UP* Nanospec 2-Litho *UP* Nanospec 1-Etch *UP* P2 Profiler *UP* */Microscpoes-/* #1 Leica/Analytical *UP* #2 Ergolux/Drytek2 *UP* #3 Olympus/Litho *UP* #4 Nikon Optiphot/Litho *UP* #5 Nikon/Litho *UP* #6 Leitz/Bosch *UP* #7 Leitz/Diffusion *UP* #8 Olympus/Litho *UP* #9 Olympus/Litho *UP* */Miscellaneous/* Status EVBond *UP* KSBonder *UP* KSCoat *UP* Litho SRD *UP* Mask Cleaner *UP* -------------- next part -------------- An HTML attachment was scrubbed... URL: From vilanova at stanford.edu Thu Jul 14 08:34:10 2011 From: vilanova at stanford.edu (Eddy M Vilanova) Date: Thu, 14 Jul 2011 08:34:10 -0700 (PDT) Subject: Litho AM Daily Report 7/14/11 Message-ID: <1346768515.2010.1310657650486.JavaMail.root@zm05.stanford.edu> Good morning All.... Here is the morning Litho status report. Please check back in Coral for latest tool updates and current equipment status. Thanks.... The Litho Team Photolithography Area Status Thursday, July 14, 2011 General Information / Lab Activities Gary Sosa - Out at noon today Exposure Tools Status Comments Priority ASML Stepper PROBLEM Intermittent carrier inspection 1 EVAlign PROBLEM Non-criticals only 2 EVAlign2 UP EVG-Imprint UP Karl Suss 1 UP Karl Suss 2 UP Manual Coaters Status EVGSpraycoat UP Headway UP Laurell UP Coaters Process Status SVGCoat 3612 Process Up 220-3 Process Up 220-7 Process Up SVGCoat2 3612 Process Up 955-0.7 Process Up 3617 Process Up Developers Status SVGDEV UP SVGDEV2 UP Ovens / Hotplates Status BLUEM UP Blue M 90 C. UP Blue M 110 C UP Blue M 150 C UP Fusion UP UV-Cure UP White-Oven UP YES Vapor Prime UP Hotplates- Laurel-left UP Laurel- right UP Headway UP Torrey Pines- left UP 90 Deg C UP 115 Deg C UP Torrey Pines- Right UP Metrology/Inspection Status Alpha-Step 500 UP Nanospec 2-Litho UP Nanospec 1-Etch UP P2 Profiler UP Microscpoes- #1 Leica/Analytical UP #2 Ergolux/Drytek2 UP #3 Olympus/Litho UP From vilanova at stanford.edu Thu Jul 14 08:56:10 2011 From: vilanova at stanford.edu (Mario Vilanova) Date: Thu, 14 Jul 2011 08:56:10 -0700 Subject: Litho AM Daily Report 7/14/11 Message-ID: <4E1F119A.7060008@stanford.edu> Good morning All.... Here is the morning Litho status report. Please check back in Coral for latest tool updates and current equipment status. Thanks.... The Litho Team */Photolithography Area Status/* */Thursady , July 14, 2011/* */General Information / Lab Activities/* Gary Sosa - Out today */Exposure Tools/* Status Comments Priority ASML Stepper *PROBLEM* Intermittent carrier inspection 1 EVAlign *PROBLEM* Non-criticals only 2 EVAlign2 *UP* EVG-Imprint *UP* Karl Suss 1 *UP* Karl Suss 2 *UP* */Manual Coaters/* Status EVGSpraycoat *UP* Headway *UP* Laurell *UP* */Coaters/* Process Status SVGCoat 3612 Process *Up* 220-3 Process *Up* 220-7 Process *Up* SVGCoat2 3612 Process *Up* 955-0.7 Process *Up* 3617 Process *Up* */Developers/* Status SVGDEV *UP* SVGDEV2 *UP* */Ovens / Hotplates/* Status BLUEM *UP* Blue M 90 C. *UP* Blue M 110 C *UP* Blue M 150 C *UP* Fusion *UP* UV-Cure *UP* White-Oven *UP* YES Vapor Prime *UP* */Hotplates- /* Laurel-left *UP* Laurel- right *UP* Headway *UP* Torrey Pines- left *UP* 90 Deg C *UP* 115 Deg C *UP* Torrey Pines- Right *UP* */Metrology/Inspection/* Status Alpha-Step 500 *UP* Nanospec 2-Litho *UP* Nanospec 1-Etch *UP* P2 Profiler *UP* */Microscpoes-/* #1 Leica/Analytical *UP* #2 Ergolux/Drytek2 *UP* #3 Olympus/Litho *UP* #4 Nikon Optiphot/Litho *UP* #5 Nikon/Litho *UP* #6 Leitz/Bosch *UP* #7 Leitz/Diffusion *UP* #8 Olympus/Litho *UP* #9 Olympus/Litho *UP* */Miscellaneous/* Status EVBond *UP* KSBonder *UP* KSCoat *UP* Litho SRD *UP* Mask Cleaner *UP* -------------- next part -------------- An HTML attachment was scrubbed... URL: From vilanova at stanford.edu Fri Jul 15 07:14:14 2011 From: vilanova at stanford.edu (Mario Vilanova) Date: Fri, 15 Jul 2011 07:14:14 -0700 Subject: Litho AM Daily Status Report 7/15/11 Message-ID: <4E204B36.3090806@stanford.edu> Good morning All.... Here is the morning Litho status report. Please check back in Coral for latest tool updates and current equipment status. Thanks.... The Litho Team */Photolithography Area Status/* */Friday , July 15, 2011/* */General Information / Lab Activities/* Gary Sosa - Out today */Exposure Tools/* Status Comments Priority ASML Stepper *PROBLEM* Intermittent carrier inspection 1 EVAlign *PROBLEM* Non-criticals only 2 EVAlign2 *UP* EVG-Imprint *UP* Karl Suss 1 *UP* Karl Suss 2 *UP* */Manual Coaters/* Status EVGSpraycoat *UP* Headway *UP* Laurell *UP* */Coaters/* Process Status SVGCoat 3612 Process *Up* 220-3 Process *Up* 220-7 Process *Up* SVGCoat2 3612 Process *Up* 955-0.7 Process *Up* 3617 Process *Up* */Developers/* Status SVGDEV *UP* SVGDEV2 *UP* */Ovens / Hotplates/* Status BLUEM *UP* Blue M 90 C. *UP* Blue M 110 C *UP* Blue M 150 C *UP* Fusion *UP* UV-Cure *UP* White-Oven *UP* YES Vapor Prime *UP* */Hotplates- /* Laurel-left *UP* Laurel- right *UP* Headway *UP* Torrey Pines- left *UP* 90 Deg C *UP* 115 Deg C *UP* Torrey Pines- Right *UP* */Metrology/Inspection/* Status Alpha-Step 500 *UP* Nanospec 2-Litho *UP* Nanospec 1-Etch *UP* P2 Profiler *UP* */Microscpoes-/* #1 Leica/Analytical *UP* #2 Ergolux/Drytek2 *UP* #3 Olympus/Litho *UP* #4 Nikon Optiphot/Litho *UP* #5 Nikon/Litho *UP* #6 Leitz/Bosch *UP* #7 Leitz/Diffusion *UP* #8 Olympus/Litho *UP* #9 Olympus/Litho *UP* */Miscellaneous/* Status EVBond *UP* KSBonder *UP* KSCoat *UP* Litho SRD *UP* Mask Cleaner *UP* -------------- next part -------------- An HTML attachment was scrubbed... URL: From vilanova at stanford.edu Mon Jul 18 06:46:31 2011 From: vilanova at stanford.edu (Mario Vilanova) Date: Mon, 18 Jul 2011 06:46:31 -0700 Subject: Litho AM Daily Report 7/18/11 Message-ID: <4E243937.6010105@stanford.edu> Good morning All.... Here is the morning Litho status report. NO Equipment Reported Down During The Weekend. Please check back in Coral for latest tool updates and current equipment status. Thanks.... The Litho Team */Photolithography Area Status/* */Monday , July 18, 2011/* */General Information / Lab Activities/* */Exposure Tools/* Status Comments Priority ASML Stepper *PROBLEM* Intermittent carrier inspection 1 EVAlign *PROBLEM* Non-criticals only 2 EVAlign2 *UP* EVG-Imprint *UP* Karl Suss 1 *UP* Karl Suss 2 *UP* */Manual Coaters/* Status EVGSpraycoat *UP* Headway *UP* Laurell *UP* */Coaters/* Process Status SVGCoat 3612 Process *Up* 220-3 Process *Up* 220-7 Process *Up* SVGCoat2 3612 Process *Up* 955-0.7 Process *Up* 3617 Process *Up* */Developers/* Status SVGDEV *UP* SVGDEV2 *UP* */Ovens / Hotplates/* Status BLUEM *UP* Blue M 90 C. *UP* Blue M 110 C *UP* Blue M 150 C *UP* Fusion *UP* UV-Cure *UP* White-Oven *UP* YES Vapor Prime *UP* */Hotplates- /* Laurel-left *UP* Laurel- right *UP* Headway *UP* Torrey Pines- left *UP* 90 Deg C *UP* 115 Deg C *UP* Torrey Pines- Right *UP* */Metrology/Inspection/* Status Alpha-Step 500 *UP* Nanospec 2-Litho *UP* Nanospec 1-Etch *UP* P2 Profiler *UP* */Microscpoes-/* #1 Leica/Analytical *UP* #2 Ergolux/Drytek2 *UP* #3 Olympus/Litho *UP* #4 Nikon Optiphot/Litho *UP* #5 Nikon/Litho *UP* #6 Leitz/Bosch *UP* #7 Leitz/Diffusion *UP* #8 Olympus/Litho *UP* #9 Olympus/Litho *UP* */Miscellaneous/* Status EVBond *UP* KSBonder *UP* KSCoat *UP* Litho SRD *UP* Mask Cleaner *UP* -------------- next part -------------- An HTML attachment was scrubbed... URL: From gsosa at stanford.edu Fri Jul 22 08:07:09 2011 From: gsosa at stanford.edu (Gary Sosa) Date: Fri, 22 Jul 2011 08:07:09 -0700 Subject: Morning Litho status report 7/25 Message-ID: <4E29921D.3030501@stanford.edu> Good morning All- Here is the morning Litho status report *Note* *1*: There will be another ASML Stepper maintenance training class beginning on Monday 7/25. It is a 3 week class from 7/25 through 8/12. During certain parts of the day the stepper will be unavailable as the trainers will be using the tool for the "hands-on" portion of the training class. There will be a large group gathered around the stepper during this time and the area around the stepper will be blocked off to normal traffic. Please observe the barricades during this time period. We apologize for the inconvenience and thank you for your patience and understanding. Please check back in Coral for the latest tool updates and current equipment status. Thanks... The Litho Team */Photolithography Area Status/* */Friday, July 22, 2011/* */General Information / Lab Activities/* */Exposure Tools/**//* Status Comments Priority ASML Stepper *PROBLEM* Intermittent carrier inspection 1 EVAlign *UP* EVAlign2 *UP* EVG-Imprint *UP* Karl Suss 1 *UP* Karl Suss 2 *UP* */Manual Coaters/* Status EVGSpraycoat *UP* Headway *UP* Laurel *UP* */Coaters/* Process Status SVGCoat 3612 Process *Up* 3617 Process *Up* 220-7 Process *Up* SVGCoat2 3612 Process *Up* 955-0.7 Process *Up* 220-3 Process *Up* */Developers/* Status SVGDEV *UP* SVGDEV2 *UP* */Ovens / Hotplates/* Status BLUEM *UP* Blue M 90 C. *UP* Blue M 110 C *UP* Blue M 150 C *UP* Fusion *UP* UV-Cure *UP* White-Oven *UP* YES Vapor Prime *UP* */Hotplates- /* Laurel-left *UP* Laurel- right *UP* Headway *UP* Torrey Pines- left *UP* 90 Deg C *UP* 115 Deg C *UP* Torrey Pines- Right *UP* */Metrology/Inspection/* Status Alpha-Step 500 *UP* Nanospec 2-Litho *UP* Nanospec 1-Etch *UP* P2 Profiler *UP* */Microscpoes-/* #1 Leica/ *UP* #2 Ergolux/Drytek2 *UP* #3 Olympus/Litho *UP* #4 Nikon Optiphot/Litho *UP* #5 Nikon/Litho *UP* #6 Leitz/Bosch *UP* #7 Leitz/Diffusion *UP* #8 Olympus/Litho *UP* #9Olympus/Litho *UP* */Miscellaneous/* Status EVBond *PROBLEM* New graphite on order 2 KSBonder *UP* KSCoat *UP* Litho SRD *UP* Mask Cleaner *UP* -------------- next part -------------- An HTML attachment was scrubbed... URL: From gsosa at stanford.edu Mon Jul 25 07:08:51 2011 From: gsosa at stanford.edu (Gary Sosa) Date: Mon, 25 Jul 2011 07:08:51 -0700 Subject: Morning Litho status report 7/25 Message-ID: <4E2D78F3.2050109@stanford.edu> Good morning All- Here is the morning Litho status report Karl Suss 2- User reports that X micrometer is very tight. Will check out on morning rounds *Note* *1*: There will be another ASML Stepper maintenance training class beginning on Monday 7/25. It is a 3 week class from 7/25 through 8/12. During certain parts of the day the stepper will be unavailable as the trainers will be using the tool for the "hands-on" portion of the training class. There will be a large group gathered around the stepper during this time and the area around the stepper will be blocked off to normal traffic. Please observe the barricades during this time period. We apologize for the inconvenience and thank you for your patience and understanding. Please check back in Coral for the latest tool updates and current equipment status. Thanks... The Litho Team */Photolithography Area Status/* */Monday, July 25, 2011/* */General Information / Lab Activities/* ASML 3 week training class begins today Mario and Gary- 1st AID and CPR training today( 8:00AM to 3:00PM) */Exposure Tools/**//* Status Comments Priority ASML Stepper *PROBLEM* Intermittent carrier inspection 2 EVAlign *UP* EVAlign2 *UP* EVG-Imprint *UP* Karl Suss 1 *UP* Karl Suss 2 *PROBLEM* X micrometer problem 1 */Manual Coaters/* Status EVGSpraycoat *UP* Headway *UP* Laurel *UP* */Coaters/* Process Status SVGCoat 3612 Process *Up* 3617 Process *Up* 220-7 Process *Up* SVGCoat2 3612 Process *Up* 955-0.7 Process *Up* 220-3 Process *Up* */Developers/* Status SVGDEV *UP* SVGDEV2 *UP* */Ovens / Hotplates/* Status BLUEM *UP* Blue M 90 C. *UP* Blue M 110 C *UP* Blue M 150 C *UP* Fusion *UP* UV-Cure *UP* White-Oven *UP* YES Vapor Prime *UP* */Hotplates- /* Laurel-left *UP* Laurel- right *UP* Headway *UP* Torrey Pines- left *UP* 90 Deg C *UP* 115 Deg C *UP* Torrey Pines- Right *UP* */Metrology/Inspection/* Status Alpha-Step 500 *UP* Nanospec 2-Litho *UP* Nanospec 1-Etch *UP* P2 Profiler *UP* */Microscpoes-/* #1 Leica/ *UP* #2 Ergolux/Drytek2 *UP* #3 Olympus/Litho *UP* #4 Nikon Optiphot/Litho *UP* #5 Nikon/Litho *UP* #6 Leitz/Bosch *UP* #7 Leitz/Diffusion *UP* #8 Olympus/Litho *UP* #9Olympus/Litho *UP* */Miscellaneous/* Status EVBond *PROBLEM* New graphite on order 3 KSBonder *UP* KSCoat *UP* Litho SRD *UP* Mask Cleaner *UP* -------------- next part -------------- An HTML attachment was scrubbed... URL: From vilanova at stanford.edu Tue Jul 26 06:59:52 2011 From: vilanova at stanford.edu (Mario Vilanova) Date: Tue, 26 Jul 2011 06:59:52 -0700 Subject: Litho morning Status Report 7/26/2011 Message-ID: <4E2EC858.4030405@stanford.edu> Good morning All- Here is the morning Litho status report *Note* *1*: There will be another ASML Stepper maintenance training class beginning on Monday 7/25. It is a 3 week class from 7/25 through 8/12. During certain parts of the day the stepper will be unavailable as the trainers will be using the tool for the "hands-on" portion of the training class. There will be a large group gathered around the stepper during this time and the area around the stepper will be blocked off to normal traffic. Please observe the barricades during this time period. We apologize for the inconvenience and thank you for your patience and understanding. Please check back in Coral for the latest tool updates and current equipment status. Thanks... The Litho Team */Photolithography Area Status/* */Tuesday, July 26, 2011/* */General Information / Lab Activities/* ASML 3 week training class begins today */Exposure Tools/**//* Status Comments Priority ASML Stepper *PROBLEM* Intermittent carrier inspection 1 EVAlign *UP* EVAlign2 *UP* EVG-Imprint *UP* Karl Suss 1 *UP* Karl Suss 2 * UP* */Manual Coaters/* Status EVGSpraycoat *UP* Headway *UP* Laurel *UP* */Coaters/* Process Status SVGCoat 3612 Process *Up* 3617 Process *Up* 220-7 Process *Up* SVGCoat2 3612 Process *Up* 955-0.7 Process *Up* 220-3 Process *Up* */Developers/* Status SVGDEV *UP* SVGDEV2 *UP* */Ovens / Hotplates/* Status BLUEM *UP* Blue M 90 C. *UP* Blue M 110 C *UP* Blue M 150 C *UP* Fusion *UP* UV-Cure *UP* White-Oven *UP* YES Vapor Prime *UP* */Hotplates- /* Laurel-left *UP* Laurel- right *UP* Headway *UP* Torrey Pines- left *UP* 90 Deg C *UP* 115 Deg C *UP* Torrey Pines- Right *UP* */Metrology/Inspection/* Status Alpha-Step 500 *UP* Nanospec 2-Litho *UP* Nanospec 1-Etch *UP* P2 Profiler *UP* */Microscpoes-/* #1 Leica/ *UP* #2 Ergolux/Drytek2 *UP* #3 Olympus/Litho *UP* #4 Nikon Optiphot/Litho *UP* #5 Nikon/Litho *UP* #6 Leitz/Bosch *UP* #7 Leitz/Diffusion *UP* #8 Olympus/Litho *UP* #9Olympus/Litho *UP* */Miscellaneous/* Status EVBond *PROBLEM* New graphite on order 2 KSBonder *UP* KSCoat *UP* Litho SRD *UP* Mask Cleaner *UP* -------------- next part -------------- An HTML attachment was scrubbed... URL: From gsosa at stanford.edu Wed Jul 27 07:40:51 2011 From: gsosa at stanford.edu (Gary Sosa) Date: Wed, 27 Jul 2011 07:40:51 -0700 Subject: Morning Litho status report 7/27 Message-ID: <4E302373.9020605@stanford.edu> Good morning All- Here is the morning Litho status report No new problems reported overnight Note 1: There will be an ASML Stepper maintenance training class from 7/25 through 8/12. During certain parts of the day the stepper will be unavailable as the trainers will be using the tool for the "hands-on" portion of the training class. There will be a large group gathered around the stepper during this time and the area around the stepper will be blocked off to normal traffic. Please observe the barricades during this time period. We apologize for the inconvenience and thank you for your patience and understanding. Please check back in Coral for the latest tool updates and current equipment status. Thanks... The Litho Team */Photolithography Area Status/* */Wednesday, July 27, 2011/* */General Information / Lab Activities/* ASML 3 week training class in progress */Exposure Tools/**//* Status Comments Priority ASML Stepper *PROBLEM* Intermittent carrier inspection 1 EVAlign *UP* EVAlign2 *UP* EVG-Imprint *UP* Karl Suss 1 *UP* Karl Suss 2 *UP* */Manual Coaters/* Status EVGSpraycoat *UP* Headway *UP* Laurel *UP* */Coaters/* Process Status SVGCoat 3612 Process *Up* 3617 Process *Up* 220-7 Process *Up* SVGCoat2 3612 Process *Up* 955-0.7 Process *Up* 220-3 Process *Up* */Developers/* Status SVGDEV *UP* SVGDEV2 *UP* */Ovens / Hotplates/* Status BLUEM *UP* Blue M 90 C. *UP* Blue M 110 C *UP* Blue M 150 C *UP* Fusion *UP* UV-Cure *UP* White-Oven *UP* YES Vapor Prime *UP* */Hotplates- /* Laurel-left *UP* Laurel- right *UP* Headway *UP* Torrey Pines- left *UP* 90 Deg C *UP* 115 Deg C *UP* Torrey Pines- Right *UP* */Metrology/Inspection/* Status Alpha-Step 500 *UP* Nanospec 2-Litho *UP* Nanospec 1-Etch *UP* P2 Profiler *UP* */Microscpoes-/* #1 Leica/ *UP* #2 Ergolux/Drytek2 *UP* #3 Olympus/Litho *UP* #4 Nikon Optiphot/Litho *UP* #5 Nikon/Litho *UP* #6 Leitz/Bosch *UP* #7 Leitz/Diffusion *UP* #8 Olympus/Litho *UP* #9Olympus/Litho *UP* */Miscellaneous/* Status EVBond *PROBLEM* New graphite on order 2 KSBonder *UP* KSCoat *UP* Litho SRD *UP* Mask Cleaner *UP* -------------- next part -------------- An HTML attachment was scrubbed... URL: From gsosa at stanford.edu Thu Jul 28 07:30:34 2011 From: gsosa at stanford.edu (Gary Sosa) Date: Thu, 28 Jul 2011 07:30:34 -0700 Subject: Morning Litho status report 7/28 Message-ID: <4E31728A.3050007@stanford.edu> Good morning All- Here is the morning Litho status report SVG Coat 1- User reports that hotplate is dirty. Also user reports streaks in 7um coatings will check out on morning rounds. Note 1: There will be an ASML Stepper maintenance training class from 7/25 through 8/12. During certain parts of the day the stepper will be unavailable as the trainers will be using the tool for the "hands-on" portion of the training class. There will be a large group gathered around the stepper during this time and the area around the stepper will be blocked off to normal traffic. Please observe the barricades during this time period. We apologize for the inconvenience and thank you for your patience and understanding. Please check back in Coral for the latest tool updates and current equipment status. Thanks... The Litho Team */Photolithography Area Status/* */Thursday, July 28, 2011/* */General Information / Lab Activities/* ASML 3 week training class in progress */Exposure Tools/**//* Status Comments Priority ASML Stepper *PROBLEM* Intermittent carrier inspection 3 EVAlign *UP* EVAlign2 *UP* EVG-Imprint *UP* Karl Suss 1 *UP* Karl Suss 2 *UP* */Manual Coaters/* Status EVGSpraycoat *UP* Headway *UP* Laurel *UP* */Coaters/* Process Status SVGCoat 3612 Process *Problem* Hotplate is dirty 2 3617 Process *Problem* 220-7 Process *Problem* streaks in resist 1 SVGCoat2 3612 Process *Up* 955-0.7 Process *Up* 220-3 Process *Up* */Developers/* Status SVGDEV *UP* SVGDEV2 *UP* */Ovens / Hotplates/* Status BLUEM *UP* Blue M 90 C. *UP* Blue M 110 C *UP* Blue M 150 C *UP* Fusion *UP* UV-Cure *UP* White-Oven *UP* YES Vapor Prime *UP* */Hotplates- /* Laurel-left *UP* Laurel- right *UP* Headway *UP* Torrey Pines- left *UP* 90 Deg C *UP* 115 Deg C *UP* Torrey Pines- Right *UP* */Metrology/Inspection/* Status Alpha-Step 500 *UP* Nanospec 2-Litho *UP* Nanospec 1-Etch *UP* P2 Profiler *UP* */Microscpoes-/* #1 Leica/ *UP* #2 Ergolux/Drytek2 *UP* #3 Olympus/Litho *UP* #4 Nikon Optiphot/Litho *UP* #5 Nikon/Litho *UP* #6 Leitz/Bosch *UP* #7 Leitz/Diffusion *UP* #8 Olympus/Litho *UP* #9Olympus/Litho *UP* */Miscellaneous/* Status EVBond *PROBLEM* New graphite on order 4 KSBonder *UP* KSCoat *UP* Litho SRD *UP* Mask Cleaner *UP* -------------- next part -------------- An HTML attachment was scrubbed... URL: From gsosa at stanford.edu Fri Jul 29 07:15:53 2011 From: gsosa at stanford.edu (Gary Sosa) Date: Fri, 29 Jul 2011 07:15:53 -0700 Subject: Morning Litho status report 7/29 Message-ID: <4E32C099.1080904@stanford.edu> Good morning All- Here is the morning Litho status report No new issues reported overnight. EVG Bonder- Converting pressure plate to quartz today. Note 1: There will be an ASML Stepper maintenance training class from 7/25 through 8/12. During certain parts of the day the stepper will be unavailable as the trainers will be using the tool for the "hands-on" portion of the training class. There will be a large group gathered around the stepper during this time and the area around the stepper will be blocked off to normal traffic. Please observe the barricades during this time period. We apologize for the inconvenience and thank you for your patience and understanding. Please check back in Coral for the latest tool updates and current equipment status. Thanks... The Litho Team */Photolithography Area Status/* */Friday, July 29, 2011/* */General Information / Lab Activities/* ASML 3 week training class in progress EVG Bonder- Changing to Quartz pressure plate today */Exposure Tools/**//* Status Comments Priority ASML Stepper *PROBLEM* Intermittent carrier inspection 1 EVAlign *UP* EVAlign2 *UP* EVG-Imprint *UP* Karl Suss 1 *UP* Karl Suss 2 *UP* */Manual Coaters/* Status EVGSpraycoat *UP* Headway *UP* Laurel *UP* */Coaters/* Process Status SVGCoat 3612 Process *Up* 3617 Process *Up* 220-7 Process *Up* SVGCoat2 3612 Process *Up* 955-0.7 Process *Up* 220-3 Process *Up* */Developers/* Status SVGDEV *UP* SVGDEV2 *UP* */Ovens / Hotplates/* Status BLUEM *UP* Blue M 90 C. *UP* Blue M 110 C *UP* Blue M 150 C *UP* Fusion *UP* UV-Cure *UP* White-Oven *UP* YES Vapor Prime *UP* */Hotplates- /* Laurel-left *UP* Laurel- right *UP* Headway *UP* Torrey Pines- left *UP* 90 Deg C *UP* 115 Deg C *UP* Torrey Pines- Right *UP* */Metrology/Inspection/* Status Alpha-Step 500 *UP* Nanospec 2-Litho *UP* Nanospec 1-Etch *UP* P2 Profiler *UP* */Microscpoes-/* #1 Leica/ *UP* #2 Ergolux/Drytek2 *UP* #3 Olympus/Litho *UP* #4 Nikon Optiphot/Litho *UP* #5 Nikon/Litho *UP* #6 Leitz/Bosch *UP* #7 Leitz/Diffusion *UP* #8 Olympus/Litho *UP* #9Olympus/Litho *UP* */Miscellaneous/* Status EVBond *PROBLEM* New graphite on order 2 KSBonder *UP* KSCoat *UP* Litho SRD *UP* Mask Cleaner *UP* -------------- next part -------------- An HTML attachment was scrubbed... URL: