From gsosa at stanford.edu Wed Jun 1 07:47:51 2011 From: gsosa at stanford.edu (Gary Sosa) Date: Wed, 01 Jun 2011 07:47:51 -0700 Subject: Morning Litho status report 6/1 Message-ID: <4DE65117.9070702@stanford.edu> Good morning All..... Here is the morning Litho status report: No new problems reported overnight. *Note:* The Litho Help Desk volunteers are available during the following hours: Tuesday 10am-noon Liz Edwards Tuesday 1-3pm Nahid Harjee Wednesday 10am-noon Raja Jain Thursday 8:45-10:45am Rostam Dinyari Thursday 1:30-3:30pm J Provine They are an additional resource for the Litho area to assist users. They can help answer any processing or procedural questions and help solve problems and offer guidance. Please check back in Coral for the latest tool updates and current equipment status. Thanks..... The Litho Team */Photolithography Area Status/* */Wednesday, June 01, 2011/* */General Information / Lab Activities/* Litho Help Desk- Raja Jain: 10am - Noon */Exposure Tools/**//* Status Comments Priority ASML Stepper *PROBLEM* Intermittent carrier inspection problem 2 EVAlign *PROBLEM* Non-criticals only 1 EVAlign2 *UP* EVG-Imprint *UP* Karl Suss 1 *UP* Karl Suss 2 *UP* */Manual Coaters/* Status EVGSpraycoat *UP* Headway *UP* Laurell *UP* */Coaters/* Process Status SVGCoat 3612 Process *Up* 220-3 Process *Up* 220-7 Process *Up* SVGCoat2 3612 Process *Up* 955-0.7 Process *Up* 3617 Process *Up* */Developers/* Status SVGDEV *UP* SVGDEV2 *UP* */Ovens / Hotplates/* Status BLUEM *UP* Blue M 90 C. *UP* Blue M 110 C *UP* Blue M 150 C *UP* Fusion *UP* UV-Cure *UP* White-Oven *UP* YES Vapor Prime *UP* */Hotplates- /* Laurel-left *UP* Laurel- right *UP* Headway *UP* Torrey Pines- left *UP* 90 Deg C *UP* 115 Deg C *UP* Torrey Pines- Right *UP* */Metrology/Inspection/* Status Alpha-Step 500 *UP* Nanospec 2-Litho *UP* Nanospec 1-Etch *UP* P2 Profiler *UP* */Microscpoes-/* #1 Leica/Analytical *UP* #2 Ergolux/Drytek2 *UP* #3 Olympus/Litho *UP* #4 Nikon Optiphot/Litho *UP* #5 Nikon/Litho *UP* #6 Leitz/Bosch *UP* #7 Leitz/Diffusion *UP* #8 Olympus/Litho *UP* #9 Olympus/Litho *UP* */Miscellaneous/* Status EVBond *UP* KSBonder *UP* KSCoat *UP* Litho SRD *UP* Mask Cleaner *UP* -------------- next part -------------- An HTML attachment was scrubbed... URL: From gsosa at stanford.edu Thu Jun 2 07:29:14 2011 From: gsosa at stanford.edu (Gary Sosa) Date: Thu, 02 Jun 2011 07:29:14 -0700 Subject: Morning Litho status report 6/2 Message-ID: <4DE79E3A.3070800@stanford.edu> Good morning All..... Here is the morning Litho status report: No new problems reported overnight. *Note:* The Litho Help Desk volunteers are available during the following hours: Tuesday 10am-noon Liz Edwards Tuesday 1-3pm Nahid Harjee Wednesday 10am-noon Raja Jain Thursday 8:45-10:45am Rostam Dinyari Thursday 1:30-3:30pm J Provine They are an additional resource for the Litho area to assist users. They can help answer any processing or procedural questions and help solve problems and offer guidance. Please check back in Coral for the latest tool updates and current equipment status. Thanks..... The Litho Team */Photolithography Area Status/* */Thursday, June 02, 2011/* */General Information / Lab Activities/* Litho Help Desk- Rostam Dinyari: 8:45 - 10:45, J Provine: 1:30 - 3:30 PM */Exposure Tools/* Status Comments Priority ASML Stepper *PROBLEM* Intermittent carrier inspection problem 2 EVAlign *PROBLEM* Non-criticals only 1 EVAlign2 *UP* EVG-Imprint *UP* Karl Suss 1 *UP* Karl Suss 2 *UP* */Manual Coaters/* Status EVGSpraycoat *UP* Headway *UP* Laurell *UP* */Coaters/* Process Status SVGCoat 3612 Process *Up* 220-3 Process *Up* 220-7 Process *Up* SVGCoat2 3612 Process *Up* 955-0.7 Process *Up* 3617 Process *Up* */Developers/* Status SVGDEV *UP* SVGDEV2 *UP* */Ovens / Hotplates/* Status BLUEM *UP* Blue M 90 C. *UP* Blue M 110 C *UP* Blue M 150 C *UP* Fusion *UP* UV-Cure *UP* White-Oven *UP* YES Vapor Prime *UP* */Hotplates- /* Laurel-left *UP* Laurel- right *UP* Headway *UP* Torrey Pines- left *UP* 90 Deg C *UP* 115 Deg C *UP* Torrey Pines- Right *UP* */Metrology/Inspection/* Status Alpha-Step 500 *UP* Nanospec 2-Litho *UP* Nanospec 1-Etch *UP* P2 Profiler *UP* */Microscpoes-/* #1 Leica/Analytical *UP* #2 Ergolux/Drytek2 *UP* #3 Olympus/Litho *UP* #4 Nikon Optiphot/Litho *UP* #5 Nikon/Litho *UP* #6 Leitz/Bosch *UP* #7 Leitz/Diffusion *UP* #8 Olympus/Litho *UP* #9 Olympus/Litho *UP* */Miscellaneous/* Status EVBond *UP* KSBonder *UP* KSCoat *UP* Litho SRD *UP* Mask Cleaner *UP* -------------- next part -------------- An HTML attachment was scrubbed... URL: From gsosa at stanford.edu Fri Jun 3 07:29:08 2011 From: gsosa at stanford.edu (Gary Sosa) Date: Fri, 03 Jun 2011 07:29:08 -0700 Subject: Morning Litho status report 6/3 Message-ID: <4DE8EFB4.1040700@stanford.edu> Good morning All... Here is the morning Litho status report. SVG Dev- User reports that wafers are not centered on hotplate. Will check and correct problem on morning rounds Please check back in Coral for latest tool updates and current equipment status. Thanks.... The Litho Team */Photolithography Area Status/* */Friday, June 03, 2011/* */General Information / Lab Activities/* Mario- Out sick today */Exposure Tools/**//* Status Comments Priority ASML Stepper *PROBLEM* Intermittent carrier inspection problem 3 EVAlign *PROBLEM* Non-criticals only 2 EVAlign2 *UP* EVG-Imprint *UP* Karl Suss 1 *UP* Karl Suss 2 *UP* */Manual Coaters/* Status EVGSpraycoat *UP* Headway *UP* Laurell *UP* */Coaters/* Process Status SVGCoat 3612 Process *Up* 220-3 Process *Up* 220-7 Process *Up* SVGCoat2 3612 Process *Up* 955-0.7 Process *Up* 3617 Process *Up* */Developers/* Status SVGDEV *PROBLEM* Wafers not centered on Hotplate 1 SVGDEV2 *UP* */Ovens / Hotplates/* Status BLUEM *UP* Blue M 90 C. *UP* Blue M 110 C *UP* Blue M 150 C *UP* Fusion *UP* UV-Cure *UP* White-Oven *UP* YES Vapor Prime *UP* */Hotplates- /* Laurel-left *UP* Laurel- right *UP* Headway *UP* Torrey Pines- left *UP* 90 Deg C *UP* 115 Deg C *UP* Torrey Pines- Right *UP* */Metrology/Inspection/* Status Alpha-Step 500 *UP* Nanospec 2-Litho *UP* Nanospec 1-Etch *UP* P2 Profiler *UP* */Microscpoes-/* #1 Leica/Analytical *UP* #2 Ergolux/Drytek2 *UP* #3 Olympus/Litho *UP* #4 Nikon Optiphot/Litho *UP* #5 Nikon/Litho *UP* #6 Leitz/Bosch *UP* #7 Leitz/Diffusion *UP* #8 Olympus/Litho *UP* #9 Olympus/Litho *UP* */Miscellaneous/* Status EVBond *UP* KSBonder *UP* KSCoat *UP* Litho SRD *UP* Mask Cleaner *UP* -------------- next part -------------- An HTML attachment was scrubbed... URL: From gsosa at stanford.edu Mon Jun 6 07:29:05 2011 From: gsosa at stanford.edu (Gary Sosa) Date: Mon, 06 Jun 2011 07:29:05 -0700 Subject: Morning Litho status report 6/6 Message-ID: <4DECE431.6000508@stanford.edu> Good morning All... Here is the morning Litho status report: Karl Suss Align2- User reports a mask vacuum problem. Will check out on morning rounds SVG Coat1- User reports that the bakeplate is dirty. Will check out/clean on morning rounds Please check back in Coral for latest tool updates and current equipment status. Thanks.... The Litho Team */Photolithography Area Status/* */Monday, June 06, 2011/* */General Information / Lab Activities/* */Exposure Tools/* Status Comments Priority ASML Stepper *PROBLEM* Intermittent carrier inspection problem 4 EVAlign *PROBLEM* Non-criticals only 3 EVAlign2 *UP* EVG-Imprint *UP* Karl Suss 1 *UP* Karl Suss 2 *PROBLEM* Mask vacuum problem 2 */Manual Coaters/* Status EVGSpraycoat *UP* Headway *UP* Laurell *UP* */Coaters/* Process Status SVGCoat 3612 Process *Problem* Hotplate is dirty 1 220-3 Process *Up* 220-7 Process *Up* SVGCoat2 3612 Process *Up* 955-0.7 Process *Up* 3617 Process *Up* */Developers/* Status SVGDEV *UP* SVGDEV2 *UP* */Ovens / Hotplates/* Status BLUEM *UP* Blue M 90 C. *UP* Blue M 110 C *UP* Blue M 150 C *UP* Fusion *UP* UV-Cure *UP* White-Oven *UP* YES Vapor Prime *UP* */Hotplates- /* Laurel-left *UP* Laurel- right *UP* Headway *UP* Torrey Pines- left *UP* 90 Deg C *UP* 115 Deg C *UP* Torrey Pines- Right *UP* */Metrology/Inspection/* Status Alpha-Step 500 *UP* Nanospec 2-Litho *UP* Nanospec 1-Etch *UP* P2 Profiler *UP* */Microscpoes-/* #1 Leica/Analytical *UP* #2 Ergolux/Drytek2 *UP* #3 Olympus/Litho *UP* #4 Nikon Optiphot/Litho *UP* #5 Nikon/Litho *UP* #6 Leitz/Bosch *UP* #7 Leitz/Diffusion *UP* #8 Olympus/Litho *UP* #9 Olympus/Litho *UP* */Miscellaneous/* Status EVBond *UP* KSBonder *UP* KSCoat *UP* Litho SRD *UP* Mask Cleaner *UP* -------------- next part -------------- An HTML attachment was scrubbed... URL: From vilanova at stanford.edu Tue Jun 7 07:31:10 2011 From: vilanova at stanford.edu (Mario Vilanova) Date: Tue, 07 Jun 2011 07:31:10 -0700 Subject: Litho AM Daily Report 6/7/11 Message-ID: <4DEE362E.9070206@stanford.edu> Good morning All... Here is the morning Litho status report: No new problems reported overnight. Please check back in Coral for latest tool updates and current equipment status. Thanks.... The Litho Team */Photolithography Area Status/* */Tuesday , June 07, 2011/* */General Information / Lab Activities/* Gary - Out Sick Today :-( */Exposure Tools/* Status Comments Priority ASML Stepper *PROBLEM* Intermittent carrier inspection problem 1 EVAlign *PROBLEM* Non-criticals only 2 EVAlign2 *UP* EVG-Imprint *UP* Karl Suss 1 *UP* Karl Suss 2 * Up* */Manual Coaters/* Status EVGSpraycoat *UP* Headway *UP* Laurell *UP* */Coaters/* Process Status SVGCoat 3612 Process * Up* * Up* 220-3 Process *Up* 220-7 Process *Up* SVGCoat2 3612 Process *Up* 955-0.7 Process *Up* 3617 Process *Up* */Developers/* Status SVGDEV *UP* SVGDEV2 *UP* */Ovens / Hotplates/* Status BLUEM *UP* Blue M 90 C. *UP* Blue M 110 C *UP* Blue M 150 C *UP* Fusion *UP* UV-Cure *UP* White-Oven *UP* YES Vapor Prime *UP* */Hotplates- /* Laurel-left *UP* Laurel- right *UP* Headway *UP* Torrey Pines- left *UP* 90 Deg C *UP* 115 Deg C *UP* Torrey Pines- Right *UP* */Metrology/Inspection/* Status Alpha-Step 500 *UP* Nanospec 2-Litho *UP* Nanospec 1-Etch *UP* P2 Profiler *UP* */Microscpoes-/* #1 Leica/Analytical *UP* #2 Ergolux/Drytek2 *UP* #3 Olympus/Litho *UP* #4 Nikon Optiphot/Litho *UP* #5 Nikon/Litho *UP* #6 Leitz/Bosch *UP* #7 Leitz/Diffusion *UP* #8 Olympus/Litho *UP* #9 Olympus/Litho *UP* */Miscellaneous/* Status EVBond *UP* KSBonder *UP* KSCoat *UP* Litho SRD *UP* Mask Cleaner *UP* -------------- next part -------------- An HTML attachment was scrubbed... URL: From vilanova at stanford.edu Wed Jun 8 07:44:10 2011 From: vilanova at stanford.edu (Mario Vilanova) Date: Wed, 08 Jun 2011 07:44:10 -0700 Subject: Litho Daily Morning Report 6/8/11 Message-ID: <4DEF8ABA.6010609@stanford.edu> Good morning All... Here is the morning Litho status report: User Reports poor Focus On wafer ( RIght Side Suss # 1 ) Please check back in Coral for latest tool updates and current equipment status. Thanks.... The Litho Team */Photolithography Area Status/* */Wednesday , June 08 2011/* */General Information / Lab Activities/* Gary - Out Sick Today :-( */Exposure Tools/* Status Comments Priority ASML Stepper *PROBLEM* Intermittent carrier inspection problem 1 EVAlign *PROBLEM* Non-criticals only 3 EVAlign2 *UP* EVG-Imprint *UP* Karl Suss 1 * PROBLEM* Focus Issues On Right Side 2 Karl Suss 2 * Up* */Manual Coaters/* Status EVGSpraycoat *UP* Headway *UP* Laurell *UP* */Coaters/* Process Status SVGCoat 3612 Process * Up* * Up* 220-3 Process *Up* 220-7 Process *Up* SVGCoat2 3612 Process *Up* 955-0.7 Process *Up* 3617 Process *Up* */Developers/* Status SVGDEV *UP* SVGDEV2 *UP* */Ovens / Hotplates/* Status BLUEM *UP* Blue M 90 C. *UP* Blue M 110 C *UP* Blue M 150 C *UP* Fusion *UP* UV-Cure *UP* White-Oven *UP* YES Vapor Prime *UP* */Hotplates- /* Laurel-left *UP* Laurel- right *UP* Headway *UP* Torrey Pines- left *UP* 90 Deg C *UP* 115 Deg C *UP* Torrey Pines- Right *UP* */Metrology/Inspection/* Status Alpha-Step 500 *UP* Nanospec 2-Litho *UP* Nanospec 1-Etch *UP* P2 Profiler *UP* */Microscpoes-/* #1 Leica/Analytical *UP* #2 Ergolux/Drytek2 *UP* #3 Olympus/Litho *UP* #4 Nikon Optiphot/Litho *UP* #5 Nikon/Litho *UP* #6 Leitz/Bosch *UP* #7 Leitz/Diffusion *UP* #8 Olympus/Litho *UP* #9 Olympus/Litho *UP* */Miscellaneous/* Status EVBond *UP* KSBonder *UP* KSCoat *UP* Litho SRD *UP* Mask Cleaner *UP* -------------- next part -------------- An HTML attachment was scrubbed... URL: From gsosa at stanford.edu Thu Jun 9 07:44:30 2011 From: gsosa at stanford.edu (Gary Sosa) Date: Thu, 09 Jun 2011 07:44:30 -0700 Subject: Morning Litho status report 6/9 Message-ID: <4DF0DC4E.6020106@stanford.edu> Good morning All..... Here is the morning Litho status report: No new problems reported overnight. *Note:* The Litho Help Desk volunteers are available during the following hours: Tuesday 10am-noon Liz Edwards Tuesday 1-3pm Nahid Harjee Wednesday 10am-noon Raja Jain Thursday 8:45-10:45am Rostam Dinyari Thursday 1:30-3:30pm J Provine They are an additional resource for the Litho area to assist users. They can help answer any processing or procedural questions and help solve problems and offer guidance. Please check back in Coral for the latest tool updates and current equipment status. Thanks..... The Litho Team */Photolithography Area Status/* */Thursday, June 09, 2011/* */General Information / Lab Activities/* Litho Help Desk- Rostam Dinyari: 8:45 - 10:45, J Provine: 1:30 - 3:30 PM ASML- Day 2 of Monthly PM */Exposure Tools/**//* Status Comments Priority ASML Stepper *PROBLEM* Intermittent carrier inspection problem 2 EVAlign *PROBLEM* Non-criticals only 1 EVAlign2 *UP* EVG-Imprint *UP* Karl Suss 1 *UP* Karl Suss 2 *UP* */Manual Coaters/* Status EVGSpraycoat *UP* Headway *UP* Laurell *UP* */Coaters/* Process Status SVGCoat 3612 Process *Up* 220-3 Process *Up* 220-7 Process *Up* SVGCoat2 3612 Process *Up* 955-0.7 Process *Up* 3617 Process *Up* */Developers/* Status SVGDEV *UP* SVGDEV2 *UP* */Ovens / Hotplates/* Status BLUEM *UP* Blue M 90 C. *UP* Blue M 110 C *UP* Blue M 150 C *UP* Fusion *UP* UV-Cure *UP* White-Oven *UP* YES Vapor Prime *UP* */Hotplates- /* Laurel-left *UP* Laurel- right *UP* Headway *UP* Torrey Pines- left *UP* 90 Deg C *UP* 115 Deg C *UP* Torrey Pines- Right *UP* */Metrology/Inspection/* Status Alpha-Step 500 *UP* Nanospec 2-Litho *UP* Nanospec 1-Etch *UP* P2 Profiler *UP* */Microscpoes-/* #1 Leica/Analytical *UP* #2 Ergolux/Drytek2 *UP* #3 Olympus/Litho *UP* #4 Nikon Optiphot/Litho *UP* #5 Nikon/Litho *UP* #6 Leitz/Bosch *UP* #7 Leitz/Diffusion *UP* #8 Olympus/Litho *UP* #9 Olympus/Litho *UP* */Miscellaneous/* Status EVBond *UP* KSBonder *UP* KSCoat *UP* Litho SRD *UP* Mask Cleaner *UP* -------------- next part -------------- An HTML attachment was scrubbed... URL: From gsosa at stanford.edu Fri Jun 10 07:04:12 2011 From: gsosa at stanford.edu (Gary Sosa) Date: Fri, 10 Jun 2011 07:04:12 -0700 Subject: Morning Litho status report 6/10 Message-ID: <4DF2245C.7070607@stanford.edu> Good morning All.... Here is the morning Litho status report. ASML Stepper- User reports a wafer stuck in stepper. Will investigate and recover. Blue M Oven- Temperature control problems. Need to troubleshoot. Please check back in Coral for latest tool updates and current equipment status. Thanks... The Litho Team */Photolithography Area Status/* */Friday, June 10, 2011/* */General Information / Lab Activities/* */Exposure Tools/* Status Comments Priority ASML Stepper *DOWN* Wafer stuck in stepper 1 EVAlign *PROBLEM* Non-criticals only 3 EVAlign2 *UP* EVG-Imprint *UP* Karl Suss 1 *UP* Karl Suss 2 *UP* */Manual Coaters/* Status EVGSpraycoat *UP* Headway *UP* Laurell *UP* */Coaters/* Process Status SVGCoat 3612 Process *Up* 220-3 Process *Up* 220-7 Process *Up* SVGCoat2 3612 Process *Up* 955-0.7 Process *Up* 3617 Process *Up* */Developers/* Status SVGDEV *UP* SVGDEV2 *UP* */Ovens / Hotplates/* Status BLUEM *DOWN* Temp control problem 2 Blue M 90 C. *UP* Blue M 110 C *UP* Blue M 150 C *UP* Fusion *UP* UV-Cure *UP* White-Oven *UP* YES Vapor Prime *UP* */Hotplates- /* Laurel-left *UP* Laurel- right *UP* Headway *UP* Torrey Pines- left *UP* 90 Deg C *UP* 115 Deg C *UP* Torrey Pines- Right *UP* */Metrology/Inspection/* Status Alpha-Step 500 *UP* Nanospec 2-Litho *UP* Nanospec 1-Etch *UP* P2 Profiler *UP* */Microscpoes-/* #1 Leica/Analytical *UP* #2 Ergolux/Drytek2 *UP* #3 Olympus/Litho *UP* #4 Nikon Optiphot/Litho *UP* #5 Nikon/Litho *UP* #6 Leitz/Bosch *UP* #7 Leitz/Diffusion *UP* #8 Olympus/Litho *UP* #9 Olympus/Litho *UP* */Miscellaneous/* Status EVBond *UP* KSBonder *UP* KSCoat *UP* Litho SRD *UP* Mask Cleaner *UP* -------------- next part -------------- An HTML attachment was scrubbed... URL: From gsosa at stanford.edu Mon Jun 13 07:55:30 2011 From: gsosa at stanford.edu (Gary Sosa) Date: Mon, 13 Jun 2011 07:55:30 -0700 Subject: Morning Litho status report 6/13 Message-ID: <4DF624E2.6080801@stanford.edu> Good morning All...... Here is the morning Litho status report: Blue M Oven- Down, temperature control problem. Replacement and setup of new controller in progress Karl Suss 2- User reports no light on left-side camera. Will check out on morning rounds. Note: There will be an ASML Stepper maintenance training class from 6/13 through 7/1. During certain parts of the day the stepper will be unavailable as the trainers will be using the tool for the "hands-on" portion of the training class. There will be a large group gathered around the stepper during this time and the area around the stepper will be blocked off to normal traffic. Please observe the barricades during this time period. We apologize for the inconvenience and thank you for your patience and understanding. Please check back in Coral for the latest tool updates and current equipment status. Thanks... The Litho Team */Photolithography Area Status/* */Monday, June 13, 2011/* */General Information / Lab Activities/* ASML Stepper maintenance training class from 6/13 through 7/1 */Exposure Tools/**//* Status Comments Priority ASML Stepper *PROBLEM* Intermittant carrier inspection 3 EVAlign *PROBLEM* Non-criticals only 4 EVAlign2 *UP* EVG-Imprint *UP* Karl Suss 1 *UP* Karl Suss 2 *PROBLEM* No light on left camera 2 */Manual Coaters/* Status EVGSpraycoat *UP* Headway *UP* Laurell *UP* */Coaters/* Process Status SVGCoat 3612 Process *Up* 220-3 Process *Up* 220-7 Process *Up* SVGCoat2 3612 Process *Up* 955-0.7 Process *Up* 3617 Process *Up* */Developers/* Status SVGDEV *UP* SVGDEV2 *UP* */Ovens / Hotplates/* Status BLUEM *DOWN* Temp control problem 1 Blue M 90 C. *UP* Blue M 110 C *UP* Blue M 150 C *UP* Fusion *UP* UV-Cure *UP* White-Oven *UP* YES Vapor Prime *UP* */Hotplates- /* Laurel-left *UP* Laurel- right *UP* Headway *UP* Torrey Pines- left *UP* 90 Deg C *UP* 115 Deg C *UP* Torrey Pines- Right *UP* */Metrology/Inspection/* Status Alpha-Step 500 *UP* Nanospec 2-Litho *UP* Nanospec 1-Etch *UP* P2 Profiler *UP* */Microscpoes-/* #1 Leica/Analytical *UP* #2 Ergolux/Drytek2 *UP* #3 Olympus/Litho *UP* #4 Nikon Optiphot/Litho *UP* #5 Nikon/Litho *UP* #6 Leitz/Bosch *UP* #7 Leitz/Diffusion *UP* #8 Olympus/Litho *UP* #9 Olympus/Litho *UP* */Miscellaneous/* Status EVBond *UP* KSBonder *UP* KSCoat *UP* Litho SRD *UP* Mask Cleaner *UP* -------------- next part -------------- An HTML attachment was scrubbed... URL: From gsosa at stanford.edu Tue Jun 14 07:30:31 2011 From: gsosa at stanford.edu (Gary Sosa) Date: Tue, 14 Jun 2011 07:30:31 -0700 Subject: Morning Litho status report 6/14 Message-ID: <4DF77087.8060901@stanford.edu> Good morning All.... Here is the morning Litho status report. Karl Suss 1- User reports mask vacuum problem. Will investigate on morning rounds. *Note* *1*: There will be an ASML Stepper maintenance training class from 6/13 through 7/1. During certain parts of the day the stepper will be unavailable as the trainers will be using the tool for the "hands-on" portion of the training class. There will be a large group gathered around the stepper during this time and the area around the stepper will be blocked off to normal traffic. Please observe the barricades during this time period. We apologize for the inconvenience and thank you for your patience and understanding. *Note 2:* The Litho Help Desk volunteers are available during the following hours: Tuesday 10am-noon Liz Edwards Tuesday 1-3pm Nahid Harjee Wednesday 10am-noon Raja Jain Thursday 8:45-10:45am Rostam Dinyari Thursday 1:30-3:30pm J Provine They are an additional resource for the Litho area to assist users. They can help answer any processing or procedural questions and help solve problems and offer guidance. Please check back in Coral for the latest tool updates and current equipment status. Thanks... The Litho Team */Photolithography Area Status/* */Tuesday, June 14, 2011/* */General Information / Lab Activities/* ASML Stepper maintenance training class from 6/13 through 7/1 Litho Help Desk- Liz Edwards: 10am - Noon, Nahid Harjee: 1 - 3 PM */Exposure Tools/* Status Comments Priority ASML Stepper *PROBLEM* Intermittant carrier inspection 2 EVAlign *PROBLEM* Non-criticals only 3 EVAlign2 *UP* EVG-Imprint *UP* Karl Suss 1 *PROBLEM* Mask vacuum problem 1 Karl Suss 2 *UP* */Manual Coaters/* Status EVGSpraycoat *UP* Headway *UP* Laurell *UP* */Coaters/* Process Status SVGCoat 3612 Process *Up* 220-3 Process *Up* 220-7 Process *Up* SVGCoat2 3612 Process *Up* 955-0.7 Process *Up* 3617 Process *Up* */Developers/* Status SVGDEV *UP* SVGDEV2 *UP* */Ovens / Hotplates/* Status BLUEM *UP* Blue M 90 C. *UP* Blue M 110 C *UP* Blue M 150 C *UP* Fusion *UP* UV-Cure *UP* White-Oven *UP* YES Vapor Prime *UP* */Hotplates- /* Laurel-left *UP* Laurel- right *UP* Headway *UP* Torrey Pines- left *UP* 90 Deg C *UP* 115 Deg C *UP* Torrey Pines- Right *UP* */Metrology/Inspection/* Status Alpha-Step 500 *UP* Nanospec 2-Litho *UP* Nanospec 1-Etch *UP* P2 Profiler *UP* */Microscpoes-/* #1 Leica/Analytical *UP* #2 Ergolux/Drytek2 *UP* #3 Olympus/Litho *UP* #4 Nikon Optiphot/Litho *UP* #5 Nikon/Litho *UP* #6 Leitz/Bosch *UP* #7 Leitz/Diffusion *UP* #8 Olympus/Litho *UP* #9 Olympus/Litho *UP* */Miscellaneous/* Status EVBond *UP* KSBonder *UP* KSCoat *UP* Litho SRD *UP* Mask Cleaner *UP* -------------- next part -------------- An HTML attachment was scrubbed... URL: From gsosa at stanford.edu Wed Jun 15 07:52:16 2011 From: gsosa at stanford.edu (Gary Sosa) Date: Wed, 15 Jun 2011 07:52:16 -0700 Subject: Morning Litho status report 6/15 Message-ID: <4DF8C720.6000704@stanford.edu> Good morning All.... Here is the morning Litho status report. No new problems reported overnight. *Note* *1*: There will be an ASML Stepper maintenance training class from 6/13 through 7/1. During certain parts of the day the stepper will be unavailable as the trainers will be using the tool for the "hands-on" portion of the training class. There will be a large group gathered around the stepper during this time and the area around the stepper will be blocked off to normal traffic. Please observe the barricades during this time period. We apologize for the inconvenience and thank you for your patience and understanding. *Note 2:* The Litho Help Desk volunteers are available during the following hours: Tuesday 10am-noon Liz Edwards Tuesday 1-3pm Nahid Harjee Wednesday 10am-noon Raja Jain Thursday 8:45-10:45am Rostam Dinyari Thursday 1:30-3:30pm J Provine They are an additional resource for the Litho area to assist users. They can help answer any processing or procedural questions and help solve problems and offer guidance. Please check back in Coral for the latest tool updates and current equipment status. Thanks... The Litho Team */Photolithography Area Status/* */Wednesday, June 15, 2011/* */General Information / Lab Activities/* ASML Stepper maintenance training class from 6/13 through 7/1 Litho Help Desk- Raja Jain: 10am - Noon */Exposure Tools/**//* Status Comments Priority ASML Stepper *PROBLEM* Intermittant carrier inspection 1 EVAlign *PROBLEM* Non-criticals only 2 EVAlign2 *UP* EVG-Imprint *UP* Karl Suss 1 *UP* Karl Suss 2 *UP* */Manual Coaters/* Status EVGSpraycoat *UP* Headway *UP* Laurell *UP* */Coaters/* Process Status SVGCoat 3612 Process *Up* 220-3 Process *Up* 220-7 Process *Up* SVGCoat2 3612 Process *Up* 955-0.7 Process *Up* 3617 Process *Up* */Developers/* Status SVGDEV *UP* SVGDEV2 *UP* */Ovens / Hotplates/* Status BLUEM *UP* Blue M 90 C. *UP* Blue M 110 C *UP* Blue M 150 C *UP* Fusion *UP* UV-Cure *UP* White-Oven *UP* YES Vapor Prime *UP* */Hotplates- /* Laurel-left *UP* Laurel- right *UP* Headway *UP* Torrey Pines- left *UP* 90 Deg C *UP* 115 Deg C *UP* Torrey Pines- Right *UP* */Metrology/Inspection/* Status Alpha-Step 500 *UP* Nanospec 2-Litho *UP* Nanospec 1-Etch *UP* P2 Profiler *UP* */Microscpoes-/* #1 Leica/Analytical *UP* #2 Ergolux/Drytek2 *UP* #3 Olympus/Litho *UP* #4 Nikon Optiphot/Litho *UP* #5 Nikon/Litho *UP* #6 Leitz/Bosch *UP* #7 Leitz/Diffusion *UP* #8 Olympus/Litho *UP* #9 Olympus/Litho *UP* */Miscellaneous/* Status EVBond *UP* KSBonder *UP* KSCoat *UP* Litho SRD *UP* Mask Cleaner *UP* -------------- next part -------------- An HTML attachment was scrubbed... URL: From gsosa at stanford.edu Thu Jun 16 07:34:31 2011 From: gsosa at stanford.edu (Gary Sosa) Date: Thu, 16 Jun 2011 07:34:31 -0700 Subject: Morning Litho status report 6/16 Message-ID: <4DFA1477.3070501@stanford.edu> Good morning All.... Here is the morning Litho status report. No new problems reported overnight. *Note* *1*: There will be an ASML Stepper maintenance training class from 6/13 through 7/1. During certain parts of the day the stepper will be unavailable as the trainers will be using the tool for the "hands-on" portion of the training class. There will be a large group gathered around the stepper during this time and the area around the stepper will be blocked off to normal traffic. Please observe the barricades during this time period. We apologize for the inconvenience and thank you for your patience and understanding. *Note 2:* The Litho Help Desk volunteers are available during the following hours: Tuesday 10am-noon Liz Edwards Tuesday 1-3pm Nahid Harjee Wednesday 10am-noon Raja Jain Thursday 8:45-10:45am Rostam Dinyari Thursday 1:30-3:30pm J Provine They are an additional resource for the Litho area to assist users. They can help answer any processing or procedural questions and help solve problems and offer guidance. Please check back in Coral for the latest tool updates and current equipment status. Thanks... The Litho Team */Photolithography Area Status/* */Thursday, June 16, 2011/* */General Information / Lab Activities/* ASML Stepper maintenance training class from 6/13 through 7/1 Litho Help Desk- Rostam Dinyari: 8:45 - 10:45, J Provine: 1:30 - 3:30 PM Gary- Out at Noon */Exposure Tools/* Status Comments Priority ASML Stepper *PROBLEM* Intermittant carrier inspection 2 EVAlign *PROBLEM* Non-criticals only 3 EVAlign2 *UP* EVG-Imprint *UP* Karl Suss 1 *UP* Karl Suss 2 *UP* */Manual Coaters/* Status EVGSpraycoat *UP* Headway *UP* Laurell *UP* */Coaters/* Process Status SVGCoat 3612 Process *Up* 220-3 Process *Up* 220-7 Process *Up* SVGCoat2 3612 Process *Up* 955-0.7 Process *Up* 3617 Process *Up* */Developers/* Status SVGDEV *UP* SVGDEV2 *UP* */Ovens / Hotplates/* Status BLUEM *UP* Blue M 90 C. *UP* Blue M 110 C *UP* Blue M 150 C *UP* Fusion *UP* UV-Cure *UP* White-Oven *UP* YES Vapor Prime *UP* */Hotplates- /* Laurel-left *UP* Laurel- right *UP* Headway *UP* Torrey Pines- left *UP* 90 Deg C *UP* 115 Deg C *UP* Torrey Pines- Right *UP* */Metrology/Inspection/* Status Alpha-Step 500 *UP* Nanospec 2-Litho *UP* Nanospec 1-Etch *UP* P2 Profiler *UP* */Microscpoes-/* #1 Leica/Analytical *UP* #2 Ergolux/Drytek2 *UP* #3 Olympus/Litho *UP* #4 Nikon Optiphot/Litho *UP* #5 Nikon/Litho *UP* #6 Leitz/Bosch *UP* #7 Leitz/Diffusion *UP* #8 Olympus/Litho *UP* #9 Olympus/Litho *UP* */Miscellaneous/* Status EVBond *UP* KSBonder *UP* KSCoat *UP* Litho SRD *UP* Mask Cleaner *UP* -------------- next part -------------- An HTML attachment was scrubbed... URL: From vilanova at stanford.edu Fri Jun 17 07:34:25 2011 From: vilanova at stanford.edu (Mario Vilanova) Date: Fri, 17 Jun 2011 07:34:25 -0700 Subject: Lito Daily Morning Report 6/17/11 Message-ID: <4DFB65F1.3060509@stanford.edu> Good morning All.... Here is the morning Litho status report. No new problems reported overnight. *Note* *1*: There will be an ASML Stepper maintenance training class from 6/13 through 7/1. During certain parts of the day the stepper will be unavailable as the trainers will be using the tool for the "hands-on" portion of the training class. There will be a large group gathered around the stepper during this time and the area around the stepper will be blocked off to normal traffic. Please observe the barricades during this time period. We apologize for the inconvenience and thank you for your patience and understanding. *Note 2:* The Litho Help Desk volunteers are available during the following hours: Tuesday 10am-noon Liz Edwards Tuesday 1-3pm Nahid Harjee Wednesday 10am-noon Raja Jain Thursday 8:45-10:45am Rostam Dinyari Thursday 1:30-3:30pm J Provine They are an additional resource for the Litho area to assist users. They can help answer any processing or procedural questions and help solve problems and offer guidance. Please check back in Coral for the latest tool updates and current equipment status. Thanks... The Litho Team */Photolithography Area Status/* */Friday , June 17, 2011/* */General Information / Lab Activities/* ASML Stepper maintenance training class from 6/13 through 7/1 */Exposure Tools/* Status Comments Priority ASML Stepper *PROBLEM* Intermittant carrier inspection 1 EVAlign *PROBLEM* Non-criticals only 2 EVAlign2 *UP* EVG-Imprint *UP* Karl Suss 1 *UP* Karl Suss 2 *UP* */Manual Coaters/* Status EVGSpraycoat *UP* Headway *UP* Laurell *UP* */Coaters/* Process Status SVGCoat 3612 Process *Up* 220-3 Process *Up* 220-7 Process *Up* SVGCoat2 3612 Process *Up* 955-0.7 Process *Up* 3617 Process *Up* */Developers/* Status SVGDEV *UP* SVGDEV2 *UP* */Ovens / Hotplates/* Status BLUEM *UP* Blue M 90 C. *UP* Blue M 110 C *UP* Blue M 150 C *UP* Fusion *UP* UV-Cure *UP* White-Oven *UP* YES Vapor Prime *UP* */Hotplates- /* Laurel-left *UP* Laurel- right *UP* Headway *UP* Torrey Pines- left *UP* 90 Deg C *UP* 115 Deg C *UP* Torrey Pines- Right *UP* */Metrology/Inspection/* Status Alpha-Step 500 *UP* Nanospec 2-Litho *UP* Nanospec 1-Etch *UP* P2 Profiler *UP* */Microscpoes-/* #1 Leica/Analytical *UP* #2 Ergolux/Drytek2 *UP* #3 Olympus/Litho *UP* #4 Nikon Optiphot/Litho *UP* #5 Nikon/Litho *UP* #6 Leitz/Bosch *UP* #7 Leitz/Diffusion *UP* #8 Olympus/Litho *UP* #9 Olympus/Litho *UP* */Miscellaneous/* Status EVBond *UP* KSBonder *UP* KSCoat *UP* Litho SRD *UP* Mask Cleaner *UP* -------------- next part -------------- An HTML attachment was scrubbed... URL: From gsosa at stanford.edu Mon Jun 20 07:19:46 2011 From: gsosa at stanford.edu (Gary Sosa) Date: Mon, 20 Jun 2011 07:19:46 -0700 Subject: Morning Litho status report 6/20 Message-ID: <4DFF5702.9050405@stanford.edu> Good morning All.... Here is the morning Litho status report. No new problems reported over the weekend. *Note* *1*: There will be an ASML Stepper maintenance training class from 6/13 through 7/1. During certain parts of the day the stepper will be unavailable as the trainers will be using the tool for the "hands-on" portion of the training class. There will be a large group gathered around the stepper during this time and the area around the stepper will be blocked off to normal traffic. Please observe the barricades during this time period. We apologize for the inconvenience and thank you for your patience and understanding. Please check back in Coral for the latest tool updates and current equipment status. Thanks... The Litho Team */Photolithography Area Status/* */Monday, June 20, 2011/* */General Information / Lab Activities/* ASML Stepper maintenance training class from 6/13 through 7/1 Mahnaz- Vacation 6/20 through 6/22 */Exposure Tools/**//* Status Comments Priority ASML Stepper *PROBLEM* Intermittant carrier inspection 2 EVAlign *PROBLEM* Non-criticals only 3 EVAlign2 *UP* EVG-Imprint *UP* Karl Suss 1 *UP* Karl Suss 2 *UP* */Manual Coaters/* Status EVGSpraycoat *UP* Headway *UP* Laurell *UP* */Coaters/* Process Status SVGCoat 3612 Process *Up* 220-3 Process *Up* 220-7 Process *Up* SVGCoat2 3612 Process *Up* 955-0.7 Process *Up* 3617 Process *Up* */Developers/* Status SVGDEV *UP* SVGDEV2 *UP* */Ovens / Hotplates/* Status BLUEM *UP* Blue M 90 C. *UP* Blue M 110 C *UP* Blue M 150 C *UP* Fusion *UP* UV-Cure *UP* White-Oven *UP* YES Vapor Prime *UP* */Hotplates- /* Laurel-left *UP* Laurel- right *UP* Headway *UP* Torrey Pines- left *UP* 90 Deg C *UP* 115 Deg C *UP* Torrey Pines- Right *UP* */Metrology/Inspection/* Status Alpha-Step 500 *UP* Nanospec 2-Litho *UP* Nanospec 1-Etch *UP* P2 Profiler *UP* */Microscpoes-/* #1 Leica/Analytical *UP* #2 Ergolux/Drytek2 *UP* #3 Olympus/Litho *UP* #4 Nikon Optiphot/Litho *UP* #5 Nikon/Litho *UP* #6 Leitz/Bosch *UP* #7 Leitz/Diffusion *UP* #8 Olympus/Litho *UP* #9 Olympus/Litho *UP* */Miscellaneous/* Status EVBond *UP* KSBonder *UP* KSCoat *UP* Litho SRD *UP* Mask Cleaner *UP* -------------- next part -------------- An HTML attachment was scrubbed... URL: From gsosa at stanford.edu Tue Jun 21 07:31:34 2011 From: gsosa at stanford.edu (Gary Sosa) Date: Tue, 21 Jun 2011 07:31:34 -0700 Subject: Morning Litho status report 6/21 Message-ID: <4E00AB46.7050300@stanford.edu> Good morning All.... Here is the morning Litho status report. SVG Coat1- User reports poor spin on 220-7 resist. Defect in center of wafer. Will check out on morning rounds. *Note* *1*: There will be an ASML Stepper maintenance training class from 6/13 through 7/1. During certain parts of the day the stepper will be unavailable as the trainers will be using the tool for the "hands-on" portion of the training class. There will be a large group gathered around the stepper during this time and the area around the stepper will be blocked off to normal traffic. Please observe the barricades during this time period. We apologize for the inconvenience and thank you for your patience and understanding. Please check back in Coral for the latest tool updates and current equipment status. Thanks... The Litho Team */Photolithography Area Status/* */Tuesday, June 21, 2011/* */General Information / Lab Activities/* ASML Stepper maintenance training class from 6/13 through 7/1 Mahnaz- Vacation 6/20 through 6/22 */Exposure Tools/* Status Comments Priority ASML Stepper *PROBLEM* Intermittant carrier inspection 2 EVAlign *PROBLEM* Non-criticals only 3 EVAlign2 *UP* EVG-Imprint *UP* Karl Suss 1 *UP* Karl Suss 2 *UP* */Manual Coaters/* Status EVGSpraycoat *UP* Headway *UP* Laurell *UP* */Coaters/* Process Status SVGCoat 3612 Process *Up* 220-3 Process *Up* 220-7 Process *Problem* Poor spin 1 SVGCoat2 3612 Process *Up* 955-0.7 Process *Up* 3617 Process *Up* */Developers/* Status SVGDEV *UP* SVGDEV2 *UP* */Ovens / Hotplates/* Status BLUEM *UP* Blue M 90 C. *UP* Blue M 110 C *UP* Blue M 150 C *UP* Fusion *UP* UV-Cure *UP* White-Oven *UP* YES Vapor Prime *UP* */Hotplates- /* Laurel-left *UP* Laurel- right *UP* Headway *UP* Torrey Pines- left *UP* 90 Deg C *UP* 115 Deg C *UP* Torrey Pines- Right *UP* */Metrology/Inspection/* Status Alpha-Step 500 *UP* Nanospec 2-Litho *UP* Nanospec 1-Etch *UP* P2 Profiler *UP* */Microscpoes-/* #1 Leica/Analytical *UP* #2 Ergolux/Drytek2 *UP* #3 Olympus/Litho *UP* #4 Nikon Optiphot/Litho *UP* #5 Nikon/Litho *UP* #6 Leitz/Bosch *UP* #7 Leitz/Diffusion *UP* #8 Olympus/Litho *UP* #9 Olympus/Litho *UP* */Miscellaneous/* Status EVBond *UP* KSBonder *UP* KSCoat *UP* Litho SRD *UP* Mask Cleaner *UP* -------------- next part -------------- An HTML attachment was scrubbed... URL: From gsosa at stanford.edu Wed Jun 22 07:15:44 2011 From: gsosa at stanford.edu (Gary Sosa) Date: Wed, 22 Jun 2011 07:15:44 -0700 Subject: Morning Litho status report 6/22 Message-ID: <4E01F910.8010402@stanford.edu> Good morning All.... Here is the morning Litho status report. SVG Coat1- The coater carriage is not moving in or out. Need to troubleshoot and repair SVG Dev2- User reports that stage is not moving. Will check out on morning rounds. EVG Bonder- User reports a flag puller problem. Will check out on morning rounds.. *Note* *1*: There will be an ASML Stepper maintenance training class from 6/13 through 7/1. During certain parts of the day the stepper will be unavailable as the trainers will be using the tool for the "hands-on" portion of the training class. There will be a large group gathered around the stepper during this time and the area around the stepper will be blocked off to normal traffic. Please observe the barricades during this time period. We apologize for the inconvenience and thank you for your patience and understanding. Please check back in Coral for the latest tool updates and current equipment status. Thanks... The Litho Team */Photolithography Area Status/* */Wednesday, June 22, 2011/* */General Information / Lab Activities/* ASML Stepper maintenance training class from 6/13 through 7/1 Mahnaz- Vacation 6/20 through 6/22 */Exposure Tools/**//* Status Comments Priority ASML Stepper *PROBLEM* Intermittant carrier inspection 5 EVAlign *PROBLEM* Non-criticals only 6 EVAlign2 *UP* EVG-Imprint *UP* Karl Suss 1 *UP* Karl Suss 2 *UP* */Manual Coaters/* Status EVGSpraycoat *UP* Headway *UP* Laurell *UP* */Coaters/* Process Status SVGCoat 3612 Process *Down* Coater carriage problem 1 220-3 Process *Up* 220-7 Process *Problem* Poor spin 3 SVGCoat2 3612 Process *Up* 955-0.7 Process *Up* 3617 Process *Up* */Developers/* Status SVGDEV *UP* SVGDEV2 *DOWN* System not working 2 */Ovens / Hotplates/* Status BLUEM *UP* Blue M 90 C. *UP* Blue M 110 C *UP* Blue M 150 C *UP* Fusion *UP* UV-Cure *UP* White-Oven *UP* YES Vapor Prime *UP* */Hotplates- /* Laurel-left *UP* Laurel- right *UP* Headway *UP* Torrey Pines- left *UP* 90 Deg C *UP* 115 Deg C *UP* Torrey Pines- Right *UP* */Metrology/Inspection/* Status Alpha-Step 500 *UP* Nanospec 2-Litho *UP* Nanospec 1-Etch *UP* P2 Profiler *UP* */Microscpoes-/* #1 Leica/Analytical *UP* #2 Ergolux/Drytek2 *UP* #3 Olympus/Litho *UP* #4 Nikon Optiphot/Litho *UP* #5 Nikon/Litho *UP* #6 Leitz/Bosch *UP* #7 Leitz/Diffusion *UP* #8 Olympus/Litho *UP* #9 Olympus/Litho *UP* */Miscellaneous/* Status EVBond *PROBLEM* Flag puller problem 4 KSBonder *UP* KSCoat *UP* Litho SRD *UP* Mask Cleaner *UP* -------------- next part -------------- An HTML attachment was scrubbed... URL: From gsosa at stanford.edu Thu Jun 23 08:12:12 2011 From: gsosa at stanford.edu (Gary Sosa) Date: Thu, 23 Jun 2011 08:12:12 -0700 Subject: Morning Litho status report 6/23 Message-ID: <4E0357CC.6050500@stanford.edu> Good morning All... Here is the morning Litho status report. SVG Coat1- User reports a poor spin problem. Dot in center of wafer. Will investigate on morning rounds. Please check back in Coral for latest tool updates and current equipment status. Thanks.... The Litho Team */Photolithography Area Status/* */Thursday, June 23, 2011/* */General Information / Lab Activities/* ASML Stepper maintenance training class from 6/13 through 7/1 */Exposure Tools/* Status Comments Priority ASML Stepper *PROBLEM* Intermittant carrier inspection 3 EVAlign *PROBLEM* Non-criticals only 4 EVAlign2 *UP* EVG-Imprint *UP* Karl Suss 1 *UP* Karl Suss 2 *UP* */Manual Coaters/* Status EVGSpraycoat *UP* Headway *UP* Laurell *UP* */Coaters/* Process Status SVGCoat 3612 Process *Problem* Poor spin 1 220-3 Process *Up* 220-7 Process *Problem* Poor spin 2 SVGCoat2 3612 Process *Up* 955-0.7 Process *Up* 3617 Process *Up* */Developers/* Status SVGDEV *UP* SVGDEV2 *UP* */Ovens / Hotplates/* Status BLUEM *UP* Blue M 90 C. *UP* Blue M 110 C *UP* Blue M 150 C *UP* Fusion *UP* UV-Cure *UP* White-Oven *UP* YES Vapor Prime *UP* */Hotplates- /* Laurel-left *UP* Laurel- right *UP* Headway *UP* Torrey Pines- left *UP* 90 Deg C *UP* 115 Deg C *UP* Torrey Pines- Right *UP* */Metrology/Inspection/* Status Alpha-Step 500 *UP* Nanospec 2-Litho *UP* Nanospec 1-Etch *UP* P2 Profiler *UP* */Microscpoes-/* #1 Leica/Analytical *UP* #2 Ergolux/Drytek2 *UP* #3 Olympus/Litho *UP* #4 Nikon Optiphot/Litho *UP* #5 Nikon/Litho *UP* #6 Leitz/Bosch *UP* #7 Leitz/Diffusion *UP* #8 Olympus/Litho *UP* #9 Olympus/Litho *UP* */Miscellaneous/* Status EVBond *UP* KSBonder *UP* KSCoat *UP* Litho SRD *UP* Mask Cleaner *UP* -------------- next part -------------- An HTML attachment was scrubbed... URL: From vilanova at stanford.edu Fri Jun 24 07:26:07 2011 From: vilanova at stanford.edu (Mario Vilanova) Date: Fri, 24 Jun 2011 07:26:07 -0700 Subject: Am Daily Litho Report 6/24/11 Message-ID: <4E049E7F.60607@stanford.edu> Good morning All... Here is the morning Litho status report. SVG Developer 1- Wafer Loading problem . Will investigate on morning rounds. Please check back in Coral for latest tool updates and current equipment status. Thanks.... The Litho Team */Photolithography Area Status/* */Friday June 24, 2011/* */General Information / Lab Activities/* ASML Stepper maintenance training class from 6/13 through 7/1 */Exposure Tools/* Status Comments Priority ASML Stepper *PROBLEM* Intermittant carrier inspection 2 EVAlign *PROBLEM* Non-criticals only 3 EVAlign2 *UP* EVG-Imprint *UP* Karl Suss 1 *UP* Karl Suss 2 *UP* */Manual Coaters/* Status EVGSpraycoat *UP* Headway *UP* Laurell *UP* */Coaters/* Process Status SVGCoat 3612 Process * Up* 220-3 Process *Up* 220-7 Process * Up* SVGCoat2 3612 Process *Up* 955-0.7 Process *Up* 3617 Process *Up* */Developers/* Status SVGDEV * PROBLEM* 1 SVGDEV2 *UP* */Ovens / Hotplates/* Status BLUEM *UP* Blue M 90 C. *UP* Blue M 110 C *UP* Blue M 150 C *UP* Fusion *UP* UV-Cure *UP* White-Oven *UP* YES Vapor Prime *UP* */Hotplates- /* Laurel-left *UP* Laurel- right *UP* Headway *UP* Torrey Pines- left *UP* 90 Deg C *UP* 115 Deg C *UP* Torrey Pines- Right *UP* */Metrology/Inspection/* Status Alpha-Step 500 *UP* Nanospec 2-Litho *UP* Nanospec 1-Etch *UP* P2 Profiler *UP* */Microscpoes-/* #1 Leica/Analytical *UP* #2 Ergolux/Drytek2 *UP* #3 Olympus/Litho *UP* #4 Nikon Optiphot/Litho *UP* #5 Nikon/Litho *UP* #6 Leitz/Bosch *UP* #7 Leitz/Diffusion *UP* #8 Olympus/Litho *UP* #9 Olympus/Litho *UP* */Miscellaneous/* Status EVBond *UP* KSBonder *UP* KSCoat *UP* Litho SRD *UP* Mask Cleaner *UP* -------------- next part -------------- An HTML attachment was scrubbed... URL: From gsosa at stanford.edu Mon Jun 27 07:22:39 2011 From: gsosa at stanford.edu (Gary Sosa) Date: Mon, 27 Jun 2011 07:22:39 -0700 Subject: Morning Litho status report 6/27 Message-ID: <4E08922F.70409@stanford.edu> Good morning All.... Here is the morning Litho status report. Nanospec 2(Litho)- Wavelength counter not working. Will check out on morning rounds. Karl Suss 1- Scheduled downtime today. 6 month PM to be performed by vendor. *Note* *1*: There will be an ASML Stepper maintenance training class from 6/13 through 7/1. During certain parts of the day the stepper will be unavailable as the trainers will be using the tool for the "hands-on" portion of the training class. There will be a large group gathered around the stepper during this time and the area around the stepper will be blocked off to normal traffic. Please observe the barricades during this time period. We apologize for the inconvenience and thank you for your patience and understanding. Please check back in Coral for the latest tool updates and current equipment status. Thanks... The Litho Team */Photolithography Area Status/* */Monday, June 27, 2011/* */General Information / Lab Activities/* ASML Stepper maintenance training class from 6/13 through 7/1 */Exposure Tools/**//* Status Comments Priority ASML Stepper *PROBLEM* Intermittant carrier inspection 2 EVAlign *PROBLEM* Non-criticals only 3 EVAlign2 *UP* EVG-Imprint *UP* Karl Suss 1 *UP* 6 Month PM today Karl Suss 2 *UP* */Manual Coaters/* Status EVGSpraycoat *UP* Headway *UP* Laurell *UP* */Coaters/* Process Status SVGCoat 3612 Process *Up* 220-3 Process *Up* 220-7 Process *Up* SVGCoat2 3612 Process *Up* 955-0.7 Process *Up* 3617 Process *Up* */Developers/* Status SVGDEV *UP* SVGDEV2 *UP* */Ovens / Hotplates/* Status BLUEM *UP* Blue M 90 C. *UP* Blue M 110 C *UP* Blue M 150 C *UP* Fusion *UP* UV-Cure *UP* White-Oven *UP* YES Vapor Prime *UP* */Hotplates- /* Laurel-left *UP* Laurel- right *UP* Headway *UP* Torrey Pines- left *UP* 90 Deg C *UP* 115 Deg C *UP* Torrey Pines- Right *UP* */Metrology/Inspection/* Status Alpha-Step 500 *UP* Nanospec 2-Litho *DOWN* Wavelength counter problem 1 Nanospec 1-Etch *UP* P2 Profiler *UP* */Microscpoes-/* #1 Leica/Analytical *UP* #2 Ergolux/Drytek2 *UP* #3 Olympus/Litho *UP* #4 Nikon Optiphot/Litho *UP* #5 Nikon/Litho *UP* #6 Leitz/Bosch *UP* #7 Leitz/Diffusion *UP* #8 Olympus/Litho *UP* #9 Olympus/Litho *UP* */Miscellaneous/* Status EVBond *UP* KSBonder *UP* KSCoat *UP* Litho SRD *UP* Mask Cleaner *UP* -------------- next part -------------- An HTML attachment was scrubbed... URL: From gsosa at stanford.edu Tue Jun 28 07:23:49 2011 From: gsosa at stanford.edu (Gary Sosa) Date: Tue, 28 Jun 2011 07:23:49 -0700 Subject: Morning Litho status report 6/28 Message-ID: <4E09E3F5.1080201@stanford.edu> Good morning All.... Here is the morning Litho status report. Nanospec 2(Litho)- Wavelength counter not working. PO for service call placed. ETA for vendor is today or tomorrow.. Karl Suss 2- Scheduled downtime today. 6 month PM to be performed by vendor. Note 1: There will be an ASML Stepper maintenance training class from 6/13 through 7/1. During certain parts of the day the stepper will be unavailable as the trainers will be using the tool for the "hands-on" portion of the training class. There will be a large group gathered around the stepper during this time and the area around the stepper will be blocked off to normal traffic. Please observe the barricades during this time period. We apologize for the inconvenience and thank you for your patience and understanding. Please check back in Coral for the latest tool updates and current equipment status. Thanks... The Litho Team */Photolithography Area Status/* */Tuesday, June 28, 2011/* */General Information / Lab Activities/* ASML Stepper maintenance training class from 6/13 through 7/1 */Exposure Tools/* Status Comments Priority ASML Stepper *PROBLEM* Intermittant carrier inspection 2 EVAlign *PROBLEM* Non-criticals only 3 EVAlign2 *UP* EVG-Imprint *UP* Karl Suss 1 *UP* Karl Suss 2 *UP* 6 Month PM today */Manual Coaters/* Status EVGSpraycoat *UP* Headway *UP* Laurell *UP* */Coaters/* Process Status SVGCoat 3612 Process *Up* 220-3 Process *Up* 220-7 Process *Up* SVGCoat2 3612 Process *Up* 955-0.7 Process *Up* 3617 Process *Up* */Developers/* Status SVGDEV *UP* SVGDEV2 *UP* */Ovens / Hotplates/* Status BLUEM *UP* Blue M 90 C. *UP* Blue M 110 C *UP* Blue M 150 C *UP* Fusion *UP* UV-Cure *UP* White-Oven *UP* YES Vapor Prime *UP* */Hotplates- /* Laurel-left *UP* Laurel- right *UP* Headway *UP* Torrey Pines- left *UP* 90 Deg C *UP* 115 Deg C *UP* Torrey Pines- Right *UP* */Metrology/Inspection/* Status Alpha-Step 500 *UP* Nanospec 2-Litho *DOWN* Wavelength counter problem 1 Nanospec 1-Etch *UP* P2 Profiler *UP* */Microscpoes-/* #1 Leica/Analytical *UP* #2 Ergolux/Drytek2 *UP* #3 Olympus/Litho *UP* #4 Nikon Optiphot/Litho *UP* #5 Nikon/Litho *UP* #6 Leitz/Bosch *UP* #7 Leitz/Diffusion *UP* #8 Olympus/Litho *UP* #9 Olympus/Litho *UP* */Miscellaneous/* Status EVBond *UP* KSBonder *UP* KSCoat *UP* Litho SRD *UP* Mask Cleaner *UP* -------------- next part -------------- An HTML attachment was scrubbed... URL: From vilanova at stanford.edu Wed Jun 29 07:43:05 2011 From: vilanova at stanford.edu (Mario Vilanova) Date: Wed, 29 Jun 2011 07:43:05 -0700 Subject: Litho Am Daily Report 6/29/11 Message-ID: <4E0B39F9.90109@stanford.edu> Good morning All.... Here is the morning Litho status report. Nanospec 2(Litho)- Wavelength counter not working. PO for service call placed. ETA for Vendor is Today.. . Note 1: There will be an ASML Stepper maintenance training class from 6/13 through 7/1. During certain parts of the day the stepper will be unavailable as the trainers will be using the tool for the "hands-on" portion of the training class. There will be a large group gathered around the stepper during this time and the area around the stepper will be blocked off to normal traffic. Please observe the barricades during this time period. We apologize for the inconvenience and thank you for your patience and understanding. Please check back in Coral for the latest tool updates and current equipment status. Thanks... The Litho Team */Photolithography Area Status/* */Wednesday , June 29, 2011/* */General Information / Lab Activities/* ASML Stepper maintenance training class from 6/13 through 7/1 Gary Out Sick Today */Exposure Tools/* Status Comments Priority ASML Stepper *Shutdown * broken Shutter, Will be replaced today 2 EVAlign *PROBLEM* Non-criticals only 3 EVAlign2 *UP* EVG-Imprint *UP* Karl Suss 1 *UP* Karl Suss 2 *UP* */Manual Coaters/* Status EVGSpraycoat *UP* Headway *UP* Laurell *UP* */Coaters/* Process Status SVGCoat 3612 Process *Up* 220-3 Process *Up* 220-7 Process *Up* SVGCoat2 3612 Process *Up* 955-0.7 Process *Up* 3617 Process *Up* */Developers/* Status SVGDEV *UP* SVGDEV2 *UP* */Ovens / Hotplates/* Status BLUEM *UP* Blue M 90 C. *UP* Blue M 110 C *UP* Blue M 150 C *UP* Fusion *UP* UV-Cure *UP* White-Oven *UP* YES Vapor Prime *UP* */Hotplates- /* Laurel-left *UP* Laurel- right *UP* Headway *UP* Torrey Pines- left *UP* 90 Deg C *UP* 115 Deg C *UP* Torrey Pines- Right *UP* */Metrology/Inspection/* Status Alpha-Step 500 *UP* Nanospec 2-Litho *DOWN* Wavelength counter problem 1 Nanospec 1-Etch *UP* P2 Profiler *UP* */Microscpoes-/* #1 Leica/Analytical *UP* #2 Ergolux/Drytek2 *UP* #3 Olympus/Litho *UP* #4 Nikon Optiphot/Litho *UP* #5 Nikon/Litho *UP* #6 Leitz/Bosch *UP* #7 Leitz/Diffusion *UP* #8 Olympus/Litho *UP* #9 Olympus/Litho *UP* */Miscellaneous/* Status EVBond *UP* KSBonder *UP* KSCoat *UP* Litho SRD *UP* Mask Cleaner *UP* -------------- next part -------------- An HTML attachment was scrubbed... URL: From vilanova at stanford.edu Thu Jun 30 07:27:37 2011 From: vilanova at stanford.edu (Mario Vilanova) Date: Thu, 30 Jun 2011 07:27:37 -0700 Subject: MOrning Litho Status Report 6/30/11 Message-ID: <4E0C87D9.2050803@stanford.edu> Good morning All.... Here is the morning Litho status report. No new problems reported over the weekend. *Note* *1*: There will be an ASML Stepper maintenance training class from 6/13 through 7/1. During certain parts of the day the stepper will be unavailable as the trainers will be using the tool for the "hands-on" portion of the training class. There will be a large group gathered around the stepper during this time and the area around the stepper will be blocked off to normal traffic. Please observe the barricades during this time period. We apologize for the inconvenience and thank you for your patience and understanding. Please check back in Coral for the latest tool updates and current equipment status. Thanks... The Litho Team */Photolithography Area Status/* */Thursday , June 30, 2011/* */General Information / Lab Activities/* ASML Stepper maintenance training class from 6/13 through 7/1 Gary Out Sick */Exposure Tools/**//* Status Comments Priority ASML Stepper *PROBLEM* Intermittant carrier inspection 2 EVAlign *PROBLEM* Non-criticals only 3 EVAlign2 *UP* EVG-Imprint *UP* Karl Suss 1 *UP* Karl Suss 2 *UP* */Manual Coaters/* Status EVGSpraycoat *UP* Headway *UP* Laurell *UP* */Coaters/* Process Status SVGCoat 3612 Process *Up* 220-3 Process *Up* 220-7 Process *Up* SVGCoat2 3612 Process *Up* 955-0.7 Process *Up* 3617 Process *Up* */Developers/* Status SVGDEV *UP* SVGDEV2 *UP* */Ovens / Hotplates/* Status BLUEM *UP* Blue M 90 C. *UP* Blue M 110 C *UP* Blue M 150 C *UP* Fusion *UP* UV-Cure *UP* White-Oven *UP* YES Vapor Prime *UP* */Hotplates- /* Laurel-left *UP* Laurel- right *UP* Headway *UP* Torrey Pines- left *UP* 90 Deg C *UP* 115 Deg C *UP* Torrey Pines- Right *UP* */Metrology/Inspection/* Status Alpha-Step 500 *UP* Nanospec 2-Litho *DOWN * Vendor Repairing the Part. 1 Nanospec 1-Etch *UP* P2 Profiler *UP* */Microscpoes-/* #1 Leica/Analytical *UP* #2 Ergolux/Drytek2 *UP* #3 Olympus/Litho *UP* #4 Nikon Optiphot/Litho *UP* #5 Nikon/Litho *UP* #6 Leitz/Bosch *UP* #7 Leitz/Diffusion *UP* #8 Olympus/Litho *UP* #9 Olympus/Litho *UP* */Miscellaneous/* Status EVBond *UP* KSBonder *UP* KSCoat *UP* Litho SRD *UP* Mask Cleaner *UP* -------------- next part -------------- An HTML attachment was scrubbed... URL: